D1500163-v3 Annular End Reaction Mass (AERM) Eduardo Sanchez et al. System Engineering
Basic R&D
18 Sep 2015
T2400385-v1 TMT test report draft - email GariLynn Billingsley Reports
14 Nov 2024
E2300026-v1 Surface Profiles of 100mm AlGaAs-coated Samples (SN: 1800006-03 and 1800006-04) Camille Makarem et al. Basic R&D
22 Oct 2024
G2201608-v1 Surface Analysis of AlGaAs Coating on 100mm Sample Camille Makarem et al. Basic R&D
22 Oct 2024
G1100283-v1 Effect of Heat Treatment on the Optical Absorption of Dielectric Coatings: effect of temperature and Oxygen pressure Ashot Markosyan et al. Core Optics
02 Oct 2024
E1000863-v1 QA Test Procedure for aLIGO COC Reflection Transmission Scatter and Absorption Liyuan Zhang et al. Core Optics
Subsystem Test
16 Sep 2024
E1400259-x0 aLIGO COC Design GariLynn Billingsley Core Optics
Final Design
04 Jun 2024
E1500377-v1 ETM10 Figure Measurement GariLynn Billingsley Core Optics
Quality Assurance
17 Apr 2024
E080031-v1 MIRROR BLANK MATERIAL, AdLIGO ITM MIRROR GariLynn Billingsley et al. Fabrication
Core Optics
Final Design
11 Mar 2024
E080047-v1 Mirror Blank Material, AdLIGO ETM Mirror Specification GariLynn Billingsley et al. Fabrication
Core Optics
Final Design
11 Mar 2024
E1000798-v2 CP03 Characterization GariLynn Billingsley Core Optics
Subsystem Test
04 Mar 2024
C1501364-v2 RFQ for fabrication of Annular End Reaction Mass substrate GariLynn Billingsley Fabrication
Suspensions
Core Optics
Procurements
08 Aug 2023
C1501363-v3 Statement of work SOW for fabrication of Annular End Reaction Mass substrate GariLynn Billingsley Suspensions
Core Optics
Procurements
Fabrication
02 Aug 2023
E1100881-v1 ETM12 Characterization GariLynn Billingsley Subsystem Test
Core Optics
31 Jul 2023
T2000643-v1 Characterizing the figure change after coating of PEN-ITM02 at LMA GariLynn Billingsley et al. Core Optics
Fabrication
20 Jul 2023
T1300653-v1 Measurement Uncertainties in Determining the Radius of Curvature for SR2-04 Rodica Martin et al. Input Optics
Core Optics
11 Jul 2023
T1300741-v1 Measurement Uncertainties in Determining the Radius of Curvature for SRM-08 Rodica Martin et al. Subsystem Test
Core Optics
Input Optics
11 Jul 2023
T1300747-x0 Measurement Uncertainties in Determining the Radius of Curvature for IMCC-02 Rodica Martin et al. Input Optics
Core Optics
Subsystem Test
11 Jul 2023
T1300746-v1 Measurement Uncertainties in Determining the Radius of Curvature for SR2-03 Rodica Martin et al. Subsystem Test
Input Optics
Core Optics
11 Jul 2023
T1300745-v1 Measurement Uncertainties in Determining the Radius of Curvature for SRM-05 Rodica Martin et al. Subsystem Test
Core Optics
Input Optics
11 Jul 2023
T1300740-v1 Measurement Uncertainties in Determining the Radius of Curvature for PRM-02 Rodica Martin et al. Subsystem Test
Core Optics
Input Optics
11 Jul 2023
T1300744-v1 Measurement Uncertainties in Determining the Radius of Curvature for PR2-04 Rodica Martin et al. Subsystem Test
Core Optics
Input Optics
11 Jul 2023
T1300743-v1 Measurement Uncertainties in Determining the Radius of Curvature for PRM-04 Rodica Martin et al. Core Optics
Input Optics
Subsystem Test
11 Jul 2023
E1900280-x0 FIM02 Characterization GariLynn Billingsley Core Optics
A+
Subsystem Test
07 Jul 2023
E1900282-x0 FIM04 Characterization GariLynn Billingsley Core Optics
A+
Subsystem Test
07 Jul 2023
E1200484-x0 aLIGO, COC GariLynn Billingsley et al. Core Optics
06 Jul 2023
E1000763-x0 aLIGO COC Testing and Commissioning Documentation GariLynn Billingsley Subsystem Test
Core Optics
31 May 2023
E2300136-v1 DCN Revised Disc Insert (welding puck) GariLynn Billingsley et al. Fabrication
Suspensions
15 May 2023
E1201035-v25 aLIGO Chamber Entry & Exit Procedures Calum Torrie et al. System Engineering
Safety
27 Mar 2023
E1300312-v4 ETM08 HR Coating Absorption Liyuan Zhang et al. Core Optics
Subsystem Test
21 Mar 2023
E1300313-v2 ETM08 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
03 Mar 2023
E1300555-v3 ETM12 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
03 Feb 2023
E1300311-v3 ETM08 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
02 Feb 2023
E1000781-v1 ETM07 Characterization GariLynn Billingsley Core Optics
Subsystem Test
31 Jan 2023
E1000782-v1 ETM08 Characterization GariLynn Billingsley Core Optics
Subsystem Test
31 Jan 2023
E1000784-x0 ETM10 Characterization GariLynn Billingsley Core Optics
Subsystem Test
31 Jan 2023
E1000783-x0 ETM09 Characterization GariLynn Billingsley Subsystem Test
Core Optics
31 Jan 2023
D2100303-v1 A304 - FCES Elevations - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. A+
Observatory Facilities
16 Nov 2021
D2100302-v1 A303 - FCES Elevations - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. Observatory Facilities
A+
16 Nov 2021
D2100298-v1 A205 - Filter Cavity End Station - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. Observatory Facilities
A+
16 Nov 2021
E1300674-v2 ITM09 HR AR Absorption Liyuan Zhang et al. Core Optics
Subsystem Test
13 Jan 2023
T1700149-v8 ITM characteristic summary GariLynn Billingsley Core Optics
17 Nov 2022
G2200853-v2 Core Optics and Point Absorber Mitigation GariLynn Billingsley et al. Reviews
Core Optics
03 Nov 2022
E1300556-v1 ETM12 HR Coating Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
09 Mar 2022
E0900394-v6 aLIGO optic container shipping and storage procedure GariLynn Billingsley et al. Core Optics
20 Sep 2022
M2100169-v2 Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 Sheila Rowan et al. Basic R&D
Core Optics
Technical Review Board
A+
Memorandum
Upgrades
04 Aug 2022
E1300557-v1 ETM12 Transmission Liyuan Zhang et al. Subsystem Test
Core Optics
09 Mar 2022
E1000793-x0 FM01 Characterization GariLynn Billingsley Subsystem Test
Core Optics
20 Jul 2022
E1300314-v1 ETM08 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
16 Oct 2015
E1300558-v1 ETM12 AR Reflection Liyuan Zhang et al. Core Optics
Subsystem Test
09 Mar 2022
C2100241-v1 SOW A+ Coating Development and Test Mass Production GariLynn Billingsley Core Optics
A+
25 May 2022
E1500139-v3 ETM11 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
24 May 2022
E1500142-v2 ETM14 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
24 May 2022
T2100216-v1 Aluminum Ablation Evaluation May 2021 SN1535 GariLynn Billingsley et al. Operations
Core Optics
24 May 2022
T2000526-v1 Damage test Ink and First Contact GariLynn Billingsley et al. Cleaning
Core Optics
24 May 2022
E1000768-x0 ITM05 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000774-v1 ITM11 Characterization GariLynn Billingsley Subsystem Test
Core Optics
10 Nov 2021
E1500125-x0 ETM12 ETM AR coating waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
09 Mar 2022
E1500105-x0 ETM12 Polish waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
09 Mar 2022
E1500104-x0 ETM12 Coating, 532 nm reflection waiver. GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
09 Mar 2022
E1500097-x0 ETM12 Coating, spherical aberration waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
09 Mar 2022
E1500078-x0 ETM12 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
09 Mar 2022
E2100395-v1 Witness sample SN1009-LMA005 80 mm, ETM HR stack, Aluminum foil on mount, nearby panels and shutter GariLynn Billingsley et al. Subsystem Test
Core Optics
10 Feb 2022
G2200124-v1 Core Optics Test Mass Coating Update GariLynn Billingsley Core Optics
03 Feb 2022
E1900150-v1 MIRROR BLANK SPECIFICATION, A+ BEAMSPLITTER GariLynn Billingsley A+
Core Optics
03 Feb 2022
E1800345-x0 A+, ISC GariLynn Billingsley A+
13 Jan 2022
T1600486-x0 The Coating RIng-down MEasurement system (CRiMe) Document Tree Eric Gustafson et al. Basic R&D
03 Jan 2022
P960044-x0 Optics Development for LIGO GariLynn Billingsley et al. Document Migration
30 Dec 2021
T2100517-v1 CSIRO aLIGO Beamsplitter Coating Design - compendium GariLynn Billingsley Core Optics
08 Dec 2021
D1900148-v1 MIRROR SUBSTRATE DRAWING, A+ FILTER CAVITY INPUT MIRROR (FC1) GariLynn Billingsley et al. A+
Auxiliary Optics
03 Dec 2021
E2000079-v2 Description of Advanced LIGO era coating witness samples GariLynn Billingsley et al. Subsystem Test
Core Optics
03 Dec 2021
D2100346-v1 S103 - FC Tube Enclosure B Foundation and Slab Plan - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. A+
Observatory Facilities
16 Nov 2021
D2100301-v1 A302 - FCTE Overall Elevations - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. Observatory Facilities
A+
16 Nov 2021
D2100294-v1 A200 - Overall Plan - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. A+
Observatory Facilities
16 Nov 2021
D2100345-v1 S102 - Filter Cavity End Station FCES Foundation and Slab Plan - APLUS LHO Facilities Construction Drawing Index Anthony Simon et al. A+
Observatory Facilities
