LIGO Document E0900029-v1

H1 HAM4 97/3 BS Installation

Document #:
LIGO-E0900029-v1
Document type:
E - Engineering documents
Other Versions:
LIGO-E0900029-x0
10 Feb 2009, 16:13
Abstract:
This procedure describes the swap of the H1 HAM4 DC/RF output beam splitter, currently 50/50, for the eLIGO final configuration one of 97/3.
Files in Document:
Other Files:
Keywords:
HAM4 BS
Notes and Changes:
Installed OBS was measured to be 95/5, 3/8" and P-Pol.

DCC Version 3.4.2, contact DCC Help