LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1500163-v3 |
Annular End Reaction Mass (AERM) |
Eduardo Sanchez et al. |
System Engineering
Basic R&D
|
18 Sep 2015 |
T2400385-v1 |
TMT test report draft - email |
GariLynn Billingsley |
Reports
|
14 Nov 2024 |
E2300026-v1 |
Surface Profiles of 100mm AlGaAs-coated Samples (SN: 1800006-03 and 1800006-04) |
Camille Makarem et al. |
Basic R&D
|
22 Oct 2024 |
G2201608-v1 |
Surface Analysis of AlGaAs Coating on 100mm Sample |
Camille Makarem et al. |
Basic R&D
|
22 Oct 2024 |
G1100283-v1 |
Effect of Heat Treatment on the Optical Absorption of Dielectric Coatings: effect of temperature and Oxygen pressure |
Ashot Markosyan et al. |
Core Optics
|
02 Oct 2024 |
E1000863-v1 |
QA Test Procedure for aLIGO COC Reflection Transmission Scatter and Absorption |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
16 Sep 2024 |
E1400259-x0 |
aLIGO COC Design |
GariLynn Billingsley |
Core Optics
Final Design
|
04 Jun 2024 |
E1500377-v1 |
ETM10 Figure Measurement |
GariLynn Billingsley |
Core Optics
Quality Assurance
|
17 Apr 2024 |
E080031-v1 |
MIRROR BLANK MATERIAL, AdLIGO ITM MIRROR |
GariLynn Billingsley et al. |
Fabrication
Core Optics
Final Design
|
11 Mar 2024 |
E080047-v1 |
Mirror Blank Material, AdLIGO ETM Mirror Specification |
GariLynn Billingsley et al. |
Fabrication
Core Optics
Final Design
|
11 Mar 2024 |
E1000798-v2 |
CP03 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
04 Mar 2024 |
C1501364-v2 |
RFQ for fabrication of Annular End Reaction Mass substrate |
GariLynn Billingsley |
Fabrication
Suspensions
Core Optics
Procurements
|
08 Aug 2023 |
C1501363-v3 |
Statement of work SOW for fabrication of Annular End Reaction Mass substrate |
GariLynn Billingsley |
Suspensions
Core Optics
Procurements
Fabrication
|
02 Aug 2023 |
E1100881-v1 |
ETM12 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
31 Jul 2023 |
T2000643-v1 |
Characterizing the figure change after coating of PEN-ITM02 at LMA |
GariLynn Billingsley et al. |
Core Optics
Fabrication
|
20 Jul 2023 |
T1300653-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for SR2-04 |
Rodica Martin et al. |
Input Optics
Core Optics
|
11 Jul 2023 |
T1300741-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for SRM-08 |
Rodica Martin et al. |
Subsystem Test
Core Optics
Input Optics
|
11 Jul 2023 |
T1300747-x0 |
Measurement Uncertainties in Determining the Radius of Curvature for IMCC-02 |
Rodica Martin et al. |
Input Optics
Core Optics
Subsystem Test
|
11 Jul 2023 |
T1300746-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for SR2-03 |
Rodica Martin et al. |
Subsystem Test
Input Optics
Core Optics
|
11 Jul 2023 |
T1300745-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for SRM-05 |
Rodica Martin et al. |
Subsystem Test
Core Optics
Input Optics
|
11 Jul 2023 |
T1300740-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for PRM-02 |
Rodica Martin et al. |
Subsystem Test
Core Optics
Input Optics
|
11 Jul 2023 |
T1300744-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for PR2-04 |
Rodica Martin et al. |
Subsystem Test
Core Optics
Input Optics
|
11 Jul 2023 |
T1300743-v1 |
Measurement Uncertainties in Determining the Radius of Curvature for PRM-04 |
Rodica Martin et al. |
Core Optics
Input Optics
Subsystem Test
|
11 Jul 2023 |
E1900280-x0 |
FIM02 Characterization |
GariLynn Billingsley |
Core Optics
A+
Subsystem Test
|
07 Jul 2023 |
E1900282-x0 |
FIM04 Characterization |
GariLynn Billingsley |
Core Optics
A+
Subsystem Test
|
07 Jul 2023 |
E1200484-x0 |
aLIGO, COC |
GariLynn Billingsley et al. |
Core Optics
|
06 Jul 2023 |
E1000763-x0 |
aLIGO COC Testing and Commissioning Documentation |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
31 May 2023 |
E2300136-v1 |
DCN Revised Disc Insert (welding puck) |
GariLynn Billingsley et al. |
Fabrication
Suspensions
|
15 May 2023 |
E1201035-v25 |
aLIGO Chamber Entry & Exit Procedures |
Calum Torrie et al. |
System Engineering
Safety
|
27 Mar 2023 |
E1300312-v4 |
ETM08 HR Coating Absorption |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
21 Mar 2023 |
E1300313-v2 |
ETM08 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
03 Mar 2023 |
E1300555-v3 |
ETM12 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
03 Feb 2023 |
E1300311-v3 |
ETM08 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
02 Feb 2023 |
E1000781-v1 |
ETM07 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
31 Jan 2023 |
E1000782-v1 |
ETM08 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
31 Jan 2023 |
E1000784-x0 |
ETM10 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
31 Jan 2023 |
E1000783-x0 |
ETM09 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
31 Jan 2023 |
D2100303-v1 |
A304 - FCES Elevations - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100302-v1 |
A303 - FCES Elevations - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
Observatory Facilities
A+
|
16 Nov 2021 |
D2100298-v1 |
A205 - Filter Cavity End Station - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
Observatory Facilities
A+
|
16 Nov 2021 |
E1300674-v2 |
ITM09 HR AR Absorption |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
13 Jan 2023 |
T1700149-v8 |
ITM characteristic summary |
GariLynn Billingsley |
Core Optics
|
17 Nov 2022 |
G2200853-v2 |
Core Optics and Point Absorber Mitigation |
GariLynn Billingsley et al. |
Reviews
Core Optics
|
03 Nov 2022 |
E1300556-v1 |
ETM12 HR Coating Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
09 Mar 2022 |
E0900394-v6 |
aLIGO optic container shipping and storage procedure |
GariLynn Billingsley et al. |
Core Optics
|
20 Sep 2022 |
M2100169-v2 |
Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 |
Sheila Rowan et al. |
Basic R&D
Core Optics
Technical Review Board
A+
Memorandum
Upgrades
|
04 Aug 2022 |
E1300557-v1 |
ETM12 Transmission |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
09 Mar 2022 |
E1000793-x0 |
FM01 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
20 Jul 2022 |
E1300314-v1 |
ETM08 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
16 Oct 2015 |
E1300558-v1 |
ETM12 AR Reflection |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
09 Mar 2022 |
C2100241-v1 |
SOW A+ Coating Development and Test Mass Production |
GariLynn Billingsley |
Core Optics
A+
|
25 May 2022 |
E1500139-v3 |
ETM11 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
24 May 2022 |
E1500142-v2 |
ETM14 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
24 May 2022 |
T2100216-v1 |
Aluminum Ablation Evaluation May 2021 SN1535 |
GariLynn Billingsley et al. |
Operations
Core Optics
|
24 May 2022 |
T2000526-v1 |
Damage test Ink and First Contact |
GariLynn Billingsley et al. |
Cleaning
Core Optics
|
24 May 2022 |
E1000768-x0 |
ITM05 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000774-v1 |
ITM11 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
10 Nov 2021 |
E1500125-x0 |
ETM12 ETM AR coating waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
09 Mar 2022 |
E1500105-x0 |
ETM12 Polish waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
09 Mar 2022 |
E1500104-x0 |
ETM12 Coating, 532 nm reflection waiver. |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
09 Mar 2022 |
E1500097-x0 |
ETM12 Coating, spherical aberration waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
09 Mar 2022 |
E1500078-x0 |
ETM12 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
09 Mar 2022 |
E2100395-v1 |
Witness sample SN1009-LMA005 80 mm, ETM HR stack, Aluminum foil on mount, nearby panels and shutter |
GariLynn Billingsley et al. |
Subsystem Test
Core Optics
|
10 Feb 2022 |
G2200124-v1 |
Core Optics Test Mass Coating Update |
GariLynn Billingsley |
Core Optics
|
03 Feb 2022 |
E1900150-v1 |
MIRROR BLANK SPECIFICATION, A+ BEAMSPLITTER |
GariLynn Billingsley |
A+
Core Optics
|
03 Feb 2022 |
E1800345-x0 |
A+, ISC |
GariLynn Billingsley |
A+
|
13 Jan 2022 |
T1600486-x0 |
The Coating RIng-down MEasurement system (CRiMe) Document Tree |
Eric Gustafson et al. |
Basic R&D
|
03 Jan 2022 |
P960044-x0 |
Optics Development for LIGO |
GariLynn Billingsley et al. |
Document Migration
|
30 Dec 2021 |
T2100517-v1 |
CSIRO aLIGO Beamsplitter Coating Design - compendium |
GariLynn Billingsley |
Core Optics
|
08 Dec 2021 |
D1900148-v1 |
MIRROR SUBSTRATE DRAWING, A+ FILTER CAVITY INPUT MIRROR (FC1) |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
03 Dec 2021 |
E2000079-v2 |
Description of Advanced LIGO era coating witness samples |
GariLynn Billingsley et al. |
Subsystem Test
Core Optics
|
03 Dec 2021 |
D2100346-v1 |
S103 - FC Tube Enclosure B Foundation and Slab Plan - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100301-v1 |
A302 - FCTE Overall Elevations - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
Observatory Facilities
A+
|
16 Nov 2021 |
D2100294-v1 |
A200 - Overall Plan - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100345-v1 |
S102 - Filter Cavity End Station FCES Foundation and Slab Plan - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
E1500091-x0 |
ITM11 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
10 Nov 2021 |
E1500113-x0 |
ITM11 Polish waiver, sleek |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
