4/19/2016 D. Coyne: Pending change to be incorporated:
If funds are required to execute an ECR (other than staff labor time), the account number(s) (for materials, supplies, equipment, services, etc.) shall be defined at the time of ECR approval by Systems Engineering. The account number shall be included in the "Abstract" field of the DCC entry for the ECR for ready reference.

1) Development costs are typically borne by either:
a) the developing group's operations account(s), and/or
b) an R&D account, and/or
c) a Fabricated Equipment account (drawn from Ops or R&D funds) if warranted

2) Production & installation costs are typically borne by the "upgrade/enhancement" funds for each observatory, and are allocated into sub-accounts by the systems and the business group, as defined in M1500001

5/11/2016 D. Coyne: Pending clarification to be incorporated:
ECRs should, in general, be written & approved before one spends significant time and effort on designing or prototyping (not just before asking for production funds); The intent is to not waste labor time if the proposed change will not be approved.
e.g. see Figure 9, "Process Diagram: ECR", in M1500313-v2, "Process Flow for Engineering Operations of the LIGO Detector Systems"