16 Nov 2021
E1500091-x0 ITM11 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
10 Nov 2021
E1500113-x0 ITM11 Polish waiver, sleek GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
10 Nov 2021
E1500128-x0 ITM11 AR coating waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
10 Nov 2021
E1400037-v1 ITM11 Figure Measurement Report GariLynn Billingsley Subsystem Test
Core Optics
10 Nov 2021
E1400041-v1 ITM11 Integrated Scatter Liyuan Zhang et al. Core Optics
Subsystem Test
10 Nov 2021
E1400042-v1 ITM11 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
10 Nov 2021
E1400043-v1 ITM11 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
10 Nov 2021
G1900693-v1 HWS absorption map and Transmission map Comparison O3 Test masses GariLynn Billingsley et al. Core Optics
10 Nov 2021
E1400060-v2 ITM03 and ITM11 coating defect analysis GariLynn Billingsley Core Optics
Subsystem Test
10 Nov 2021
E1500085-x0 ITM05 Coating, ripple waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
07 Nov 2021
E1500111-x0 ITM05 Polish waiver, excess defects GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
07 Nov 2021
E1700247-v1 ITM05 Figure Measurement Report GariLynn Billingsley Core Optics
Subsystem Test
07 Nov 2021
E1700270-v1 ITM05 HR AR Absorption Liyuan Zhang et al. Core Optics
Subsystem Test
07 Nov 2021
E1700191-v1 ITM05 Integrated Scatter Liyuan Zhang et al. Core Optics
Subsystem Test
07 Nov 2021
E1700231-v1 ITM05 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
07 Nov 2021
E1700266-v1 ITM05 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
07 Nov 2021
T1100624-x0 Dark Field microscope inspection at Caltech ITM05 GariLynn Billingsley Core Optics
07 Nov 2021
D1900150-v2 MIRROR BLANK DRAWING, A+ BEAMSPLITTER GariLynn Billingsley A+
Core Optics
07 Oct 2021
D1900151-v2 A+, COC, BBS SUBSTRATE GariLynn Billingsley A+
Core Optics
07 Oct 2021
E2000107-v1 Witness sample, SN0932-21 LMA Coating Run C11068 GariLynn Billingsley et al. Subsystem Test
Core Optics
07 Sep 2021
M1800264-v1 A+ Project Execution Plan Hannah Hansen et al. A+
13 Aug 2021
E1300017-v8 First Contact Spray Application & Removal Procedure Calum Torrie et al. System Engineering
12 Aug 2021
T990164-v1 RM06 GariLynn Billingsley Document Migration
20 Jul 2021
E080511-v6 ITM Polish Specification Mick Flanigan Core Optics
Final Design
14 Jul 2021
E1300431-v1 ETM09 Figure Measurement GariLynn Billingsley Subsystem Test
Core Optics
17 Jan 2017
E2000633-x0 DCN for update of End Test Mass specifications - change radius of curvature requirement GariLynn Billingsley Procurements
A+
Operations
Core Optics
23 Dec 2020
E0900095-v1 DCN for Advanced LIGO Polishing Revision ITM and ETM GariLynn Billingsley Core Optics
Final Design
23 Dec 2020
G2001920-v3 Custom polish figure for O4 ETMs GariLynn Billingsley et al. Core Optics
04 Dec 2020
E1000799-v2 CP04 Characterization GariLynn Billingsley Subsystem Test
Core Optics
09 Oct 2020
T1300642-v1 Sapphire Prism bond test: Results GariLynn Billingsley et al. System Engineering
Suspensions
Activity
23 Sep 2020
E1200266-v2 Ground Glass Freon Wipe Cleaning Procedure Margot Hennig et al. Core Optics
Input Optics
Auxiliary Optics
Cleaning
20 Feb 2013
T1900696-v1 Documentation of LLO ETM Inspection during Mid-O3 Vent GariLynn Billingsley et al. Core Optics
10 Aug 2020
E1900149-v3 MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY END MIRROR GariLynn Billingsley Auxiliary Optics
A+
04 Aug 2020
D1900149-v1 MIRROR SUBSTRATE DRAWING, A+ FILTER CAVITY END MIRROR (FC2) GariLynn Billingsley et al. A+
Auxiliary Optics
28 Jul 2020
E1000778-x0 ETM04 Characterization GariLynn Billingsley Core Optics
Subsystem Test
29 Jan 2015
E1500110-x0 ITM03 Polish waiver, excess defects GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
20 Jun 2020
E1700080-x0 AERM08 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700079-x0 AERM07 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700078-x0 AERM06 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700077-x0 AERM05 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1100938-x0 SRM-08 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100937-x0 SRM-07 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100936-x0 SRM-06 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100935-x0 SRM-05 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100934-x0 SRM-04 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100933-x0 SRM-03 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100932-x0 SRM-02 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100931-x0 SRM-01 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100930-x0 SR2-04 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100929-x0 SR2-03 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100928-x0 SR2-02 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100927-x0 SR2-01 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100926-x0 PRM-04 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100925-x0 PRM-03 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100924-x0 PRM-02 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100923-x0 PRM-01 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100922-x0 PR2-04 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100921-x0 PR203 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100920-x0 PR2-02 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100919-x0 PR2-01 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100914-x0 F-SRM-04 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100913-x0 F-SRM-03 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100912-x0 F-SRM-02 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100911-x0 F-SRM-01 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100910-x0 F-SR2-02 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100909-x0 F-SR2-01 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100908-x0 F-PRM-02 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100907-x0 F-PRM-01 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100906-x0 F-PR2-02 Characterization GariLynn Billingsley Subsystem Test
Input Optics
16 Jun 2020
E1100905-x0 F-PR2-01 Characterization GariLynn Billingsley Input Optics
Subsystem Test
16 Jun 2020
E1100885-v1 ETM16 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1100883-x0 ETM14 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1100882-x0 ETM13 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1100880-x0 ETM11 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1100879-x0 FM06 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1100878-x0 FM05 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1100877-x0 FM04 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000821-x0 ERM08 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000820-x0 ERM07 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000819-x0 ERM06 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000818-x0 ERM05 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000817-x0 ERM04 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000816-x0 ERM03 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000815-x0 ERM02 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000814-x0 ERM01 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000806-x0 F-PR302 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000805-x0 F-PR301 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000804-x0 CP09 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000803-x0 CP08 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000802-x0 CP07 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000801-x0 CP06 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000800-x0 CP05 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000797-x0 CP02 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000796-x0 CP01 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000795-x0 FM03 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000794-x0 FM02 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000792-x0 BS06 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000791-x0 BS05 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000790-x0 BS04 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000789-x0 BS03 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000788-v1 BS02 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000787-x0 BS01 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000780-x0 ETM06 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000779-x0 ETM05 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000777-x0 ETM03 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000776-x0 ETM02 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000775-x0 ETM01 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000772-x0 ITM09 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000770-v1 ITM07 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000769-x0 ITM06 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000767-x0 ITM04 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