10 Nov 2021 |
E1500128-x0 |
ITM11 AR coating waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
10 Nov 2021 |
E1400037-v1 |
ITM11 Figure Measurement Report |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
10 Nov 2021 |
E1400041-v1 |
ITM11 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
10 Nov 2021 |
E1400042-v1 |
ITM11 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
10 Nov 2021 |
E1400043-v1 |
ITM11 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
10 Nov 2021 |
G1900693-v1 |
HWS absorption map and Transmission map Comparison O3 Test masses |
GariLynn Billingsley et al. |
Core Optics
|
10 Nov 2021 |
E1400060-v2 |
ITM03 and ITM11 coating defect analysis |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
10 Nov 2021 |
E1500085-x0 |
ITM05 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
07 Nov 2021 |
E1500111-x0 |
ITM05 Polish waiver, excess defects |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
07 Nov 2021 |
E1700247-v1 |
ITM05 Figure Measurement Report |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
07 Nov 2021 |
E1700270-v1 |
ITM05 HR AR Absorption |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
07 Nov 2021 |
E1700191-v1 |
ITM05 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
07 Nov 2021 |
E1700231-v1 |
ITM05 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
07 Nov 2021 |
E1700266-v1 |
ITM05 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
07 Nov 2021 |
T1100624-x0 |
Dark Field microscope inspection at Caltech ITM05 |
GariLynn Billingsley |
Core Optics
|
07 Nov 2021 |
D1900150-v2 |
MIRROR BLANK DRAWING, A+ BEAMSPLITTER |
GariLynn Billingsley |
A+
Core Optics
|
07 Oct 2021 |
D1900151-v2 |
A+, COC, BBS SUBSTRATE |
GariLynn Billingsley |
A+
Core Optics
|
07 Oct 2021 |
E2000107-v1 |
Witness sample, SN0932-21 LMA Coating Run C11068 |
GariLynn Billingsley et al. |
Subsystem Test
Core Optics
|
07 Sep 2021 |
M1800264-v1 |
A+ Project Execution Plan |
Hannah Hansen et al. |
A+
|
13 Aug 2021 |
E1300017-v8 |
First Contact Spray Application & Removal Procedure |
Calum Torrie et al. |
System Engineering
|
12 Aug 2021 |
T990164-v1 |
RM06 |
GariLynn Billingsley |
Document Migration
|
20 Jul 2021 |
E080511-v6 |
ITM Polish Specification |
Mick Flanigan |
Core Optics
Final Design
|
14 Jul 2021 |
E1300431-v1 |
ETM09 Figure Measurement |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
17 Jan 2017 |
E2000633-x0 |
DCN for update of End Test Mass specifications - change radius of curvature requirement |
GariLynn Billingsley |
Procurements
A+
Operations
Core Optics
|
23 Dec 2020 |
E0900095-v1 |
DCN for Advanced LIGO Polishing Revision ITM and ETM |
GariLynn Billingsley |
Core Optics
Final Design
|
23 Dec 2020 |
G2001920-v3 |
Custom polish figure for O4 ETMs |
GariLynn Billingsley et al. |
Core Optics
|
04 Dec 2020 |
E1000799-v2 |
CP04 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
09 Oct 2020 |
T1300642-v1 |
Sapphire Prism bond test: Results |
GariLynn Billingsley et al. |
System Engineering
Suspensions
Activity
|
23 Sep 2020 |
E1200266-v2 |
Ground Glass Freon Wipe Cleaning Procedure |
Margot Hennig et al. |
Core Optics
Input Optics
Auxiliary Optics
Cleaning
|
20 Feb 2013 |
T1900696-v1 |
Documentation of LLO ETM Inspection during Mid-O3 Vent |
GariLynn Billingsley et al. |
Core Optics
|
10 Aug 2020 |
E1900149-v3 |
MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley |
Auxiliary Optics
A+
|
04 Aug 2020 |
D1900149-v1 |
MIRROR SUBSTRATE DRAWING, A+ FILTER CAVITY END MIRROR (FC2) |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
28 Jul 2020 |
E1000778-x0 |
ETM04 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
29 Jan 2015 |
E1500110-x0 |
ITM03 Polish waiver, excess defects |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
20 Jun 2020 |
E1700080-x0 |
AERM08 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700079-x0 |
AERM07 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700078-x0 |
AERM06 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700077-x0 |
AERM05 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1100938-x0 |
SRM-08 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100937-x0 |
SRM-07 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100936-x0 |
SRM-06 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100935-x0 |
SRM-05 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100934-x0 |
SRM-04 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100933-x0 |
SRM-03 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100932-x0 |
SRM-02 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100931-x0 |
SRM-01 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100930-x0 |
SR2-04 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100929-x0 |
SR2-03 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100928-x0 |
SR2-02 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100927-x0 |
SR2-01 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100926-x0 |
PRM-04 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100925-x0 |
PRM-03 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100924-x0 |
PRM-02 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100923-x0 |
PRM-01 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100922-x0 |
PR2-04 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100921-x0 |
PR203 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100920-x0 |
PR2-02 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100919-x0 |
PR2-01 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100914-x0 |
F-SRM-04 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100913-x0 |
F-SRM-03 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100912-x0 |
F-SRM-02 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100911-x0 |
F-SRM-01 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100910-x0 |
F-SR2-02 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100909-x0 |
F-SR2-01 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100908-x0 |
F-PRM-02 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100907-x0 |
F-PRM-01 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100906-x0 |
F-PR2-02 Characterization |
GariLynn Billingsley |
Subsystem Test
Input Optics
|
16 Jun 2020 |
E1100905-x0 |
F-PR2-01 Characterization |
GariLynn Billingsley |
Input Optics
Subsystem Test
|
16 Jun 2020 |
E1100885-v1 |
ETM16 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1100883-x0 |
ETM14 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1100882-x0 |
ETM13 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1100880-x0 |
ETM11 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1100879-x0 |
FM06 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1100878-x0 |
FM05 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1100877-x0 |
FM04 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000821-x0 |
ERM08 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000820-x0 |
ERM07 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000819-x0 |
ERM06 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000818-x0 |
ERM05 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000817-x0 |
ERM04 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000816-x0 |
ERM03 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000815-x0 |
ERM02 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000814-x0 |
ERM01 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000806-x0 |
F-PR302 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000805-x0 |
F-PR301 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000804-x0 |
CP09 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000803-x0 |
CP08 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000802-x0 |
CP07 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000801-x0 |
CP06 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000800-x0 |
CP05 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000797-x0 |
CP02 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000796-x0 |
CP01 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000795-x0 |
FM03 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000794-x0 |
FM02 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000792-x0 |
BS06 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000791-x0 |
BS05 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000790-x0 |
BS04 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000789-x0 |
BS03 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000788-v1 |
BS02 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000787-x0 |
BS01 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000780-x0 |
ETM06 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000779-x0 |
ETM05 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000777-x0 |
ETM03 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000776-x0 |
ETM02 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000775-x0 |
ETM01 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000772-x0 |
ITM09 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000770-v1 |
ITM07 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000769-x0 |
ITM06 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000767-x0 |
