LIGO Document D961183-x0

Vac/Util Pipe Arrangement - Lower Plan, Left Mid Station, Washington Site, LIGO Vacuum Equipment, Rev. 04 - AS BUILT

Document #:
LIGO-D961183-x0
Document type:
D - Drawings
Abstract:
None
Files in Document:
Authors:
Notes and Changes:
Migrated document information from the old DCC:
- Full document number: LIGO-D961183-04-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1998-05-22
- Document received date: 1998-06-12
- Document entry date: 1998-06-12
- ContDocNo: V049-5-026, Rev. 4
- Location: Livingston

Rev D961183-03-V:
- Full document number: LIGO-D961183-03-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1997-06-06
- Document received date: 1997-07-11
- Document entry date: 1997-07-11
- ContDocNo: V049-5-026, Rev 3
- Location: Livingston

Rev D961183-00-V:
- Full document number: LIGO-D961183-00-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1996-05-07
- Document received date: 1996-05-07
- Document entry date: 1996-07-15
- ContDocNo: V049-5-026, Rev. 0
- Location: Livingston

DCC Version 3.4.2, contact DCC Help