E1000765-x0 ITM08 Characterization GariLynn Billingsley Core Optics
Subsystem Test
16 Jun 2020
E1000764-x0 ITM01 Characterization GariLynn Billingsley Subsystem Test
Core Optics
16 Jun 2020
T1000456-v1 Bulk absorption measurement of the CP01 substrate, Heraeus suprasil 3001 Rand Dannenberg et al. Core Optics
24 Apr 2020
E1900199-v2 ETM Polishing Specification for re-polish GariLynn Billingsley Final Design
Core Optics
02 Dec 2019
E2000135-v1 DCN for release of A+ Beamsplitter BBS drawings and specifications GariLynn Billingsley A+
Core Optics
11 Mar 2020
E1900151-v1 MIRROR SUBSTRATE SPECIFICATION, A+ BEAMSPLITTER GariLynn Billingsley A+
Core Optics
10 Mar 2020
G2000337-v2 Microscopy of witness sample SN1549 ITM03/11 HR GariLynn Billingsley Core Optics
09 Mar 2020
E2000164-v1 ETM14 HR Coating Absorber images Liyuan Zhang et al. Core Optics
Subsystem Test
01 Mar 2020
E2000163-v1 ETM11 HR Coating Absorber images Liyuan Zhang et al. Core Optics
Subsystem Test
01 Mar 2020
E1500143-v1 ETM14 HR Coating Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
01 Mar 2020
F0810001-v5 Technical Direction Memorandum - Template GariLynn Billingsley Procurements
27 Feb 2020
G1902383-v2 Absorption Test and microscopy of witness sample SN1549 ITM03/11 HR GariLynn Billingsley Core Optics
24 Feb 2020
E1900381-v1 FTIR - ETM09 First Contact Residue on S1 HR Surface. Stephen Appert et al. System Engineering
Core Optics
03 Dec 2019
C1900313-v1 SOW for precision polish, Filter Cavity Input and End Mirrors GariLynn Billingsley Procurements
A+
Core Optics
06 Dec 2019
C1900175-v3 SOW for precision polish, End Test Masses GariLynn Billingsley Core Optics
Procurements
30 Jul 2019
D1900269-v1 End Test Mass Substrate re-polish Calum Torrie et al. Final Design
Core Optics
02 Dec 2019
E1900148-v2 MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR GariLynn Billingsley Auxiliary Optics
A+
21 Oct 2019
P1900316-v1 Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO David Reitze et al. Activity
Detector
Basic R&D
11 Oct 2019
G1901510-v1 A+ Beamsplitter material long lead review GariLynn Billingsley Requirements
Core Optics
A+
20 Aug 2019
T1800013-v1 ITM03 LHO ITMx post O2 inspection GariLynn Billingsley et al. Core Optics
17 Aug 2019
E1300330-v1 ETM09 Integrated Scatter Liyuan Zhang et al. Core Optics
Subsystem Test
16 Oct 2015
T1900410-v1 Desired results of the Cosmic Explorer engineering study Rana Adhikari et al. Vacuum
Conceptual Design
Observatory Facilities
09 Jul 2019
E1900147-v1 MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR GariLynn Billingsley et al. Auxiliary Optics
A+
07 Jun 2019
E1900146-v1 MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR GariLynn Billingsley et al. Auxiliary Optics
A+
07 Jun 2019
D1900146-v1 MIRROR BLANK DRAWING, A+ FILTER CAVITY, END MIRROR GariLynn Billingsley et al. A+
Auxiliary Optics
07 Jun 2019
D1900147-v1 MIRROR BLANK DRAWING, A+ FILTER CAVITY, INPUT MIRROR GariLynn Billingsley et al. Auxiliary Optics
A+
07 Jun 2019
E080494-v3 Core Optics Components Final Design Gregg Harry et al. Final Design
Core Optics
16 Apr 2019
T000127-v4 Core Optics Components (COC) Design Requirements Document (DRD) Gregg Harry et al. Core Optics
Final Design
16 Apr 2019
G1900666-v1 A+ for LIGO GariLynn Billingsley Meeting
A+
Core Optics
06 Apr 2019
E1400010-v2 ITM03 HR AR Absorption Liyuan Zhang et al. Core Optics
Subsystem Test
27 Feb 2019
G1800345-v1 ITM03 LHO ITMx post O2 inspection - LVC Presentation GariLynn Billingsley et al. Core Optics
04 Feb 2019
E1000079-v9 First Contact Brush and Pour Application Procedure Margot Hennig et al. System Engineering
Core Optics
19 Dec 2018
P1600076-v1 The Effect of Time on Optical Coating Mechanical Loss and Implications for LIGO-India Gregg Harry et al. Core Optics
Basic R&D
07 Dec 2018
E1800238-v1 CASI 300 mm focal length mirror substrate GariLynn Billingsley et al. Core Optics
26 Oct 2018
E1400363-x0 Collection of Documents associated with cleaning optics for advanced LIGO Calum Torrie et al. System Engineering
Core Optics
01 Aug 2018
E030309-x0 SPECIFICATION - Fused Silica Blank, LASTI Test Mass, R&D GariLynn Billingsley Document Migration
27 Jul 2018
E1700272-v1 ITM10 HR AR Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
14 Jun 2018
E1700268-v1 ITM10 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
14 Jun 2018
E1700233-v1 ITM10 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
14 Jun 2018
E1700193-v1 ITM10 Integrated Scatter Liyuan Zhang et al. Core Optics
Subsystem Test
14 Jun 2018
E1300673-v2 ITM09 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
14 Jun 2018
E1300672-v3 ITM09 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
14 Jun 2018
E1500191-v1 ITM09 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
14 Jun 2018
T1400562-v1 ITM09 Mounting flat fracture GariLynn Billingsley Core Optics
14 Jun 2018
G1301053-v1 ITM09 AR characterization Summary GariLynn Billingsley et al. Core Optics
14 Jun 2018
T1100623-x0 Dark Field microscope inspection at Caltech ITM09 GariLynn Billingsley Core Optics
14 Jun 2018
E1300655-v1 ITM09 Figure Measurement GariLynn Billingsley Subsystem Test
Core Optics
14 Jun 2018
E1700192-v1 ITM07 Integrated Scatter Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1700232-v1 ITM07 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1700271-v1 ITM07 HR AR Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1700267-v1 ITM07 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1500190-v1 ITM06 Transmission Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1500189-v1 ITM06 AR Reflection Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1500187-v1 ITM06 Integrated Scatter Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1300886-v1 ITM06 Figure Measurement GariLynn Billingsley Core Optics
Subsystem Test
12 Jun 2018
E1200265-v3 ITM04 Figure Measurement GariLynn Billingsley Subsystem Test
Core Optics
12 Jun 2018
E1200702-v1 ITM04 Transmission Liyuan Zhang et al. System Test
Core Optics
12 Jun 2018
E1200704-v1 ITM04 HR AR Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1200703-v1 ITM04 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1200701-v1 ITM04 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1300943-v2 ITM03 Figure Measurement Report GariLynn Billingsley Core Optics
Subsystem Test
12 Jun 2018
E1400009-v1 ITM03 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1400008-v1 ITM03 Transmission Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1200623-v2 ITM08 Figure measurement GariLynn Billingsley Subsystem Test
Core Optics
12 Jun 2018
E1500101-x0 ITM08 Coating, spherical aberration waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
12 Jun 2018
E1200575-v2 ITM08 Transmission Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1200577-v2 ITM08 HR AR Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1200576-v2 ITM08 AR Reflection Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1200574-v2 ITM08 Integrated Scatter Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
T1200293-v1 ITM08 Barrel damage inspection GariLynn Billingsley Core Optics
Subsystem Test
12 Jun 2018
E1700230-v1 ITM01 Transmission Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1700265-v1 ITM01 AR Reflection Liyuan Zhang et al. Core Optics
Subsystem Test
12 Jun 2018
E1700190-v1 ITM01 Integrated Scatter Liyuan Zhang et al. System Test
Core Optics
12 Jun 2018
E1500188-v1 ITM06 HR AR Absorption Liyuan Zhang et al. Subsystem Test
Core Optics
12 Jun 2018
E1500264-v3 Annular End Reaction Mass Conceptual/Final Design Document GariLynn Billingsley et al. Suspensions
Final Design
12 Jun 2018
E1800164-v1 Coating specification - 100 mm Crystalline coating demonstration GariLynn Billingsley Core Optics
Basic R&D
07 Jun 2018
E1800006-v3 Polish Specification - 100 mm Crystalline coating demonstration substrate GariLynn Billingsley Core Optics
Basic R&D
07 Jun 2018
D1800154-v2 Drawing - 100 mm Crystalline coating demonstration GariLynn Billingsley et al. Basic R&D
Core Optics
07 Jun 2018
E1000278-v7 Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) Margot Hennig et al. Final Design
Suspensions
28 Aug 2012
G1702201-v2 Advanced LIGO coating history GariLynn Billingsley et al. Core Optics
15 Nov 2017
E1500376-v1 ETM13 Figure Measurement GariLynn Billingsley Core Optics
Quality Assurance
16 Aug 2017
E1700163-v1 ITM10 figure measurement GariLynn Billingsley Subsystem Test