ITM04 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
E1000765-x0 |
ITM08 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
16 Jun 2020 |
E1000764-x0 |
ITM01 Characterization |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
16 Jun 2020 |
T1000456-v1 |
Bulk absorption measurement of the CP01 substrate, Heraeus suprasil 3001 |
Rand Dannenberg et al. |
Core Optics
|
24 Apr 2020 |
E1900199-v2 |
ETM Polishing Specification for re-polish |
GariLynn Billingsley |
Final Design
Core Optics
|
02 Dec 2019 |
E2000135-v1 |
DCN for release of A+ Beamsplitter BBS drawings and specifications |
GariLynn Billingsley |
A+
Core Optics
|
11 Mar 2020 |
E1900151-v1 |
MIRROR SUBSTRATE SPECIFICATION, A+ BEAMSPLITTER |
GariLynn Billingsley |
A+
Core Optics
|
10 Mar 2020 |
G2000337-v2 |
Microscopy of witness sample SN1549 ITM03/11 HR |
GariLynn Billingsley |
Core Optics
|
09 Mar 2020 |
E2000164-v1 |
ETM14 HR Coating Absorber images |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
01 Mar 2020 |
E2000163-v1 |
ETM11 HR Coating Absorber images |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
01 Mar 2020 |
E1500143-v1 |
ETM14 HR Coating Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
01 Mar 2020 |
F0810001-v5 |
Technical Direction Memorandum - Template |
GariLynn Billingsley |
Procurements
|
27 Feb 2020 |
G1902383-v2 |
Absorption Test and microscopy of witness sample SN1549 ITM03/11 HR |
GariLynn Billingsley |
Core Optics
|
24 Feb 2020 |
E1900381-v1 |
FTIR - ETM09 First Contact Residue on S1 HR Surface. |
Stephen Appert et al. |
System Engineering
Core Optics
|
03 Dec 2019 |
C1900313-v1 |
SOW for precision polish, Filter Cavity Input and End Mirrors |
GariLynn Billingsley |
Procurements
A+
Core Optics
|
06 Dec 2019 |
C1900175-v3 |
SOW for precision polish, End Test Masses |
GariLynn Billingsley |
Core Optics
Procurements
|
30 Jul 2019 |
D1900269-v1 |
End Test Mass Substrate re-polish |
Calum Torrie et al. |
Final Design
Core Optics
|
02 Dec 2019 |
E1900148-v2 |
MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley |
Auxiliary Optics
A+
|
21 Oct 2019 |
P1900316-v1 |
Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO |
David Reitze et al. |
Activity
Detector
Basic R&D
|
11 Oct 2019 |
G1901510-v1 |
A+ Beamsplitter material long lead review |
GariLynn Billingsley |
Requirements
Core Optics
A+
|
20 Aug 2019 |
T1800013-v1 |
ITM03 LHO ITMx post O2 inspection |
GariLynn Billingsley et al. |
Core Optics
|
17 Aug 2019 |
E1300330-v1 |
ETM09 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
16 Oct 2015 |
T1900410-v1 |
Desired results of the Cosmic Explorer engineering study |
Rana Adhikari et al. |
Vacuum
Conceptual Design
Observatory Facilities
|
09 Jul 2019 |
E1900147-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
E1900146-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
D1900146-v1 |
MIRROR BLANK DRAWING, A+ FILTER CAVITY, END MIRROR |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
07 Jun 2019 |
D1900147-v1 |
MIRROR BLANK DRAWING, A+ FILTER CAVITY, INPUT MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
E080494-v3 |
Core Optics Components Final Design |
Gregg Harry et al. |
Final Design
Core Optics
|
16 Apr 2019 |
T000127-v4 |
Core Optics Components (COC) Design Requirements Document (DRD) |
Gregg Harry et al. |
Core Optics
Final Design
|
16 Apr 2019 |
G1900666-v1 |
A+ for LIGO |
GariLynn Billingsley |
Meeting
A+
Core Optics
|
06 Apr 2019 |
E1400010-v2 |
ITM03 HR AR Absorption |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
27 Feb 2019 |
G1800345-v1 |
ITM03 LHO ITMx post O2 inspection - LVC Presentation |
GariLynn Billingsley et al. |
Core Optics
|
04 Feb 2019 |
E1000079-v9 |
First Contact Brush and Pour Application Procedure |
Margot Hennig et al. |
System Engineering
Core Optics
|
19 Dec 2018 |
P1600076-v1 |
The Effect of Time on Optical Coating Mechanical Loss and Implications for LIGO-India |
Gregg Harry et al. |
Core Optics
Basic R&D
|
07 Dec 2018 |
E1800238-v1 |
CASI 300 mm focal length mirror substrate |
GariLynn Billingsley et al. |
Core Optics
|
26 Oct 2018 |
E1400363-x0 |
Collection of Documents associated with cleaning optics for advanced LIGO |
Calum Torrie et al. |
System Engineering
Core Optics
|
01 Aug 2018 |
E030309-x0 |
SPECIFICATION - Fused Silica Blank, LASTI Test Mass, R&D |
GariLynn Billingsley |
Document Migration
|
27 Jul 2018 |
E1700272-v1 |
ITM10 HR AR Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
14 Jun 2018 |
E1700268-v1 |
ITM10 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
14 Jun 2018 |
E1700233-v1 |
ITM10 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
14 Jun 2018 |
E1700193-v1 |
ITM10 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
14 Jun 2018 |
E1300673-v2 |
ITM09 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
14 Jun 2018 |
E1300672-v3 |
ITM09 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
14 Jun 2018 |
E1500191-v1 |
ITM09 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
14 Jun 2018 |
T1400562-v1 |
ITM09 Mounting flat fracture |
GariLynn Billingsley |
Core Optics
|
14 Jun 2018 |
G1301053-v1 |
ITM09 AR characterization Summary |
GariLynn Billingsley et al. |
Core Optics
|
14 Jun 2018 |
T1100623-x0 |
Dark Field microscope inspection at Caltech ITM09 |
GariLynn Billingsley |
Core Optics
|
14 Jun 2018 |
E1300655-v1 |
ITM09 Figure Measurement |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
14 Jun 2018 |
E1700192-v1 |
ITM07 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1700232-v1 |
ITM07 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1700271-v1 |
ITM07 HR AR Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1700267-v1 |
ITM07 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1500190-v1 |
ITM06 Transmission |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1500189-v1 |
ITM06 AR Reflection |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1500187-v1 |
ITM06 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1300886-v1 |
ITM06 Figure Measurement |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1200265-v3 |
ITM04 Figure Measurement |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1200702-v1 |
ITM04 Transmission |
Liyuan Zhang et al. |
System Test
Core Optics
|
12 Jun 2018 |
E1200704-v1 |
ITM04 HR AR Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1200703-v1 |
ITM04 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1200701-v1 |
ITM04 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1300943-v2 |
ITM03 Figure Measurement Report |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1400009-v1 |
ITM03 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1400008-v1 |
ITM03 Transmission |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1200623-v2 |
ITM08 Figure measurement |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1500101-x0 |
ITM08 Coating, spherical aberration waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
12 Jun 2018 |
E1200575-v2 |
ITM08 Transmission |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1200577-v2 |
ITM08 HR AR Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1200576-v2 |
ITM08 AR Reflection |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1200574-v2 |
ITM08 Integrated Scatter |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
T1200293-v1 |
ITM08 Barrel damage inspection |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1700230-v1 |
ITM01 Transmission |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1700265-v1 |
ITM01 AR Reflection |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
12 Jun 2018 |
E1700190-v1 |
ITM01 Integrated Scatter |
Liyuan Zhang et al. |
System Test
Core Optics
|
12 Jun 2018 |
E1500188-v1 |
ITM06 HR AR Absorption |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
12 Jun 2018 |
E1500264-v3 |
Annular End Reaction Mass Conceptual/Final Design Document |
GariLynn Billingsley et al. |
Suspensions
Final Design
|
12 Jun 2018 |
E1800164-v1 |
Coating specification - 100 mm Crystalline coating demonstration |
GariLynn Billingsley |
Core Optics
Basic R&D
|
07 Jun 2018 |
E1800006-v3 |
Polish Specification - 100 mm Crystalline coating demonstration substrate |
GariLynn Billingsley |
Core Optics
Basic R&D
|
07 Jun 2018 |
D1800154-v2 |
Drawing - 100 mm Crystalline coating demonstration |
GariLynn Billingsley et al. |
Basic R&D
Core Optics
|
07 Jun 2018 |
E1000278-v7 |
Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) |
Margot Hennig et al. |
Final Design
Suspensions
|
28 Aug 2012 |
G1702201-v2 |
Advanced LIGO coating history |
GariLynn Billingsley et al. |
Core Optics
|
15 Nov 2017 |
E1500376-v1 |
ETM13 Figure Measurement |
GariLynn Billingsley |
Core Optics
Quality Assurance
|
16 Aug 2017 |
E1700163-v1 |
ITM10 figure measurement |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
15 Aug 2017 |
P1700029-v5 |
Characterization of Advanced LIGO Core Optics |
GariLynn Billingsley et al. |
Public Talk / Colloquium
|
20 Jul 2017 |
E1700229-v1 |
ITM07 Figure Measurement |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
10 Jul 2017 |
E1600288-v1 |
Initial Inspection of PMC Bench #10 at CIT Sept 2016 |
GariLynn Billingsley et al. |
