LIGO Document E1100481-v1

Mode Cleaner Tube Baffle & Manifold/Cryopump Baffle Fabrication, Installation, and Test Plan

Document #:
LIGO-E1100481-v1
Document type:
E - Engineering documents
Other Versions:
Abstract:
This document describes the plan for acceptance testing of the Mode Cleaner Tube Baffle and the Manifold/Cryopump Baffle subassemblies during manufacturing, and for testing the final assembly before installing in the aLIGO chambers.
Authors:
Keywords:
AOS SLC Baffles
Notes and Changes:
OBSOLETE
SEE: E1100607-v5 SLC Manifold Cryopump Baffle Assembly and Installation Document
SEE: E1100718-v8 Mode Cleaner Tube Baffle Assembly and Installation Procedure

DCC Version 3.4.2, contact DCC Help