Core Optics
15 Aug 2017
P1700029-v5 Characterization of Advanced LIGO Core Optics GariLynn Billingsley et al. Public Talk / Colloquium
20 Jul 2017
E1700229-v1 ITM07 Figure Measurement GariLynn Billingsley Subsystem Test
Core Optics
10 Jul 2017
E1600288-v1 Initial Inspection of PMC Bench #10 at CIT Sept 2016 GariLynn Billingsley et al. System Engineering
Core Optics
04 Oct 2016
G1700743-v1 Characterization of Advanced LIGO Core Optics GariLynn Billingsley et al. Core Optics
Public Talk / Colloquium
21 Apr 2017
E1600262-v4 aLIGO OMC: Spare OMC production plan Koji Arai et al. Assembly
Sensing and Control
09 Dec 2016
T1600499-v2 CP04 Gold Coating Inspection of overspray GariLynn Billingsley et al. Fabrication
Core Optics
01 Nov 2016
P1600237-v1 CQG+ Article for The Effect of Time on Optical Coating Mechanical Loss and Implications for LIGO-India Gregg Harry et al. Core Optics
Basic R&D
27 Jul 2016
C1600914-v1 SOW SRM Coating 33% GariLynn Billingsley Core Optics
Procurements
25 Jul 2016
C1600913-v1 RFQ aLIGO SRM coating 33% GariLynn Billingsley Core Optics
Procurements
25 Jul 2016
E1600202-v2 Coated Substrate, ALIGO Signal Recycling Mirror, T = 33% GariLynn Billingsley Final Design
Core Optics
13 Jul 2016
D0900949-v2 End Reaction Mass ESD Coating Face Pattern Margot Hennig Core Optics
Procurements
Final Design
06 Jul 2016
G030035-v1 Core Optics Sapphire Development GariLynn Billingsley Document Migration
05 Apr 2016
E1600082-v1 RTS Test Bench 2” dia. Gold-coated Elliptical Mirror Specifications Liyuan Zhang et al. Core Optics
Subsystem Test
14 Mar 2016
G1600326-v1 Inside LIGO - Presented at CSIRO, Lindfield GariLynn Billingsley et al. Public Talk / Colloquium
22 Feb 2016
T1400711-v1 Prism removal from ITM09 GariLynn Billingsley et al. Suspensions
Core Optics
16 Dec 2015
C1501385-v1 RFQ Gold coating of custom Compensation Plate (CP) and Annular End Reaction Mass (AERM) GariLynn Billingsley Procurements
Core Optics
02 Dec 2015
E080035-v1 Specification: Mirror Blank Material, Adv. LIGO Beamsplitter (BS) Mirror GariLynn Billingsley et al. Core Optics
Final Design
Fabrication
06 Nov 2015
E1300329-v1 ETM09 Transmission Liyuan Zhang et al. Subsystem Test
Core Optics
16 Oct 2015
E1300332-v1 ETM09 AR Reflection Liyuan Zhang et al. Subsystem Test
Core Optics
16 Oct 2015
E0900113-v3 Compensation Plate Electro Static Drive gold coating specification GariLynn Billingsley Core Optics
Final Design
02 Sep 2015
E0900112-v3 Compensation Plate Barrel gold coating specification GariLynn Billingsley Final Design
Core Optics
02 Sep 2015
E0900138-v3 End Reaction Mass Electro Static Drive gold coating specification GariLynn Billingsley Final Design
Core Optics
Auxiliary Optics
Sensing and Control
02 Sep 2015
E1500357-x0 DCN for revision of Gold coating specification for ERM and AERM GariLynn Billingsley Core Optics
31 Aug 2015
E1400394-v3 Customized Polish for Advanced LIGO Thin Compensation Plate (CP) GariLynn Billingsley Final Design
Core Optics
15 Jul 2015
T1500200-v1 BRDF of PEEK and stainless steel socket head cap screw - scatter GariLynn Billingsley et al. System Engineering
Basic R&D
27 Apr 2015
T1500177-v1 Inspect PUM Ears D090007 Serial number 0128 GariLynn Billingsley et al. Suspensions
17 Apr 2015
T1000015-v1 Report on Gingin Advisory Committee Meeting of December 8, 2009 Gregg Harry et al. Basic R&D
01 Apr 2015
T1000378-v1 Report on Gingin Advisory Committee Meeting of June 28, 2010 Aidan Brooks et al. Basic R&D
01 Apr 2015
E1500065-x0 BS03 Polish waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
31 Mar 2015
T1100490-v1 Forward scatter comparison CP06 and CP03 GariLynn Billingsley et al. Subsystem Test
Core Optics
31 Mar 2015
T1500104-v1 3IFO COC Inventory Jodi Fauver et al. Core Optics
20 Mar 2015
E1300769-v4 Core Optics Fabrication Acceptance Documentation GariLynn Billingsley et al. Core Optics
12 Mar 2015
T1400252-v3 Imaging Scatterometer Characterization of Advanced LIGO Optic ITM06 Adrian Avila-Alvarez et al. Core Optics
11 Mar 2015
E1500149-v1 ETM11 HR coating pinhole, waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500132-x0 ETM09 HR coating waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500131-x0 ETM08 HR coating waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500130-x0 ITM08 AR coating waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500129-x0 ITM04 AR coating waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500127-x0 ITM03 AR coating waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500126-x0 ITM09 AR coating waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500124-x0 ETM08 ETM AR coating waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500122-v1 ETM AR coating acceptance ETM08 and ETM12 GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500121-v1 ETM08 and ETM09 Pinhole in HR GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500118-x0 SR302 Polish Defect side and bevel fracture, waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500117-x0 SR302 Polish Defect Incorrect arrow and serial number placement, waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500116-x0 SR301 Polish Defect Incorrect arrow and serial number placement, waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500115-x0 SR301 Polish Defect side and bevel fracture, waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500114-x0 PR303 Polish Defect waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500112-x0 ITM06 Polish waiver, Bevel Defect GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500109-x0 ITM01 Polish waiver, excess defects GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500108-x0 ETM14 Polish waiver, excess defects GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500107-x0 ETM11 Polish waiver, Barrel scuff GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500106-x0 ETM13 Polish waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500103-x0 ETM09 Coating, 532 nm reflection waiver. GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500102-x0 ETM08 Coating, 532 nm reflection waiver. GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500100-x0 ITM04 Coating, spherical aberration waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500099-x0 ETM14 Coating, spherical aberration waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500098-x0 ETM11 Coating, spherical aberration waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500096-x0 ETM09 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500095-x0 ETM08 Coating, spherical aberration waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500094-x0 ITM09, Mounting flat fracture, waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500093-x0 ITM09 Coating, Haze on AR surface, waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500092-x0 ITM06 Coating, Haze on AR surface GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500089-x0 ITM10 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500088-x0 ITM09 Coating, ripple waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500087-x0 ITM07 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500086-x0 ITM06 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500084-x0 ITM03 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500083-x0 ITM01 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500082-x0 ETM16 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500081-x0 ETM15 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500080-x0 ETM14 Coating, ripple waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500079-x0 ETM13 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500077-x0 ETM11 Coating, ripple waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500076-x0 ETM10 Coating, ripple waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500075-x0 ETM09 Coating, ripple waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500074-x0 ETM08 Coating, ripple waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500073-x0 ETM07 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500072-x0 ETM07 Coating, spherical aberration waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500071-x0 ETM07 Coating, 532 nm reflection waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500070-x0 ETM03 Polish waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500069-x0 CP09 Absorption waiver GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
11 Mar 2015
E1500068-x0 BS06 Absorption waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500067-x0 BS05 Polish waiver GariLynn Billingsley Quality Assurance
Subsystem Test
Core Optics
11 Mar 2015
E1500066-x0 BS04 polish waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500064-x0 BS04 AR Absorption waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