System Engineering
Core Optics
|
04 Oct 2016 |
G1700743-v1 |
Characterization of Advanced LIGO Core Optics |
GariLynn Billingsley et al. |
Core Optics
Public Talk / Colloquium
|
21 Apr 2017 |
E1600262-v4 |
aLIGO OMC: Spare OMC production plan |
Koji Arai et al. |
Assembly
Sensing and Control
|
09 Dec 2016 |
T1600499-v2 |
CP04 Gold Coating Inspection of overspray |
GariLynn Billingsley et al. |
Fabrication
Core Optics
|
01 Nov 2016 |
P1600237-v1 |
CQG+ Article for The Effect of Time on Optical Coating Mechanical Loss and Implications for LIGO-India |
Gregg Harry et al. |
Core Optics
Basic R&D
|
27 Jul 2016 |
C1600914-v1 |
SOW SRM Coating 33% |
GariLynn Billingsley |
Core Optics
Procurements
|
25 Jul 2016 |
C1600913-v1 |
RFQ aLIGO SRM coating 33% |
GariLynn Billingsley |
Core Optics
Procurements
|
25 Jul 2016 |
E1600202-v2 |
Coated Substrate, ALIGO Signal Recycling Mirror, T = 33% |
GariLynn Billingsley |
Final Design
Core Optics
|
13 Jul 2016 |
D0900949-v2 |
End Reaction Mass ESD Coating Face Pattern |
Margot Hennig |
Core Optics
Procurements
Final Design
|
06 Jul 2016 |
G030035-v1 |
Core Optics Sapphire Development |
GariLynn Billingsley |
Document Migration
|
05 Apr 2016 |
E1600082-v1 |
RTS Test Bench 2” dia. Gold-coated Elliptical Mirror Specifications |
Liyuan Zhang et al. |
Core Optics
Subsystem Test
|
14 Mar 2016 |
G1600326-v1 |
Inside LIGO - Presented at CSIRO, Lindfield |
GariLynn Billingsley et al. |
Public Talk / Colloquium
|
22 Feb 2016 |
T1400711-v1 |
Prism removal from ITM09 |
GariLynn Billingsley et al. |
Suspensions
Core Optics
|
16 Dec 2015 |
C1501385-v1 |
RFQ Gold coating of custom Compensation Plate (CP) and Annular End Reaction Mass (AERM) |
GariLynn Billingsley |
Procurements
Core Optics
|
02 Dec 2015 |
E080035-v1 |
Specification: Mirror Blank Material, Adv. LIGO Beamsplitter (BS) Mirror |
GariLynn Billingsley et al. |
Core Optics
Final Design
Fabrication
|
06 Nov 2015 |
E1300329-v1 |
ETM09 Transmission |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
16 Oct 2015 |
E1300332-v1 |
ETM09 AR Reflection |
Liyuan Zhang et al. |
Subsystem Test
Core Optics
|
16 Oct 2015 |
E0900113-v3 |
Compensation Plate Electro Static Drive gold coating specification |
GariLynn Billingsley |
Core Optics
Final Design
|
02 Sep 2015 |
E0900112-v3 |
Compensation Plate Barrel gold coating specification |
GariLynn Billingsley |
Final Design
Core Optics
|
02 Sep 2015 |
E0900138-v3 |
End Reaction Mass Electro Static Drive gold coating specification |
GariLynn Billingsley |
Final Design
Core Optics
Auxiliary Optics
Sensing and Control
|
02 Sep 2015 |
E1500357-x0 |
DCN for revision of Gold coating specification for ERM and AERM |
GariLynn Billingsley |
Core Optics
|
31 Aug 2015 |
E1400394-v3 |
Customized Polish for Advanced LIGO Thin Compensation Plate (CP) |
GariLynn Billingsley |
Final Design
Core Optics
|
15 Jul 2015 |
T1500200-v1 |
BRDF of PEEK and stainless steel socket head cap screw - scatter |
GariLynn Billingsley et al. |
System Engineering
Basic R&D
|
27 Apr 2015 |
T1500177-v1 |
Inspect PUM Ears D090007 Serial number 0128 |
GariLynn Billingsley et al. |
Suspensions
|
17 Apr 2015 |
T1000015-v1 |
Report on Gingin Advisory Committee Meeting of December 8, 2009 |
Gregg Harry et al. |
Basic R&D
|
01 Apr 2015 |
T1000378-v1 |
Report on Gingin Advisory Committee Meeting of June 28, 2010 |
Aidan Brooks et al. |
Basic R&D
|
01 Apr 2015 |
E1500065-x0 |
BS03 Polish waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
31 Mar 2015 |
T1100490-v1 |
Forward scatter comparison CP06 and CP03 |
GariLynn Billingsley et al. |
Subsystem Test
Core Optics
|
31 Mar 2015 |
T1500104-v1 |
3IFO COC Inventory |
Jodi Fauver et al. |
Core Optics
|
20 Mar 2015 |
E1300769-v4 |
Core Optics Fabrication Acceptance Documentation |
GariLynn Billingsley et al. |
Core Optics
|
12 Mar 2015 |
T1400252-v3 |
Imaging Scatterometer Characterization of Advanced LIGO Optic ITM06 |
Adrian Avila-Alvarez et al. |
Core Optics
|
11 Mar 2015 |
E1500149-v1 |
ETM11 HR coating pinhole, waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500132-x0 |
ETM09 HR coating waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500131-x0 |
ETM08 HR coating waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500130-x0 |
ITM08 AR coating waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500129-x0 |
ITM04 AR coating waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500127-x0 |
ITM03 AR coating waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500126-x0 |
ITM09 AR coating waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500124-x0 |
ETM08 ETM AR coating waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500122-v1 |
ETM AR coating acceptance ETM08 and ETM12 |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500121-v1 |
ETM08 and ETM09 Pinhole in HR |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500118-x0 |
SR302 Polish Defect side and bevel fracture, waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500117-x0 |
SR302 Polish Defect Incorrect arrow and serial number placement, waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500116-x0 |
SR301 Polish Defect Incorrect arrow and serial number placement, waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500115-x0 |
SR301 Polish Defect side and bevel fracture, waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500114-x0 |
PR303 Polish Defect waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500112-x0 |
ITM06 Polish waiver, Bevel Defect |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500109-x0 |
ITM01 Polish waiver, excess defects |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500108-x0 |
ETM14 Polish waiver, excess defects |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500107-x0 |
ETM11 Polish waiver, Barrel scuff |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500106-x0 |
ETM13 Polish waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500103-x0 |
ETM09 Coating, 532 nm reflection waiver. |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500102-x0 |
ETM08 Coating, 532 nm reflection waiver. |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500100-x0 |
ITM04 Coating, spherical aberration waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500099-x0 |
ETM14 Coating, spherical aberration waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500098-x0 |
ETM11 Coating, spherical aberration waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500096-x0 |
ETM09 Coating, spherical aberration waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500095-x0 |
ETM08 Coating, spherical aberration waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500094-x0 |
ITM09, Mounting flat fracture, waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500093-x0 |
ITM09 Coating, Haze on AR surface, waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500092-x0 |
ITM06 Coating, Haze on AR surface |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500089-x0 |
ITM10 Coating, ripple waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500088-x0 |
ITM09 Coating, ripple waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500087-x0 |
ITM07 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500086-x0 |
ITM06 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500084-x0 |
ITM03 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500083-x0 |
ITM01 Coating, ripple waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500082-x0 |
ETM16 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500081-x0 |
ETM15 Coating, ripple waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500080-x0 |
ETM14 Coating, ripple waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500079-x0 |
ETM13 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500077-x0 |
ETM11 Coating, ripple waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500076-x0 |
ETM10 Coating, ripple waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500075-x0 |
ETM09 Coating, ripple waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500074-x0 |
ETM08 Coating, ripple waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500073-x0 |
ETM07 Coating, ripple waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500072-x0 |
ETM07 Coating, spherical aberration waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500071-x0 |
ETM07 Coating, 532 nm reflection waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500070-x0 |
ETM03 Polish waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500069-x0 |
CP09 Absorption waiver |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
11 Mar 2015 |
E1500068-x0 |
BS06 Absorption waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500067-x0 |
BS05 Polish waiver |
GariLynn Billingsley |
Quality Assurance
Subsystem Test
Core Optics
|
11 Mar 2015 |
E1500066-x0 |
BS04 polish waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500064-x0 |
BS04 AR Absorption waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
E1500063-x0 |
BS03 AR Absorption waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500062-x0 |
BS02 AR Absorption waiver |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
11 Mar 2015 |
E1500061-x0 |
