LIGO Document E1200662-v2

AOS SLC BS Elliptical Baffle Production Plan

Document #:
LIGO-E1200662-v2
Document type:
E - Engineering documents
Other Versions:
LIGO-E1200662-v1
03 Jul 2012, 17:44
Abstract:
This document describes the plan for acquisition of parts, components, and materials needed for fabrication of six (6) BS Elliptical Baffle.
Keywords:
BS Elliptical Baffle
Notes and Changes:
7-30-12 Added Fabrication, installation and test schedule
Related Documents:

DCC Version 3.4.2, contact DCC Help