E1500063-x0 BS03 AR Absorption waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500062-x0 BS02 AR Absorption waiver GariLynn Billingsley Subsystem Test
Quality Assurance
Core Optics
11 Mar 2015
E1500061-x0 BS01 AR Absorption waiver GariLynn Billingsley Core Optics
Quality Assurance
Subsystem Test
11 Mar 2015
L1200291-v5 TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions Calum Torrie et al. Installation
System Engineering
11 Mar 2015
E1500170-x0 Core Optics Fabrication Acceptance links aLIGO GariLynn Billingsley Core Optics
Quality Assurance
11 Mar 2015
T1000382-v2 Advanced LIGO Core Optics Material Design summary GariLynn Billingsley Final Design
Core Optics
09 Feb 2015
E1000158-v1 Advanced LIGO Thin Compensation Plate (CP) GariLynn Billingsley Final Design
Core Optics
30 Jan 2015
E1000771-x0 ITM02 Characterization GariLynn Billingsley Core Optics
Subsystem Test
29 Jan 2015
E1400472-v3 Test Mass In Situ Cleaning Procedure GariLynn Billingsley et al. System Engineering
Core Optics
15 Dec 2014
G1400396-v5 Plenary Lecture for SPIE Laser Damage 2014 Calum Torrie et al. System Engineering
18 Sep 2014
G1400209-v2 Laser Induced Damage due to Particulate Contamination GariLynn Billingsley et al. Core Optics
Basic R&D
08 Sep 2014
E1200326-v2 First Contact cleaning of water spots or water soluble contamination GariLynn Billingsley et al. Core Optics
Cleaning
04 Sep 2014
E1300498-v1 Folding Mirror Coating Uniformity Demonstration - specification GariLynn Billingsley Core Optics
10 Jul 2014
E0900397-x0 DCN for aLIGO optic container shipping procedure GariLynn Billingsley Core Optics
20 Jun 2014
T1400403-v1 Scatter measurement of small aLIGO Lenses GariLynn Billingsley et al. Input Optics
System Test
13 Jun 2014
E1400261-x0 DCN aLIGO ETM Coating Specification GariLynn Billingsley Core Optics
03 Jun 2014
T1200324-v18 Test Mass Optics: Summary of Location, Type, Method of Suspension, Install Dates Norna Robertson et al. Installation
Core Optics
Suspensions
07 Apr 2014
E980064-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
20 Mar 2014
E970126-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
20 Mar 2014
E970124-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
20 Mar 2014
E970065-x0 Document Change Notice GariLynn Billingsley Document Migration
20 Mar 2014
E960109-x0 Component Specification - Substrate, Beam Splitter Rework GariLynn Billingsley Document Migration
20 Mar 2014
G960251-x0 LIGO Core Optics Procurement, NSF Presentation GariLynn Billingsley Document Migration
14 Mar 2014
G960242-x0 Core Optics Procurement GariLynn Billingsley Document Migration
14 Mar 2014
L1000357-v3 Advanced LIGO Review Committee Report: Monolithic Stage of the Quad Suspension Douglas Cook et al. Suspensions
Final Design
Reviews
05 Feb 2014
P1400005-v1 Sapphire mirror for the KAGRA gravitational wave detector Eiichi Hirose et al. Core Optics
23 Jan 2014
T1300612-v1 Figure measurement of 6" aLIGO Trans Mon Flats GariLynn Billingsley Auxiliary Optics
02 Jul 2013
T1300533-v1 AR Coating Etching Tests Margot Hennig et al. Core Optics
13 Jun 2013
E070124-v3 Septum Window Coating Specification Lisa Austin et al. Fabrication
Auxiliary Optics
18 Mar 2013
T080026-x0 Core Optics Components Design Requirements Document - intermediate/old VERSION GariLynn Billingsley et al. Document Migration
18 Dec 2012
E1200821-v2 Guidelines for use in de-bonding of epoxy bonds from optics GariLynn Billingsley Suspensions
Input Optics
Core Optics
27 Nov 2012
E010140-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
03 Jul 2012
E010128-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
03 Jul 2012
E010014-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
03 Jul 2012
E010007-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
03 Jul 2012
E000569-x0 Document Change Notice (Filed as D000312-00-D) GariLynn Billingsley Document Migration
29 Jun 2012
E980063-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
19 Jun 2012
E970074-x0 Component Specification - Substrate, Witness Sample GariLynn Billingsley Document Migration
19 Jun 2012
E970053-x0 Problem/Failure Report (PFR) - CSIRO GariLynn Billingsley Document Migration
14 Jun 2012
E960121-x0 Document Change Notice GariLynn Billingsley Document Migration
14 Jun 2012
E960021-x0 Handling LIGO Optics Containers GariLynn Billingsley Document Migration
14 Jun 2012
E950104-x0 Component Specification: Super Polished Substrate, End Test Mass GariLynn Billingsley Document Migration
12 Jun 2012
E950012-x0 Technical Specification for Pathfinder Substrate GariLynn Billingsley et al. Document Migration
12 Jun 2012
G1200565-v1 All about Optics GariLynn Billingsley et al. Core Optics
Cleaning
Basic R&D
Modelling
29 May 2012
T1100609-v1 TCS Periscope 1 Figure measurement GariLynn Billingsley Auxiliary Optics
06 Dec 2011
T1100370-v2 Surface figure calibration and uncertainty estimate for measurement of ETM04 GariLynn Billingsley Core Optics
Subsystem Test
22 Nov 2011
E1101109-v1 PR303 Mass Measurement at Caltech 12.145 Kg GariLynn Billingsley Core Optics
Subsystem Test
18 Nov 2011
E1100684-v1 Figure measurement ETM04 GariLynn Billingsley Subsystem Test
Core Optics
20 Jul 2011
C1105116-v2 SOW for precision polish, End Test Masses GariLynn Billingsley Core Optics
Procurements
28 Jun 2011
E070069-v1 SPECIFICATION - High Quality Window Polish, Advanced LIGO GariLynn Billingsley et al. Auxiliary Optics
Document Migration
16 Jun 2011
T1100128-v2 aLIGO Beamsplitter coating angular acceptance based on as built wedges GariLynn Billingsley et al. Final Design
Core Optics
16 May 2011
G1100493-v5 COC Technical Status - NSF 2011 GariLynn Billingsley Reviews
Core Optics
09 May 2011
G1100216-v2 Core Optics LVC subsystem talk 2011 GariLynn Billingsley Core Optics
Meeting
29 Mar 2011
E1000441-x0 DCN for Advanced LIGO 312 Figure trial - Sample Prepearation E1000440-v1 GariLynn Billingsley Core Optics
17 Sep 2010
E1000440-v1 Advanced LIGO 312 Figure trial – Sample Preparation GariLynn Billingsley Core Optics
17 Sep 2010
T1000381-v1 Advanced LIGO Core Optics Coating Design summary GariLynn Billingsley Final Design
Core Optics
09 Jul 2010
T1000383-v1 Advanced LIGO Core Optics Polishing Design summary GariLynn Billingsley Core Optics
Final Design
09 Jul 2010
T1000380-v1 Caltech WYKO pixel calibration GariLynn Billingsley Core Optics
Subsystem Test
Quality Assurance
09 Jul 2010
E1000159-x0 DCN for Advanced LIGO Thin Compensation Plate polishing specification GariLynn Billingsley Final Design
Core Optics
10 May 2010
E1000080-v2 Coating, Contamination Cavity GariLynn Billingsley System Engineering
10 Mar 2010
M080041-v1 Thickness of PR3 and SR3 and wedge information Norna Robertson Final Design
Suspensions
26 Feb 2010
L1000003-v3 Ear Fabrication Readiness Review Gregg Harry et al. Reviews
Suspensions
Final Design
15 Jan 2010
T0900595-v1 Production Readiness review for Test Mass and Suspension Mass Ears Questions from the Committee Gregg Harry et al. Final Design
Suspensions
25 Nov 2009
E080508-v2 Advanced LIGO Metrology Large Aperture Interferometer GariLynn Billingsley Core Optics
Procurements
21 Oct 2009
E0900233-v1 DCN for Radius of curvature change for SPR3, PR3, F-PR3 GariLynn Billingsley et al. Fabrication
Core Optics
11 Aug 2009
E070141-v1 DCN for ELi Septum Window Coating specification GariLynn Billingsley Vacuum
Fabrication
07 Aug 2009
T0900375-v1 AR absorption measurement on Contamination Cavity Sample GariLynn Billingsley et al. Core Optics
Basic R&D
04 Aug 2009
D080055-v1 ADLIGO ETM MIRROR BLANK GariLynn Billingsley et al. Core Optics
Final Design
16 Jul 2009
D080039-v1 ADLIGO ITM MIRROR BLANK GariLynn Billingsley et al. Core Optics
Final Design
15 Jul 2009
E0900186-v1 DCN for initial release of Advanced LIGO Interferometer for Full Aperture Surface Figure Metrology GariLynn Billingsley Core Optics
01 Jul 2009
T0900204-v2 Analysis of iLigo Witness Plate by Battelle, PNNL GariLynn Billingsley et al. Basic R&D
Core Optics
09 Jun 2009
E0900139-x0 DCN for release of gold coating specifications and mask drawings for Advanced LIGO GariLynn Billingsley Sensing and Control
Auxiliary Optics
Final Design
Core Optics
12 May 2009
E0900142-v1 End Reaction Mass Barrel Coating GariLynn Billingsley Final Design
Suspensions
Core Optics
Auxiliary Optics
System Engineering
12 May 2009
E080041-v1 Specification: Mirror Blank Material, Adv. LIGO Recycling Mirror 3 GariLynn Billingsley et al. Fabrication
Core Optics
Final Design
12 May 2009
E080045-v1 Specification: Blank Material, Adv. LIGO Folding Mirror GariLynn Billingsley et al. Fabrication
Core Optics
Final Design
12 May 2009
E080037-v1 Specification: Blank Material, Adv. LIGO Compensation Plate GariLynn Billingsley et al. Fabrication