BS01 AR Absorption waiver |
GariLynn Billingsley |
Core Optics
Quality Assurance
Subsystem Test
|
11 Mar 2015 |
L1200291-v5 |
TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions |
Calum Torrie et al. |
Installation
System Engineering
|
11 Mar 2015 |
E1500170-x0 |
Core Optics Fabrication Acceptance links aLIGO |
GariLynn Billingsley |
Core Optics
Quality Assurance
|
11 Mar 2015 |
T1000382-v2 |
Advanced LIGO Core Optics Material Design summary |
GariLynn Billingsley |
Final Design
Core Optics
|
09 Feb 2015 |
E1000158-v1 |
Advanced LIGO Thin Compensation Plate (CP) |
GariLynn Billingsley |
Final Design
Core Optics
|
30 Jan 2015 |
E1000771-x0 |
ITM02 Characterization |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
29 Jan 2015 |
E1400472-v3 |
Test Mass In Situ Cleaning Procedure |
GariLynn Billingsley et al. |
System Engineering
Core Optics
|
15 Dec 2014 |
G1400396-v5 |
Plenary Lecture for SPIE Laser Damage 2014 |
Calum Torrie et al. |
System Engineering
|
18 Sep 2014 |
G1400209-v2 |
Laser Induced Damage due to Particulate Contamination |
GariLynn Billingsley et al. |
Core Optics
Basic R&D
|
08 Sep 2014 |
E1200326-v2 |
First Contact cleaning of water spots or water soluble contamination |
GariLynn Billingsley et al. |
Core Optics
Cleaning
|
04 Sep 2014 |
E1300498-v1 |
Folding Mirror Coating Uniformity Demonstration - specification |
GariLynn Billingsley |
Core Optics
|
10 Jul 2014 |
E0900397-x0 |
DCN for aLIGO optic container shipping procedure |
GariLynn Billingsley |
Core Optics
|
20 Jun 2014 |
T1400403-v1 |
Scatter measurement of small aLIGO Lenses |
GariLynn Billingsley et al. |
Input Optics
System Test
|
13 Jun 2014 |
E1400261-x0 |
DCN aLIGO ETM Coating Specification |
GariLynn Billingsley |
Core Optics
|
03 Jun 2014 |
T1200324-v18 |
Test Mass Optics: Summary of Location, Type, Method of Suspension, Install Dates |
Norna Robertson et al. |
Installation
Core Optics
Suspensions
|
07 Apr 2014 |
E980064-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
20 Mar 2014 |
E970126-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
20 Mar 2014 |
E970124-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
20 Mar 2014 |
E970065-x0 |
Document Change Notice |
GariLynn Billingsley |
Document Migration
|
20 Mar 2014 |
E960109-x0 |
Component Specification - Substrate, Beam Splitter Rework |
GariLynn Billingsley |
Document Migration
|
20 Mar 2014 |
G960251-x0 |
LIGO Core Optics Procurement, NSF Presentation |
GariLynn Billingsley |
Document Migration
|
14 Mar 2014 |
G960242-x0 |
Core Optics Procurement |
GariLynn Billingsley |
Document Migration
|
14 Mar 2014 |
L1000357-v3 |
Advanced LIGO Review Committee Report: Monolithic Stage of the Quad Suspension |
Douglas Cook et al. |
Suspensions
Final Design
Reviews
|
05 Feb 2014 |
P1400005-v1 |
Sapphire mirror for the KAGRA gravitational wave detector |
Eiichi Hirose et al. |
Core Optics
|
23 Jan 2014 |
T1300612-v1 |
Figure measurement of 6" aLIGO Trans Mon Flats |
GariLynn Billingsley |
Auxiliary Optics
|
02 Jul 2013 |
T1300533-v1 |
AR Coating Etching Tests |
Margot Hennig et al. |
Core Optics
|
13 Jun 2013 |
E070124-v3 |
Septum Window Coating Specification |
Lisa Austin et al. |
Fabrication
Auxiliary Optics
|
18 Mar 2013 |
T080026-x0 |
Core Optics Components Design Requirements Document - intermediate/old VERSION |
GariLynn Billingsley et al. |
Document Migration
|
18 Dec 2012 |
E1200821-v2 |
Guidelines for use in de-bonding of epoxy bonds from optics |
GariLynn Billingsley |
Suspensions
Input Optics
Core Optics
|
27 Nov 2012 |
E010140-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
03 Jul 2012 |
E010128-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
03 Jul 2012 |
E010014-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
03 Jul 2012 |
E010007-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
03 Jul 2012 |
E000569-x0 |
Document Change Notice (Filed as D000312-00-D) |
GariLynn Billingsley |
Document Migration
|
29 Jun 2012 |
E980063-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
19 Jun 2012 |
E970074-x0 |
Component Specification - Substrate, Witness Sample |
GariLynn Billingsley |
Document Migration
|
19 Jun 2012 |
E970053-x0 |
Problem/Failure Report (PFR) - CSIRO |
GariLynn Billingsley |
Document Migration
|
14 Jun 2012 |
E960121-x0 |
Document Change Notice |
GariLynn Billingsley |
Document Migration
|
14 Jun 2012 |
E960021-x0 |
Handling LIGO Optics Containers |
GariLynn Billingsley |
Document Migration
|
14 Jun 2012 |
E950104-x0 |
Component Specification: Super Polished Substrate, End Test Mass |
GariLynn Billingsley |
Document Migration
|
12 Jun 2012 |
E950012-x0 |
Technical Specification for Pathfinder Substrate |
GariLynn Billingsley et al. |
Document Migration
|
12 Jun 2012 |
G1200565-v1 |
All about Optics |
GariLynn Billingsley et al. |
Core Optics
Cleaning
Basic R&D
Modelling
|
29 May 2012 |
T1100609-v1 |
TCS Periscope 1 Figure measurement |
GariLynn Billingsley |
Auxiliary Optics
|
06 Dec 2011 |
T1100370-v2 |
Surface figure calibration and uncertainty estimate for measurement of ETM04 |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
22 Nov 2011 |
E1101109-v1 |
PR303 Mass Measurement at Caltech 12.145 Kg |
GariLynn Billingsley |
Core Optics
Subsystem Test
|
18 Nov 2011 |
E1100684-v1 |
Figure measurement ETM04 |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
20 Jul 2011 |
C1105116-v2 |
SOW for precision polish, End Test Masses |
GariLynn Billingsley |
Core Optics
Procurements
|
28 Jun 2011 |
E070069-v1 |
SPECIFICATION - High Quality Window Polish, Advanced LIGO |
GariLynn Billingsley et al. |
Auxiliary Optics
Document Migration
|
16 Jun 2011 |
T1100128-v2 |
aLIGO Beamsplitter coating angular acceptance based on as built wedges |
GariLynn Billingsley et al. |
Final Design
Core Optics
|
16 May 2011 |
G1100493-v5 |
COC Technical Status - NSF 2011 |
GariLynn Billingsley |
Reviews
Core Optics
|
09 May 2011 |
G1100216-v2 |
Core Optics LVC subsystem talk 2011 |
GariLynn Billingsley |
Core Optics
Meeting
|
29 Mar 2011 |
E1000441-x0 |
DCN for Advanced LIGO 312 Figure trial - Sample Prepearation E1000440-v1 |
GariLynn Billingsley |
Core Optics
|
17 Sep 2010 |
E1000440-v1 |
Advanced LIGO 312 Figure trial – Sample Preparation |
GariLynn Billingsley |
Core Optics
|
17 Sep 2010 |
T1000381-v1 |
Advanced LIGO Core Optics Coating Design summary |
GariLynn Billingsley |
Final Design
Core Optics
|
09 Jul 2010 |
T1000383-v1 |
Advanced LIGO Core Optics Polishing Design summary |
GariLynn Billingsley |
Core Optics
Final Design
|
09 Jul 2010 |
T1000380-v1 |
Caltech WYKO pixel calibration |
GariLynn Billingsley |
Core Optics
Subsystem Test
Quality Assurance
|
09 Jul 2010 |
E1000159-x0 |
DCN for Advanced LIGO Thin Compensation Plate polishing specification |
GariLynn Billingsley |
Final Design
Core Optics
|
10 May 2010 |
E1000080-v2 |
Coating, Contamination Cavity |
GariLynn Billingsley |
System Engineering
|
10 Mar 2010 |
M080041-v1 |
Thickness of PR3 and SR3 and wedge information |
Norna Robertson |
Final Design
Suspensions
|
26 Feb 2010 |
L1000003-v3 |
Ear Fabrication Readiness Review |
Gregg Harry et al. |
Reviews
Suspensions
Final Design
|
15 Jan 2010 |
T0900595-v1 |
Production Readiness review for Test Mass and Suspension Mass Ears Questions from the Committee |
Gregg Harry et al. |
Final Design
Suspensions
|
25 Nov 2009 |
E080508-v2 |
Advanced LIGO Metrology Large Aperture Interferometer |
GariLynn Billingsley |
Core Optics
Procurements
|
21 Oct 2009 |
E0900233-v1 |
DCN for Radius of curvature change for SPR3, PR3, F-PR3 |
GariLynn Billingsley et al. |
Fabrication
Core Optics
|
11 Aug 2009 |
E070141-v1 |
DCN for ELi Septum Window Coating specification |
GariLynn Billingsley |
Vacuum
Fabrication
|
07 Aug 2009 |
T0900375-v1 |
AR absorption measurement on Contamination Cavity Sample |
GariLynn Billingsley et al. |
Core Optics
Basic R&D
|
04 Aug 2009 |
D080055-v1 |
ADLIGO ETM MIRROR BLANK |
GariLynn Billingsley et al. |
Core Optics
Final Design
|
16 Jul 2009 |
D080039-v1 |
ADLIGO ITM MIRROR BLANK |
GariLynn Billingsley et al. |
Core Optics
Final Design
|
15 Jul 2009 |
E0900186-v1 |
DCN for initial release of Advanced LIGO Interferometer for Full Aperture Surface Figure Metrology |
GariLynn Billingsley |
Core Optics
|
01 Jul 2009 |
T0900204-v2 |
Analysis of iLigo Witness Plate by Battelle, PNNL |
GariLynn Billingsley et al. |
Basic R&D
Core Optics
|
09 Jun 2009 |
E0900139-x0 |
DCN for release of gold coating specifications and mask drawings for Advanced LIGO |
GariLynn Billingsley |
Sensing and Control
Auxiliary Optics
Final Design
Core Optics
|
12 May 2009 |
E0900142-v1 |
End Reaction Mass Barrel Coating |
GariLynn Billingsley |
Final Design
Suspensions
Core Optics
Auxiliary Optics
System Engineering
|
12 May 2009 |
E080041-v1 |
Specification: Mirror Blank Material, Adv. LIGO Recycling Mirror 3 |
GariLynn Billingsley et al. |
Fabrication
Core Optics
Final Design
|
12 May 2009 |
E080045-v1 |
Specification: Blank Material, Adv. LIGO Folding Mirror |
GariLynn Billingsley et al. |
Fabrication
Core Optics
Final Design
|
12 May 2009 |
E080037-v1 |
Specification: Blank Material, Adv. LIGO Compensation Plate |
GariLynn Billingsley et al. |
