LIGO Document G1901510-v1

A+ Beamsplitter material long lead review

Document #:
LIGO-G1901510-v1
Document type:
G - Presentations (eg Graphics)
Other Versions:
Abstract:
Material lead times are long, enough is known now to approve the procurement of the A+ Beamsplitter substrates without waiting for the complete design package.

References:
aLIGO requirements D080050 and E080035
Yamamoto analysis G1800155
Petterson analysis T1900258

Keywords:
BS Coating
Related Documents:

DCC Version 3.4.2, contact DCC Help