Final Design
Core Optics
12 May 2009
E080530-v1 DCN for Advanced LIGO Polishing GariLynn Billingsley Core Optics
05 Jan 2009
E080500-x0 Large Optics Draft Polishing Specifications for Vendor Review GariLynn Billingsley Document Migration
13 Oct 2008
T080185-x0 Bulk scattering evaluation of the Suprasil 311SV fused silica GariLynn Billingsley et al. Document Migration
13 Aug 2008
E080332-x0 Document Change Notice (DCN) - Specification advanced ligo pathfinder polish GariLynn Billingsley Document Migration
16 Jul 2008
E060268-x0 SPECIFICATION - Advanced LIGO Pathfinder Polish GariLynn Billingsley Document Migration
16 Jul 2008
T080152-x0 Questions preliminary design review of silica masses for advanced LIGO Mark Barton et al. Document Migration
20 Jun 2008
T080146-x0 Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review GariLynn Billingsley et al. Document Migration
11 Jun 2008
E080048-x0 Document Change Notice (DCN) - ADLIGO ETM MIRROR BLANK GariLynn Billingsley Document Migration
15 Apr 2008
E080032-x0 Document Change Notice (DCN) - ADLIGO ITM MIRROR BLANK GariLynn Billingsley Document Migration
15 Apr 2008
E080042-x0 Document Change Notice (DCN) - ADLIGO RECYCLING MIRROR 3 BLANK GariLynn Billingsley Document Migration
15 Apr 2008
E080046-x0 Document Change Notice (DCN) - ADLIGO FOLDING MIRROR BLANK GariLynn Billingsley Document Migration
15 Apr 2008
E080038-x0 Document Change Notice (DCN) - ADLIGO CP MIRROR BLANK GariLynn Billingsley Document Migration
15 Apr 2008
E080036-x0 Document Change Notice (DCN) - ADLIGO BS MIRROR BLANK GariLynn Billingsley Document Migration
15 Apr 2008
T080085-x0 Homogeneity Summary - Initial LIGO ETMs and FMs GariLynn Billingsley Document Migration
14 Apr 2008
G080162-x0 The Coating Scattering and Absorption Measurements of LIGO I mirrors at Caltech Helena Armandula et al. Document Migration
11 Apr 2008
E080033-x0 Advanced LIGO Core Optics Components Preliminary Design Helena Armandula et al. Document Migration
08 Feb 2008
T060024-x0 Advanced LIGO Mode Cleaner Wire Suspension Preliminary Design Review Report GariLynn Billingsley et al. Document Migration
16 Jan 2008
T050245-x0 Advanced LIGO Suspension Ribbon/Fiber/Ear/Bonding Preliminary Design Review Report GariLynn Billingsley et al. Document Migration
24 Oct 2007
T070258-x0 Comparison of 311 and 3001 heraeus material homogeneity and OH content for Advanced LIGO GariLynn Billingsley Document Migration
19 Oct 2007
D070273-x0 Metrology V-Block, Advanced LIGO Pathfinder GariLynn Billingsley Document Migration
08 Oct 2007
G070193-x0 Core Optics Components (COC) - polishing pathfinder kickoff presentation at QED GariLynn Billingsley Document Migration
02 Oct 2007
T070174-x0 LASTI Test Mass characterization and test plan GariLynn Billingsley Document Migration
10 Aug 2007
E070094-x0 Document Change Noitce (DCN) - ELI Septum Window GariLynn Billingsley Document Migration
22 May 2007
D070153-x0 Fused Silica Blank, low absorption Input Test Mass GariLynn Billingsley Document Migration
16 May 2007
E070143-x0 Document Change Notice (DCN) - Fused Silica Blank, low absorption Input Test Mass GariLynn Billingsley Document Migration
16 May 2007
E070142-x0 SPECIFICATION - Fused Silica Blank, low absorption Input Test Mass GariLynn Billingsley Document Migration
16 May 2007
D060513-x0 Fused silica substrate, Advanced LIGO Pathfinder GariLynn Billingsley Document Migration
22 Mar 2007
E070067-x0 Document Change Notice (DCN) - Advanced LIGO Pathfinder drawing revision GariLynn Billingsley Document Migration
22 Mar 2007
D060527-x0 Fused silica Blank, LASTI Compensation Plate GariLynn Billingsley Document Migration
22 Dec 2006
E060275-x0 Document Change Notice (DCN) - LASTI Compensation Plate GariLynn Billingsley Document Migration
22 Dec 2006
E060274-x0 SPECIFICATION - Polish LASTI Compensation Plate GariLynn Billingsley Document Migration
21 Dec 2006
E060273-x0 SPECIFICATION - Fused silica Blank, LASTI Compenation Plate GariLynn Billingsley Document Migration
21 Dec 2006
E060269-x0 Document Change Notice (DCN) - Advanced LIGO Pathfinder GariLynn Billingsley Document Migration
01 Dec 2006
E050190-x0 SPECIFICATION - Final Polish, LASTI End Test Mass (ETM) GariLynn Billingsley Document Migration
24 Aug 2006
E060179-x0 Document Change Notice (DCN) - Initial releases for Final Polish, LASTI ETM/Shape and Polish LASTI ETM Blank Specs GariLynn Billingsley Document Migration
07 Jul 2006
E050191-x0 SPECIFICATION - Shape and Polish LASTI ETM Blank GariLynn Billingsley Document Migration
07 Jul 2006
G060040-x0 4ITM07 Postmortem - LSC Meeting, March 19-22, 2006, Hanford WA Helena Armandula et al. Document Migration
14 Apr 2006
E060001-x0 Document Change Notice (DCN) - Initial Release of COC, Quad ETM, Silica Test Mass GariLynn Billingsley Document Migration
11 Jan 2006
E050319-x0 Document Change Notice (DCN) - Initial Release for Fused Silica Annealing Samples GariLynn Billingsley Document Migration
15 Dec 2005
E050318-x0 SPECIFICATION: Annealing Samples - Fused Silica GariLynn Billingsley Document Migration
14 Dec 2005
D050423-x0 Fused Silica Annealing Sample GariLynn Billingsley Document Migration
14 Dec 2005
T050178-x0 Further Investigation of Hanford ITM Absorption GariLynn Billingsley Document Migration
20 Sep 2005
E050223-x0 Document Change Notice (DCN) - Fused Silica Blank, Input Test Mass (correction of D010115 - incorrect drawing number) GariLynn Billingsley Document Migration
13 Sep 2005
E050071-x0 SPECIFICATION - Fused Silica Input Test Mass for Advanced LIGO GariLynn Billingsley Document Migration
13 Sep 2005
D050337-x0 Fused Silica Blank, Input Test Mass GariLynn Billingsley Document Migration
13 Sep 2005
E050203-x0 Document Change Notice (DCN) - Fused Silica Blank, Input Test Mass GariLynn Billingsley Document Migration
10 Aug 2005
E050072-x0 Document Change Notice (DCN) - Fused Silica Blank, Input Test Mass for Advanced LIGO GariLynn Billingsley Document Migration
20 Jun 2005
E030310-x0 Document Change Notice (DCN) - for Fused Silica Blank, LASTI Test Mass GariLynn Billingsley Document Migration
01 Jun 2005
D030265-x0 Fused Silica Blank, LASTI Test Mass GariLynn Billingsley Document Migration
05 Jan 2005
E040506-x0 Document Change Notice (DCN) - FUSED SILICA PIN GariLynn Billingsley Document Migration
14 Dec 2004
D040558-x0 FUSED SILICA PIN GariLynn Billingsley Document Migration
14 Dec 2004
E010032-x0 Document Change Notice (DCN) - 40 meter Substrate, Mode Cleaner Curved Mirror GariLynn Billingsley Document Migration
09 Nov 2004
T030299-x0 Scatter from 2ITM01 viewed with a Dark Field Microscope Helena Armandula et al. Document Migration
12 Oct 2004
T000128-x0 COC Subsystem Development Plan GariLynn Billingsley Document Migration
11 Aug 2004
T020103-x0 Test Mass Material Down-select Plan GariLynn Billingsley et al. Document Migration
11 Aug 2004
T000098-x0 Core Optics Components Conceptual Design Document Helena Armandula et al. Document Migration
11 Aug 2004
G040160-x0 Lowering Mechanical Loss in Fused Silica Optics with Annealing - LSC Meeting, March 15 - 18th, Livingston, LA Alexander Ageev et al. Document Migration
19 Mar 2004
G040003-x0 Core Optics Components - Design Requirements Review Helena Armandula et al. Document Migration
06 Jan 2004
T010087-x0 Lyon Metrology images GariLynn Billingsley Document Migration
05 Nov 2003
E030245-x0 SPECIFICATION - 70 x 60 mm, 15mmCC sapphire Q substrate GariLynn Billingsley Document Migration
07 Oct 2003
E030243-x0 SPECIFICATION - 70 x 60 mm sapphire Q substrate GariLynn Billingsley Document Migration
07 Oct 2003
D030403-x0 70 x 60 mm Sapphire Q Substrate GariLynn Billingsley Document Migration
07 Oct 2003
D030385-x0 15mm CC sapphire Q substrate GariLynn Billingsley Document Migration
07 Oct 2003
E030246-x0 Document Change Notice (DCN) for 70 x 60 mm, 15mm CC sapphire Q substrate GariLynn Billingsley Document Migration
07 Oct 2003
T030177-x0 Homogeneity of Sapphire a vs. m axis GariLynn Billingsley Document Migration
22 Sep 2003
G030509-x0 Fused Silica Research for Advanced LIGO - LSC Meeting, August 18th - 21st, Hannover, Germany Alexander Ageev et al. Document Migration
15 Sep 2003
E030312-x0 SPECIFICATION - RTS scanner modification GariLynn Billingsley Document Migration
04 Aug 2003
E030394-x0 Document Change Notice (DCN) for RTS Scanner modification GariLynn Billingsley Document Migration
30 Jul 2003
T010047-x0 Minutes of Core Optics Subgroup telecon, 3-8-01 Alex Alexandrovski et al. Document Migration
27 May 2003
T990136-x0 BS03-B (Repolished, Recoated) GariLynn Billingsley Document Migration
23 May 2003
E020252-x0 Document Change Notice (DCN) - Initial Release of D020041-A and E020251-A GariLynn Billingsley Document Migration
23 May 2003