Fabrication
Final Design
Core Optics
|
12 May 2009 |
E080530-v1 |
DCN for Advanced LIGO Polishing |
GariLynn Billingsley |
Core Optics
|
05 Jan 2009 |
E080500-x0 |
Large Optics Draft Polishing Specifications for Vendor Review |
GariLynn Billingsley |
Document Migration
|
13 Oct 2008 |
T080185-x0 |
Bulk scattering evaluation of the Suprasil 311SV fused silica |
GariLynn Billingsley et al. |
Document Migration
|
13 Aug 2008 |
E080332-x0 |
Document Change Notice (DCN) - Specification advanced ligo pathfinder polish |
GariLynn Billingsley |
Document Migration
|
16 Jul 2008 |
E060268-x0 |
SPECIFICATION - Advanced LIGO Pathfinder Polish |
GariLynn Billingsley |
Document Migration
|
16 Jul 2008 |
T080152-x0 |
Questions preliminary design review of silica masses for advanced LIGO |
Mark Barton et al. |
Document Migration
|
20 Jun 2008 |
T080146-x0 |
Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review |
GariLynn Billingsley et al. |
Document Migration
|
11 Jun 2008 |
E080048-x0 |
Document Change Notice (DCN) - ADLIGO ETM MIRROR BLANK |
GariLynn Billingsley |
Document Migration
|
15 Apr 2008 |
E080032-x0 |
Document Change Notice (DCN) - ADLIGO ITM MIRROR BLANK |
GariLynn Billingsley |
Document Migration
|
15 Apr 2008 |
E080042-x0 |
Document Change Notice (DCN) - ADLIGO RECYCLING MIRROR 3 BLANK |
GariLynn Billingsley |
Document Migration
|
15 Apr 2008 |
E080046-x0 |
Document Change Notice (DCN) - ADLIGO FOLDING MIRROR BLANK |
GariLynn Billingsley |
Document Migration
|
15 Apr 2008 |
E080038-x0 |
Document Change Notice (DCN) - ADLIGO CP MIRROR BLANK |
GariLynn Billingsley |
Document Migration
|
15 Apr 2008 |
E080036-x0 |
Document Change Notice (DCN) - ADLIGO BS MIRROR BLANK |
GariLynn Billingsley |
Document Migration
|
15 Apr 2008 |
T080085-x0 |
Homogeneity Summary - Initial LIGO ETMs and FMs |
GariLynn Billingsley |
Document Migration
|
14 Apr 2008 |
G080162-x0 |
The Coating Scattering and Absorption Measurements of LIGO I mirrors at Caltech |
Helena Armandula et al. |
Document Migration
|
11 Apr 2008 |
E080033-x0 |
Advanced LIGO Core Optics Components Preliminary Design |
Helena Armandula et al. |
Document Migration
|
08 Feb 2008 |
T060024-x0 |
Advanced LIGO Mode Cleaner Wire Suspension Preliminary Design Review Report |
GariLynn Billingsley et al. |
Document Migration
|
16 Jan 2008 |
T050245-x0 |
Advanced LIGO Suspension Ribbon/Fiber/Ear/Bonding Preliminary Design Review Report |
GariLynn Billingsley et al. |
Document Migration
|
24 Oct 2007 |
T070258-x0 |
Comparison of 311 and 3001 heraeus material homogeneity and OH content for Advanced LIGO |
GariLynn Billingsley |
Document Migration
|
19 Oct 2007 |
D070273-x0 |
Metrology V-Block, Advanced LIGO Pathfinder |
GariLynn Billingsley |
Document Migration
|
08 Oct 2007 |
G070193-x0 |
Core Optics Components (COC) - polishing pathfinder kickoff presentation at QED |
GariLynn Billingsley |
Document Migration
|
02 Oct 2007 |
T070174-x0 |
LASTI Test Mass characterization and test plan |
GariLynn Billingsley |
Document Migration
|
10 Aug 2007 |
E070094-x0 |
Document Change Noitce (DCN) - ELI Septum Window |
GariLynn Billingsley |
Document Migration
|
22 May 2007 |
D070153-x0 |
Fused Silica Blank, low absorption Input Test Mass |
GariLynn Billingsley |
Document Migration
|
16 May 2007 |
E070143-x0 |
Document Change Notice (DCN) - Fused Silica Blank, low absorption Input Test Mass |
GariLynn Billingsley |
Document Migration
|
16 May 2007 |
E070142-x0 |
SPECIFICATION - Fused Silica Blank, low absorption Input Test Mass |
GariLynn Billingsley |
Document Migration
|
16 May 2007 |
D060513-x0 |
Fused silica substrate, Advanced LIGO Pathfinder |
GariLynn Billingsley |
Document Migration
|
22 Mar 2007 |
E070067-x0 |
Document Change Notice (DCN) - Advanced LIGO Pathfinder drawing revision |
GariLynn Billingsley |
Document Migration
|
22 Mar 2007 |
D060527-x0 |
Fused silica Blank, LASTI Compensation Plate |
GariLynn Billingsley |
Document Migration
|
22 Dec 2006 |
E060275-x0 |
Document Change Notice (DCN) - LASTI Compensation Plate |
GariLynn Billingsley |
Document Migration
|
22 Dec 2006 |
E060274-x0 |
SPECIFICATION - Polish LASTI Compensation Plate |
GariLynn Billingsley |
Document Migration
|
21 Dec 2006 |
E060273-x0 |
SPECIFICATION - Fused silica Blank, LASTI Compenation Plate |
GariLynn Billingsley |
Document Migration
|
21 Dec 2006 |
E060269-x0 |
Document Change Notice (DCN) - Advanced LIGO Pathfinder |
GariLynn Billingsley |
Document Migration
|
01 Dec 2006 |
E050190-x0 |
SPECIFICATION - Final Polish, LASTI End Test Mass (ETM) |
GariLynn Billingsley |
Document Migration
|
24 Aug 2006 |
E060179-x0 |
Document Change Notice (DCN) - Initial releases for Final Polish, LASTI ETM/Shape and Polish LASTI ETM Blank Specs |
GariLynn Billingsley |
Document Migration
|
07 Jul 2006 |
E050191-x0 |
SPECIFICATION - Shape and Polish LASTI ETM Blank |
GariLynn Billingsley |
Document Migration
|
07 Jul 2006 |
G060040-x0 |
4ITM07 Postmortem - LSC Meeting, March 19-22, 2006, Hanford WA |
Helena Armandula et al. |
Document Migration
|
14 Apr 2006 |
E060001-x0 |
Document Change Notice (DCN) - Initial Release of COC, Quad ETM, Silica Test Mass |
GariLynn Billingsley |
Document Migration
|
11 Jan 2006 |
E050319-x0 |
Document Change Notice (DCN) - Initial Release for Fused Silica Annealing Samples |
GariLynn Billingsley |
Document Migration
|
15 Dec 2005 |
E050318-x0 |
SPECIFICATION: Annealing Samples - Fused Silica |
GariLynn Billingsley |
Document Migration
|
14 Dec 2005 |
D050423-x0 |
Fused Silica Annealing Sample |
GariLynn Billingsley |
Document Migration
|
14 Dec 2005 |
T050178-x0 |
Further Investigation of Hanford ITM Absorption |
GariLynn Billingsley |
Document Migration
|
20 Sep 2005 |
E050223-x0 |
Document Change Notice (DCN) - Fused Silica Blank, Input Test Mass (correction of D010115 - incorrect drawing number) |
GariLynn Billingsley |
Document Migration
|
13 Sep 2005 |
E050071-x0 |
SPECIFICATION - Fused Silica Input Test Mass for Advanced LIGO |
GariLynn Billingsley |
Document Migration
|
13 Sep 2005 |
D050337-x0 |
Fused Silica Blank, Input Test Mass |
GariLynn Billingsley |
Document Migration
|
13 Sep 2005 |
E050203-x0 |
Document Change Notice (DCN) - Fused Silica Blank, Input Test Mass |
GariLynn Billingsley |
Document Migration
|
10 Aug 2005 |
E050072-x0 |
Document Change Notice (DCN) - Fused Silica Blank, Input Test Mass for Advanced LIGO |
GariLynn Billingsley |
Document Migration
|
20 Jun 2005 |
E030310-x0 |
Document Change Notice (DCN) - for Fused Silica Blank, LASTI Test Mass |
GariLynn Billingsley |
Document Migration
|
01 Jun 2005 |
D030265-x0 |
Fused Silica Blank, LASTI Test Mass |
GariLynn Billingsley |
Document Migration
|
05 Jan 2005 |
E040506-x0 |
Document Change Notice (DCN) - FUSED SILICA PIN |
GariLynn Billingsley |
Document Migration
|
14 Dec 2004 |
D040558-x0 |
FUSED SILICA PIN |
GariLynn Billingsley |
Document Migration
|
14 Dec 2004 |
E010032-x0 |
Document Change Notice (DCN) - 40 meter Substrate, Mode Cleaner Curved Mirror |
GariLynn Billingsley |
Document Migration
|
09 Nov 2004 |
T030299-x0 |
Scatter from 2ITM01 viewed with a Dark Field Microscope |
Helena Armandula et al. |
Document Migration
|
12 Oct 2004 |
T000128-x0 |
COC Subsystem Development Plan |
GariLynn Billingsley |
Document Migration
|
11 Aug 2004 |
T020103-x0 |
Test Mass Material Down-select Plan |
GariLynn Billingsley et al. |
Document Migration
|
11 Aug 2004 |
T000098-x0 |
Core Optics Components Conceptual Design Document |
Helena Armandula et al. |
Document Migration
|
11 Aug 2004 |
G040160-x0 |
Lowering Mechanical Loss in Fused Silica Optics with Annealing - LSC Meeting, March 15 - 18th, Livingston, LA |
Alexander Ageev et al. |
Document Migration
|
19 Mar 2004 |
G040003-x0 |
Core Optics Components - Design Requirements Review |
Helena Armandula et al. |
Document Migration
|
06 Jan 2004 |
T010087-x0 |
Lyon Metrology images |
GariLynn Billingsley |
Document Migration
|
05 Nov 2003 |
E030245-x0 |
SPECIFICATION - 70 x 60 mm, 15mmCC sapphire Q substrate |
GariLynn Billingsley |
Document Migration
|
07 Oct 2003 |
E030243-x0 |
SPECIFICATION - 70 x 60 mm sapphire Q substrate |
GariLynn Billingsley |
Document Migration
|
07 Oct 2003 |
D030403-x0 |
70 x 60 mm Sapphire Q Substrate |
GariLynn Billingsley |
Document Migration
|
07 Oct 2003 |
D030385-x0 |
15mm CC sapphire Q substrate |
GariLynn Billingsley |
Document Migration
|
07 Oct 2003 |
E030246-x0 |
Document Change Notice (DCN) for 70 x 60 mm, 15mm CC sapphire Q substrate |
GariLynn Billingsley |
Document Migration
|
07 Oct 2003 |
T030177-x0 |
Homogeneity of Sapphire a vs. m axis |
GariLynn Billingsley |
Document Migration
|
22 Sep 2003 |
G030509-x0 |
Fused Silica Research for Advanced LIGO - LSC Meeting, August 18th - 21st, Hannover, Germany |
Alexander Ageev et al. |
Document Migration
|
15 Sep 2003 |
E030312-x0 |
SPECIFICATION - RTS scanner modification |
GariLynn Billingsley |
Document Migration
|
04 Aug 2003 |
E030394-x0 |
Document Change Notice (DCN) for RTS Scanner modification |
GariLynn Billingsley |
Document Migration
|
30 Jul 2003 |
T010047-x0 |
Minutes of Core Optics Subgroup telecon, 3-8-01 |
Alex Alexandrovski et al. |
Document Migration
|
27 May 2003 |
T990136-x0 |
BS03-B (Repolished, Recoated) |
GariLynn Billingsley |
Document Migration
|
23 May 2003 |
E020252-x0 |
Document Change Notice (DCN) - Initial Release of D020041-A and E020251-A |
GariLynn Billingsley |
Document Migration
|
23 May 2003 |
T990137-x0 |
BS04-B (Repolished, Recoated) |
GariLynn Billingsley |
Document Migration
|
23 May 2003 |
E030008-x0 |
Document Change Notice (DCN) - Initial Release of E030007-A-D and D030005-A-D |
GariLynn Billingsley |
Document Migration
|
12 May 2003 |
D030005-x0 |
BLANK, LASTI RECYCLING |
GariLynn Billingsley |
Document Migration
|
12 May 2003 |
E030007-x0 |
SPECIFICATION - Recycling Mirror Blank, LASTI Experiment |
GariLynn Billingsley |
Document Migration
|
12 May 2003 |
E030113-x0 |
Document Change Notice (DCN) - Substrate, Input Test Mass, 40M RSE Experiment (E030112-A & D030136-A)) |
GariLynn Billingsley |
Document Migration
|
24 Apr 2003 |
E030105-x0 |
Document Change Notice (DCN) - Substrate, Homogeneity Experiment (D030128-A) |
GariLynn Billingsley |
Document Migration
|
24 Apr 2003 |
G030074-x0 |
Advanced LIGO Test Mass Material selection status - LSC Meeting, March 17th - 20th, Livingston, LA |
GariLynn Billingsley |
Document Migration
|
19 Mar 2003 |
D030136-x0 |
Substrate, 125 x 50 mm, Q Experiment |
GariLynn Billingsley |
Document Migration
|
10 Mar 2003 |
E030112-x0 |
SPECIFICATION - Substrate, 125 x 50 mm, Q Experiment |
GariLynn Billingsley |
Document Migration
|
10 Mar 2003 |
D030128-x0 |
Substrate, Homogeneity Test |
GariLynn Billingsley |
Document Migration
|
28 Feb 2003 |
E030011-x0 |
Document Change Notice (DCN) - Change in Gin Gin ITM Coating Spec |
GariLynn Billingsley |
Document Migration
|
24 Feb 2003 |
E021064-x0 |
SPECIFICATION - Coating, End Test Mass, Gin Gin Experiment |
GariLynn Billingsley |
Document Migration
|
30 Jan 2003 |
E021063-x0 |
SPECIFICATION - Coating, Input Test Mass, Gin Gin Experiment |
GariLynn Billingsley |
Document Migration
|
30 Jan 2003 |
E021065-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
08 Jan 2003 |
E020804-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
25 Sep 2002 |
D020424-x0 |
Substrate, End Test Mass, Gingin Experiment |
GariLynn Billingsley |
Document Migration
|
23 Sep 2002 |
D020423-x0 |
Substrate, Input Test Mass, Gingin Experiment |
GariLynn Billingsley |
Document Migration
|
23 Sep 2002 |
E020800-x0 |
SPECIFICATION - Substrate, Input Test Mass, Gin Gin Experiment |
GariLynn Billingsley |
Document Migration
|
18 Sep 2002 |
E020801-x0 |
SPECIFICATION - Substrate, End Test Mass, Gin Gin Experiment |
GariLynn Billingsley |
Document Migration
|
18 Sep 2002 |
D020150-x0 |
Substrate, LASTI Test Mass |
GariLynn Billingsley |
Document Migration
|
26 Jun 2002 |
D020344-x0 |
Polished Blank, Downselect |
GariLynn Billingsley |
Document Migration
|
26 Jun 2002 |
E020389-x0 |
SPECIFICATION - Sapphire Substrate, LASTI Test Mass, R&D |
GariLynn Billingsley |
Document Migration
|
26 Jun 2002 |
E020615-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
31 May 2002 |
E010127-x0 |
SPECIFICATION - Homogeneity Compensation for the LIGO Pathfinder II Large Sapphire Substrate |
GariLynn Billingsley |
Document Migration
|
30 May 2002 |
T020054-x0 |
Segmented Mirror Measurements (e-mail agreement to support CELT metrology) |
GariLynn Billingsley |
Document Migration
|
08 Apr 2002 |
E020251-x0 |
SPECIFICATION - Sapphire Substrate, Coating Effect on Mechanical Q, R&D |
GariLynn Billingsley |
Document Migration
|
12 Mar 2002 |
D020041-x0 |
Mechanical Q R&D Substrate |
GariLynn Billingsley |
Document Migration
|
27 Feb 2002 |
E020223-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
04 Feb 2002 |
E010201-x0 |
Specification - Coating, Mode Cleaner Curved Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
04 Feb 2002 |
E010200-x0 |
Specification - Coating, Mode Cleaner Flat Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
04 Feb 2002 |
T010115-x0 |
Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer |
Benjamin Abbott et al. |
Document Migration
|
26 Nov 2001 |
E010192-x0 |
Specification: Coating, Power Recycling Mirror, Type A, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010197-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010193-x0 |
Specification: Coating, Signal Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010199-x0 |
Specification: Coating, Power Recycling Mirror, Type C, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010196-x0 |
Specification: Coating, End Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010195-x0 |
Specification: Coating, Input Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010198-x0 |
Specification: Coating, Power Recycling Mirror, Type B, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010194-x0 |
Specification: Coating, Beam Splitter, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Nov 2001 |
E010202-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
05 Nov 2001 |
E960100-x0 |
COMPONENT SPECIFICATION - Substrate, Beam Splitter |
GariLynn Billingsley |
Document Migration
|
05 Nov 2001 |
T010116-x0 |
Minutes of the Core Optics Subgroup, 10/11/01 |
GariLynn Billingsley |
Document Migration
|
29 Oct 2001 |
E010102-x0 |
Specification - Substrate, Input Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
25 Sep 2001 |
E010174-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
25 Sep 2001 |
E010099-x0 |
Specification - Substrate, Power Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
25 Sep 2001 |
E010100-x0 |
Specification - Substrate, Signal Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
25 Sep 2001 |
E010101-x0 |
Specification - Substrate, Beam Splitter 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
25 Sep 2001 |
D010103-x0 |
Substrate, Beam Splitter, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010102-x0 |
Substrate, Signal Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
E010103-x0 |
Specification - Substrate, End Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010104-x0 |
Substrate, Input Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010101-x0 |
Substrate, Power Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
E010104-x0 |
Document Change Notice - DCN |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010105-x0 |
Substrate, End Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010117-x0 |
Surface 2 Polish, LIGO Pathfinder II Large Sapphire Substrate |
GariLynn Billingsley |
Document Migration
|
08 Aug 2001 |
T010082-x0 |
Minutes of COC Telecon - July 12, 2001 |
GariLynn Billingsley |
Document Migration
|
17 Jul 2001 |
E010089-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
16 May 2001 |
E010033-x0 |
Specification - Substrate, Mode Cleaner Flat Mirror, 40M RSE Experiement |
GariLynn Billingsley |
Document Migration
|
07 May 2001 |
E000517-x0 |
Specification - Substrate, Mode Cleaner Curved Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
07 May 2001 |
T010054-x0 |
Minutes of the Core Optics Subgroup, 4/12/01 |
GariLynn Billingsley |
Document Migration
|
27 Apr 2001 |
T000129-x0 |
Specification - Interferometer Measurement Procedure |
GariLynn Billingsley |
Document Migration
|
20 Apr 2001 |
D010054-x0 |
Substrate, Mode Cleaner Flat Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
20 Apr 2001 |
D000464-x0 |
Substrate, Mode Cleaner Curved Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
20 Apr 2001 |
G010179-x0 |
Core Optics |
GariLynn Billingsley |
Document Migration
|
11 Apr 2001 |
G010060-x0 |
Metrology of LIGO Optics Using Fizeau Interferometry |
GariLynn Billingsley |
Document Migration
|
12 Mar 2001 |
T010021-x0 |
Minutes of the Core Optics Subgroup, 01-11-01 |
GariLynn Billingsley |
Document Migration
|
28 Feb 2001 |
T010022-x0 |
Minutes of the Core Optics Subgroup, 02-15-01 |
Helena Armandula et al. |
Document Migration
|
28 Feb 2001 |
T010020-x0 |
Core Optics Telecon, December 14, 2000 |
Helena Armandula et al. |
Document Migration
|
28 Feb 2001 |
T010005-x0 |
Sapphire Homogeneity Phase Maps |
GariLynn Billingsley |
Document Migration
|
21 Feb 2001 |
E010019-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
20 Feb 2001 |
E010012-x0 |
Component Specification - LIGO II Pathfinder, Large Sapphire Polishing Specification |
GariLynn Billingsley |
Document Migration
|
20 Feb 2001 |
D010032-x0 |
LIGO II Large Pathfinder Substrate |
GariLynn Billingsley |
Document Migration
|
20 Feb 2001 |
E010039-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
20 Feb 2001 |
G010011-x0 |
The Core Optics |
GariLynn Billingsley |
Document Migration
|
02 Feb 2001 |
D000312-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
24 Jan 2001 |
E000041-x0 |
Component Specification: LIGO II Pathfinder Sapphire Polishing Specification, Rev. A |
GariLynn Billingsley |
Document Migration
|
16 Jan 2001 |
T000140-x0 |
Specification for Advanced LIGO COC |
GariLynn Billingsley |
Document Migration
|
12 Jan 2001 |
E000409-x0 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, RECYCLING MIRROR, 40M |
GariLynn Billingsley |
Document Migration
|
10 Jan 2001 |
E000410-x0 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, END TEST MASS, 40M |