T990137-x0 BS04-B (Repolished, Recoated) GariLynn Billingsley Document Migration
23 May 2003
E030008-x0 Document Change Notice (DCN) - Initial Release of E030007-A-D and D030005-A-D GariLynn Billingsley Document Migration
12 May 2003
D030005-x0 BLANK, LASTI RECYCLING GariLynn Billingsley Document Migration
12 May 2003
E030007-x0 SPECIFICATION - Recycling Mirror Blank, LASTI Experiment GariLynn Billingsley Document Migration
12 May 2003
E030113-x0 Document Change Notice (DCN) - Substrate, Input Test Mass, 40M RSE Experiment (E030112-A & D030136-A)) GariLynn Billingsley Document Migration
24 Apr 2003
E030105-x0 Document Change Notice (DCN) - Substrate, Homogeneity Experiment (D030128-A) GariLynn Billingsley Document Migration
24 Apr 2003
G030074-x0 Advanced LIGO Test Mass Material selection status - LSC Meeting, March 17th - 20th, Livingston, LA GariLynn Billingsley Document Migration
19 Mar 2003
D030136-x0 Substrate, 125 x 50 mm, Q Experiment GariLynn Billingsley Document Migration
10 Mar 2003
E030112-x0 SPECIFICATION - Substrate, 125 x 50 mm, Q Experiment GariLynn Billingsley Document Migration
10 Mar 2003
D030128-x0 Substrate, Homogeneity Test GariLynn Billingsley Document Migration
28 Feb 2003
E030011-x0 Document Change Notice (DCN) - Change in Gin Gin ITM Coating Spec GariLynn Billingsley Document Migration
24 Feb 2003
E021064-x0 SPECIFICATION - Coating, End Test Mass, Gin Gin Experiment GariLynn Billingsley Document Migration
30 Jan 2003
E021063-x0 SPECIFICATION - Coating, Input Test Mass, Gin Gin Experiment GariLynn Billingsley Document Migration
30 Jan 2003
E021065-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
08 Jan 2003
E020804-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
25 Sep 2002
D020424-x0 Substrate, End Test Mass, Gingin Experiment GariLynn Billingsley Document Migration
23 Sep 2002
D020423-x0 Substrate, Input Test Mass, Gingin Experiment GariLynn Billingsley Document Migration
23 Sep 2002
E020800-x0 SPECIFICATION - Substrate, Input Test Mass, Gin Gin Experiment GariLynn Billingsley Document Migration
18 Sep 2002
E020801-x0 SPECIFICATION - Substrate, End Test Mass, Gin Gin Experiment GariLynn Billingsley Document Migration
18 Sep 2002
D020150-x0 Substrate, LASTI Test Mass GariLynn Billingsley Document Migration
26 Jun 2002
D020344-x0 Polished Blank, Downselect GariLynn Billingsley Document Migration
26 Jun 2002
E020389-x0 SPECIFICATION - Sapphire Substrate, LASTI Test Mass, R&D GariLynn Billingsley Document Migration
26 Jun 2002
E020615-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
31 May 2002
E010127-x0 SPECIFICATION - Homogeneity Compensation for the LIGO Pathfinder II Large Sapphire Substrate GariLynn Billingsley Document Migration
30 May 2002
T020054-x0 Segmented Mirror Measurements (e-mail agreement to support CELT metrology) GariLynn Billingsley Document Migration
08 Apr 2002
E020251-x0 SPECIFICATION - Sapphire Substrate, Coating Effect on Mechanical Q, R&D GariLynn Billingsley Document Migration
12 Mar 2002
D020041-x0 Mechanical Q R&D Substrate GariLynn Billingsley Document Migration
27 Feb 2002
E020223-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
04 Feb 2002
E010201-x0 Specification - Coating, Mode Cleaner Curved Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
04 Feb 2002
E010200-x0 Specification - Coating, Mode Cleaner Flat Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
04 Feb 2002
T010115-x0 Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer Benjamin Abbott et al. Document Migration
26 Nov 2001
E010192-x0 Specification: Coating, Power Recycling Mirror, Type A, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010197-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
12 Nov 2001
E010193-x0 Specification: Coating, Signal Recycling Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010199-x0 Specification: Coating, Power Recycling Mirror, Type C, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010196-x0 Specification: Coating, End Test Mass, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010195-x0 Specification: Coating, Input Test Mass, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010198-x0 Specification: Coating, Power Recycling Mirror, Type B, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010194-x0 Specification: Coating, Beam Splitter, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Nov 2001
E010202-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
05 Nov 2001
E960100-x0 COMPONENT SPECIFICATION - Substrate, Beam Splitter GariLynn Billingsley Document Migration
05 Nov 2001
T010116-x0 Minutes of the Core Optics Subgroup, 10/11/01 GariLynn Billingsley Document Migration
29 Oct 2001
E010102-x0 Specification - Substrate, Input Test Mass, 40M RSE Experiment GariLynn Billingsley Document Migration
25 Sep 2001
E010174-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
25 Sep 2001
E010099-x0 Specification - Substrate, Power Recycling Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
25 Sep 2001
E010100-x0 Specification - Substrate, Signal Recycling Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
25 Sep 2001
E010101-x0 Specification - Substrate, Beam Splitter 40M RSE Experiment GariLynn Billingsley Document Migration
25 Sep 2001
D010103-x0 Substrate, Beam Splitter, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Sep 2001
D010102-x0 Substrate, Signal Recycling Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Sep 2001
E010103-x0 Specification - Substrate, End Test Mass, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Sep 2001
D010104-x0 Substrate, Input Test Mass, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Sep 2001
D010101-x0 Substrate, Power Recycling Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Sep 2001
E010104-x0 Document Change Notice - DCN GariLynn Billingsley Document Migration
12 Sep 2001
D010105-x0 Substrate, End Test Mass, 40M RSE Experiment GariLynn Billingsley Document Migration
12 Sep 2001
D010117-x0 Surface 2 Polish, LIGO Pathfinder II Large Sapphire Substrate GariLynn Billingsley Document Migration
08 Aug 2001
T010082-x0 Minutes of COC Telecon - July 12, 2001 GariLynn Billingsley Document Migration
17 Jul 2001
E010089-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
16 May 2001
E010033-x0 Specification - Substrate, Mode Cleaner Flat Mirror, 40M RSE Experiement GariLynn Billingsley Document Migration
07 May 2001
E000517-x0 Specification - Substrate, Mode Cleaner Curved Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
07 May 2001
T010054-x0 Minutes of the Core Optics Subgroup, 4/12/01 GariLynn Billingsley Document Migration
27 Apr 2001
T000129-x0 Specification - Interferometer Measurement Procedure GariLynn Billingsley Document Migration
20 Apr 2001
D010054-x0 Substrate, Mode Cleaner Flat Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
20 Apr 2001
D000464-x0 Substrate, Mode Cleaner Curved Mirror, 40M RSE Experiment GariLynn Billingsley Document Migration
20 Apr 2001
G010179-x0 Core Optics GariLynn Billingsley Document Migration
11 Apr 2001
G010060-x0 Metrology of LIGO Optics Using Fizeau Interferometry GariLynn Billingsley Document Migration
12 Mar 2001
T010021-x0 Minutes of the Core Optics Subgroup, 01-11-01 GariLynn Billingsley Document Migration
28 Feb 2001
T010022-x0 Minutes of the Core Optics Subgroup, 02-15-01 Helena Armandula et al. Document Migration
28 Feb 2001
T010020-x0 Core Optics Telecon, December 14, 2000 Helena Armandula et al. Document Migration
28 Feb 2001
T010005-x0 Sapphire Homogeneity Phase Maps GariLynn Billingsley Document Migration
21 Feb 2001
E010019-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
20 Feb 2001
E010012-x0 Component Specification - LIGO II Pathfinder, Large Sapphire Polishing Specification GariLynn Billingsley Document Migration
20 Feb 2001
D010032-x0 LIGO II Large Pathfinder Substrate GariLynn Billingsley Document Migration
20 Feb 2001
E010039-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
20 Feb 2001
G010011-x0 The Core Optics GariLynn Billingsley Document Migration
02 Feb 2001
D000312-x0 Document Change Notice (DCN) GariLynn Billingsley Document Migration
24 Jan 2001
E000041-x0 Component Specification: LIGO II Pathfinder Sapphire Polishing Specification, Rev. A GariLynn Billingsley Document Migration
16 Jan 2001
T000140-x0 Specification for Advanced LIGO COC GariLynn Billingsley Document Migration
12 Jan 2001
E000409-x0 COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, RECYCLING MIRROR, 40M GariLynn Billingsley Document Migration
10 Jan 2001
E000410-x0 COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, END TEST MASS, 40M GariLynn Billingsley Document Migration
10 Jan 2001
E000408-x0 COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, INPUT TEST MASS, 40M GariLynn Billingsley Document Migration