GariLynn Billingsley |
Document Migration
|
10 Jan 2001 |
E000408-x0 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, INPUT TEST MASS, 40M |
GariLynn Billingsley |
Document Migration
|
10 Jan 2001 |
E000413-x0 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, BEAM SPLITTER, 40M |
GariLynn Billingsley |
Document Migration
|
10 Jan 2001 |
D000268-x0 |
Recycling Mirror Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000266-x0 |
Input Test Mass Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000265-x0 |
Beam Splitter Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000267-x0 |
End Test Mass Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
T990135-x0 |
BS02-B, Repolished and Recoated |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990165-x0 |
RM07 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990156-x0 |
4ITM06-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990162-x0 |
RM04 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990176-x0 |
SPETM06 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990151-x0 |
4ITM01-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990140-x0 |
ETM01 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990170-x0 |
RM12 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990147-x0 |
2ITM01-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990143-x0 |
ETM04 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990160-x0 |
RM02 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990166-x0 |
RM08 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990172-x0 |
SPETM01 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990144-x0 |
FM02 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990142-x0 |
ETM03 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990149-x0 |
2ITM03-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990175-x0 |
SPETM04 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990155-x0 |
4ITM05-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990148-x0 |
2ITM02-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990161-x0 |
RM03 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990146-x0 |
FM04 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990134-x0 |
BS01-B |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990152-x0 |
4ITM02-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990157-x0 |
4ITM07-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990163-x0 |
RM05 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990177-x0 |
SPETM06 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990168-x0 |
RM10 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990138-x0 |
BS05-B |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990139-x0 |
BS06-B |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990169-x0 |
RM11 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990179-x0 |
SPETM08 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990159-x0 |
RM01 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990158-x0 |
42ITM08-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990145-x0 |
FM03 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990178-x0 |
SPETM07 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990173-x0 |
SPETM02 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990150-x0 |
2ITM04-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990167-x0 |
RM09 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990153-x0 |
4ITM03-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990171-x0 |
RM13 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990154-x0 |
4ITM04-C |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990174-x0 |
SPETM03 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990141-x0 |
ETM02 |
GariLynn Billingsley |
Document Migration
|
02 Aug 2000 |
T990133-x0 |
FM01 |
GariLynn Billingsley |
Document Migration
|
26 Jul 2000 |
G980063-x0 |
International Collaboration Optical Test and Development, PAC4 - 23 April 1998 |
GariLynn Billingsley |
Document Migration
|
29 Mar 2000 |
D960791-x0 |
End Test Mass Substrate |
Craig Conley et al. |
Document Migration
|
01 Mar 2000 |
G990091-x0 |
Gravitational Wave Interferometry: How Does It Work? - Presented at Interferometry `99 Warsaw, Poland 9-20-99 |
GariLynn Billingsley |
Document Migration
|
17 Sep 1999 |
T990057-x0 |
Caltech Measurements of Coated Optics Phase Maps: Sept16 ATP TEST VOL I |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990051-x0 |
Caltech Measurements of Coated Optics Phase Maps: ATP 9/23, 9/21, MTF DATA Zemax files |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990063-x0 |
Caltech Measurements of Coated Optics Phase Maps: Backup-matlab-Vision32-SHAO_M_DEVSTUDIO 12/9/98 |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990064-x0 |
Caltech Measurements of Coated Optics Phase Maps: 3 FLAT 08_09_98 |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990056-x0 |
Caltech Measurements of Coated Optics Phase Maps: C.B. One Shot Oct 18th |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990053-x0 |
Caltech Measurements of Coated Optics Phase Maps: Random C-FM2 points 1-16 & center, mid, edge VOLUME I |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990061-x0 |
Caltech Measurements of Coated Optics Phase Maps: C-A Oct 15 -Good Combo 3flat |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990049-x0 |
Caltech Measurements of Coated Optics Phase Maps: CSIRO IRx Data, Data Oct20/BIA |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990050-x0 |
Caltech Measurements of Coated Optics Phase Maps: Mac 1 8/17/98 OLD ATPS |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990058-x0 |
Caltech Measurements of Coated Optics Phase Maps: 3 Flat data Oct 7/16 (-10-15) |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990062-x0 |
Caltech Measurements of Coated Optics Phase Maps: RMO3 Dec 15 1998 |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990055-x0 |
Caltech Measurements of Coated Optics Phase Maps: Random C-FM2 Volume II |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990052-x0 |
Caltech Measurements of Coated Optics Phase Maps: RM01 12/99 VI |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990054-x0 |
Caltech Measurements of Coated Optics Phase Maps: Vision 32.01C old/Oct20 BIA |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990059-x0 |
Caltech Measurements of Coated Optics Phase Maps: Sept. 16 ATP VOL II |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990060-x0 |
Caltech Measurements of Coated Optics Phase Maps: Sept 25 DRFT ATP -Drift Test |
GariLynn Billingsley |
Document Migration
|
14 Sep 1999 |
T990019-x0 |
Characterization of the Cosmic Ray Shack as a Potential Site for the IR Metrology Lab |
GariLynn Billingsley |
Document Migration
|
25 Feb 1999 |
D980441-x0 |
1) 2ITM02 #1, Surface Oblique Display, 2) 2ITM02 #2, Surface Oblique Display |
GariLynn Billingsley |
Document Migration
|
29 Oct 1998 |
E980061-x0 |
Core Optics Components (COC) Final Design Document |
Helena Armandula et al. |
Document Migration
|
27 Apr 1998 |
E980058-x0 |
Flat, Transmission, 150 mm, Coated, Rev A |
GariLynn Billingsley |
Document Migration
|
13 Apr 1998 |
E980019-x0 |
Component Specification: Substrate, Suprasil 312 |
GariLynn Billingsley |
Document Migration
|
01 Apr 1998 |
E980020-x0 |
Component Specification: Reference Flats, Uncoated |
GariLynn Billingsley |
Document Migration
|
23 Mar 1998 |
G970286-x0 |
Optical Development of Test Masses - Presentation in Adelaide, Australia |
GariLynn Billingsley |
Document Migration
|
23 Mar 1998 |
E980059-x0 |
Component Specification: Reference Flat, AR Coated |
GariLynn Billingsley |
Document Migration
|
23 Mar 1998 |
T960167-x0 |
Comparative Results from Pathfinder Polishing |
GariLynn Billingsley |
Document Migration
|
10 Feb 1998 |
E960093-x0 |
Component Specification - Substrate, Input Test Mass, Rev. C |
GariLynn Billingsley |
Document Migration
|
28 Jan 1998 |
E980005-x0 |
Document Change Notice |
GariLynn Billingsley |
Document Migration
|
28 Jan 1998 |
E960094-x0 |
Component Specification - Mirror Blank Material, Beam Splitter, Rev. B |
GariLynn Billingsley |
Document Migration
|
04 Dec 1997 |
E960092-x0 |
Component Specification: Substrate, Recycling Mirror |
GariLynn Billingsley |
Document Migration
|
11 Aug 1997 |
E960096-x0 |
Component Specification: Mirror Blank Material, Recycling Mirror |
GariLynn Billingsley |
Document Migration
|
05 Aug 1997 |
D960793-x0 |
Beam Splitter Blank |
GariLynn Billingsley et al. |
Document Migration
|
20 Feb 1997 |
D960794-x0 |
Core Optic Blank |
GariLynn Billingsley et al. |
Document Migration
|
20 Feb 1997 |
E960101-x0 |
Component Specification - Substrate, Folding Mirror |
GariLynn Billingsley |
Document Migration
|
27 Sep 1996 |
E960102-x0 |
Component Specification - Substrate, End Test Mass |
GariLynn Billingsley |
Document Migration
|
27 Sep 1996 |
E960097-x0 |
Component Specification - Mirror Blank Material, Folding Mirror, End Test Mass |
GariLynn Billingsley |
Document Migration
|
13 Sep 1996 |
E960095-x0 |
Component Specification - Mirror Blank Material, Input Test Mass |
GariLynn Billingsley |
Document Migration
|
13 Sep 1996 |