10 Jan 2001
E000413-x0 COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, BEAM SPLITTER, 40M GariLynn Billingsley Document Migration
10 Jan 2001
D000268-x0 Recycling Mirror Blank, 40 Meter GariLynn Billingsley Document Migration
02 Jan 2001
D000266-x0 Input Test Mass Blank, 40 Meter GariLynn Billingsley Document Migration
02 Jan 2001
D000265-x0 Beam Splitter Blank, 40 Meter GariLynn Billingsley Document Migration
02 Jan 2001
D000267-x0 End Test Mass Blank, 40 Meter GariLynn Billingsley Document Migration
02 Jan 2001
T990135-x0 BS02-B, Repolished and Recoated GariLynn Billingsley Document Migration
02 Aug 2000
T990165-x0 RM07 GariLynn Billingsley Document Migration
02 Aug 2000
T990156-x0 4ITM06-C GariLynn Billingsley Document Migration
02 Aug 2000
T990162-x0 RM04 GariLynn Billingsley Document Migration
02 Aug 2000
T990176-x0 SPETM06 GariLynn Billingsley Document Migration
02 Aug 2000
T990151-x0 4ITM01-C GariLynn Billingsley Document Migration
02 Aug 2000
T990140-x0 ETM01 GariLynn Billingsley Document Migration
02 Aug 2000
T990170-x0 RM12 GariLynn Billingsley Document Migration
02 Aug 2000
T990147-x0 2ITM01-C GariLynn Billingsley Document Migration
02 Aug 2000
T990143-x0 ETM04 GariLynn Billingsley Document Migration
02 Aug 2000
T990160-x0 RM02 GariLynn Billingsley Document Migration
02 Aug 2000
T990166-x0 RM08 GariLynn Billingsley Document Migration
02 Aug 2000
T990172-x0 SPETM01 GariLynn Billingsley Document Migration
02 Aug 2000
T990144-x0 FM02 GariLynn Billingsley Document Migration
02 Aug 2000
T990142-x0 ETM03 GariLynn Billingsley Document Migration
02 Aug 2000
T990149-x0 2ITM03-C GariLynn Billingsley Document Migration
02 Aug 2000
T990175-x0 SPETM04 GariLynn Billingsley Document Migration
02 Aug 2000
T990155-x0 4ITM05-C GariLynn Billingsley Document Migration
02 Aug 2000
T990148-x0 2ITM02-C GariLynn Billingsley Document Migration
02 Aug 2000
T990161-x0 RM03 GariLynn Billingsley Document Migration
02 Aug 2000
T990146-x0 FM04 GariLynn Billingsley Document Migration
02 Aug 2000
T990134-x0 BS01-B GariLynn Billingsley Document Migration
02 Aug 2000
T990152-x0 4ITM02-C GariLynn Billingsley Document Migration
02 Aug 2000
T990157-x0 4ITM07-C GariLynn Billingsley Document Migration
02 Aug 2000
T990163-x0 RM05 GariLynn Billingsley Document Migration
02 Aug 2000
T990177-x0 SPETM06 GariLynn Billingsley Document Migration
02 Aug 2000
T990168-x0 RM10 GariLynn Billingsley Document Migration
02 Aug 2000
T990138-x0 BS05-B GariLynn Billingsley Document Migration
02 Aug 2000
T990139-x0 BS06-B GariLynn Billingsley Document Migration
02 Aug 2000
T990169-x0 RM11 GariLynn Billingsley Document Migration
02 Aug 2000
T990179-x0 SPETM08 GariLynn Billingsley Document Migration
02 Aug 2000
T990159-x0 RM01 GariLynn Billingsley Document Migration
02 Aug 2000
T990158-x0 42ITM08-C GariLynn Billingsley Document Migration
02 Aug 2000
T990145-x0 FM03 GariLynn Billingsley Document Migration
02 Aug 2000
T990178-x0 SPETM07 GariLynn Billingsley Document Migration
02 Aug 2000
T990173-x0 SPETM02 GariLynn Billingsley Document Migration
02 Aug 2000
T990150-x0 2ITM04-C GariLynn Billingsley Document Migration
02 Aug 2000
T990167-x0 RM09 GariLynn Billingsley Document Migration
02 Aug 2000
T990153-x0 4ITM03-C GariLynn Billingsley Document Migration
02 Aug 2000
T990171-x0 RM13 GariLynn Billingsley Document Migration
02 Aug 2000
T990154-x0 4ITM04-C GariLynn Billingsley Document Migration
02 Aug 2000
T990174-x0 SPETM03 GariLynn Billingsley Document Migration
02 Aug 2000
T990141-x0 ETM02 GariLynn Billingsley Document Migration
02 Aug 2000
T990133-x0 FM01 GariLynn Billingsley Document Migration
26 Jul 2000
G980063-x0 International Collaboration Optical Test and Development, PAC4 - 23 April 1998 GariLynn Billingsley Document Migration
29 Mar 2000
D960791-x0 End Test Mass Substrate Craig Conley et al. Document Migration
01 Mar 2000
G990091-x0 Gravitational Wave Interferometry: How Does It Work? - Presented at Interferometry `99 Warsaw, Poland 9-20-99 GariLynn Billingsley Document Migration
17 Sep 1999
T990057-x0 Caltech Measurements of Coated Optics Phase Maps: Sept16 ATP TEST VOL I GariLynn Billingsley Document Migration
14 Sep 1999
T990051-x0 Caltech Measurements of Coated Optics Phase Maps: ATP 9/23, 9/21, MTF DATA Zemax files GariLynn Billingsley Document Migration
14 Sep 1999
T990063-x0 Caltech Measurements of Coated Optics Phase Maps: Backup-matlab-Vision32-SHAO_M_DEVSTUDIO 12/9/98 GariLynn Billingsley Document Migration
14 Sep 1999
T990064-x0 Caltech Measurements of Coated Optics Phase Maps: 3 FLAT 08_09_98 GariLynn Billingsley Document Migration
14 Sep 1999
T990056-x0 Caltech Measurements of Coated Optics Phase Maps: C.B. One Shot Oct 18th GariLynn Billingsley Document Migration
14 Sep 1999
T990053-x0 Caltech Measurements of Coated Optics Phase Maps: Random C-FM2 points 1-16 & center, mid, edge VOLUME I GariLynn Billingsley Document Migration
14 Sep 1999
T990061-x0 Caltech Measurements of Coated Optics Phase Maps: C-A Oct 15 -Good Combo 3flat GariLynn Billingsley Document Migration
14 Sep 1999
T990049-x0 Caltech Measurements of Coated Optics Phase Maps: CSIRO IRx Data, Data Oct20/BIA GariLynn Billingsley Document Migration
14 Sep 1999
T990050-x0 Caltech Measurements of Coated Optics Phase Maps: Mac 1 8/17/98 OLD ATPS GariLynn Billingsley Document Migration
14 Sep 1999
T990058-x0 Caltech Measurements of Coated Optics Phase Maps: 3 Flat data Oct 7/16 (-10-15) GariLynn Billingsley Document Migration
14 Sep 1999
T990062-x0 Caltech Measurements of Coated Optics Phase Maps: RMO3 Dec 15 1998 GariLynn Billingsley Document Migration
14 Sep 1999
T990055-x0 Caltech Measurements of Coated Optics Phase Maps: Random C-FM2 Volume II GariLynn Billingsley Document Migration
14 Sep 1999
T990052-x0 Caltech Measurements of Coated Optics Phase Maps: RM01 12/99 VI GariLynn Billingsley Document Migration
14 Sep 1999
T990054-x0 Caltech Measurements of Coated Optics Phase Maps: Vision 32.01C old/Oct20 BIA GariLynn Billingsley Document Migration
14 Sep 1999
T990059-x0 Caltech Measurements of Coated Optics Phase Maps: Sept. 16 ATP VOL II GariLynn Billingsley Document Migration
14 Sep 1999
T990060-x0 Caltech Measurements of Coated Optics Phase Maps: Sept 25 DRFT ATP -Drift Test GariLynn Billingsley Document Migration
14 Sep 1999
T990019-x0 Characterization of the Cosmic Ray Shack as a Potential Site for the IR Metrology Lab GariLynn Billingsley Document Migration
25 Feb 1999
D980441-x0 1) 2ITM02 #1, Surface Oblique Display, 2) 2ITM02 #2, Surface Oblique Display GariLynn Billingsley Document Migration
29 Oct 1998
E980061-x0 Core Optics Components (COC) Final Design Document Helena Armandula et al. Document Migration
27 Apr 1998
E980058-x0 Flat, Transmission, 150 mm, Coated, Rev A GariLynn Billingsley Document Migration
13 Apr 1998
E980019-x0 Component Specification: Substrate, Suprasil 312 GariLynn Billingsley Document Migration
01 Apr 1998
E980020-x0 Component Specification: Reference Flats, Uncoated GariLynn Billingsley Document Migration
23 Mar 1998
G970286-x0 Optical Development of Test Masses - Presentation in Adelaide, Australia GariLynn Billingsley Document Migration
23 Mar 1998
E980059-x0 Component Specification: Reference Flat, AR Coated GariLynn Billingsley Document Migration
23 Mar 1998
T960167-x0 Comparative Results from Pathfinder Polishing GariLynn Billingsley Document Migration
10 Feb 1998
E960093-x0 Component Specification - Substrate, Input Test Mass, Rev. C GariLynn Billingsley Document Migration
28 Jan 1998
E980005-x0 Document Change Notice GariLynn Billingsley Document Migration
28 Jan 1998
E960094-x0 Component Specification - Mirror Blank Material, Beam Splitter, Rev. B GariLynn Billingsley Document Migration
04 Dec 1997
E960092-x0 Component Specification: Substrate, Recycling Mirror GariLynn Billingsley Document Migration
11 Aug 1997
E960096-x0 Component Specification: Mirror Blank Material, Recycling Mirror GariLynn Billingsley Document Migration
05 Aug 1997
D960793-x0 Beam Splitter Blank GariLynn Billingsley et al. Document Migration
20 Feb 1997
D960794-x0 Core Optic Blank GariLynn Billingsley et al. Document Migration
20 Feb 1997
E960101-x0 Component Specification - Substrate, Folding Mirror GariLynn Billingsley Document Migration
27 Sep 1996
E960102-x0 Component Specification - Substrate, End Test Mass GariLynn Billingsley Document Migration
27 Sep 1996
E960097-x0 Component Specification - Mirror Blank Material, Folding Mirror, End Test Mass GariLynn Billingsley Document Migration
13 Sep 1996
E960095-x0 Component Specification - Mirror Blank Material, Input Test Mass GariLynn Billingsley Document Migration
13 Sep 1996

Number of documents found: 669