Documents from Last 2 Days

These documents have been modified in the last 2 days.

modified in the last days.

LIGO-Number Title Author(s) Topic(s) Last Updated
G1501518-v18 aLIGO DARM Signal Chain (Calibration Subway Map) Sudarshan Karki et al. Calibration
25 Apr 2019
P190412-v12 GW190412: Observation of a Binary-Black-Hole Coalescence with Asymmetric Masses LIGO Scientific Collaboration et al. Compact Binaries
30 Sep 2020
P1400112-x0 aLIGO Instrument Science Publications or References or Bibliography David Shoemaker Reports
Detector
03 Nov 2015
M2000238-v1 IEEE Milestone Award to LIGO Rich Abbott Public relations
29 Sep 2020
L960370-v1 Calculation/Design Check of the Alternative BT Guided Support Design Dennis Coyne Vacuum
Document Migration
29 Sep 2020
C960739-x0 Missing Page for ICD-BTT and Interface Control Document for the Beam Tube and the Beam Tube Slab Lance Buboltz Document Migration
29 Sep 2020
C960366-v1 Design Document Revisions - Design Calculations for CDRL`s 10 & 24 - CDRL 10 & 24, DRD 03 Lance Buboltz Document Migration
29 Sep 2020
C951392-x0 Foundation Loads and Valve Support at the Terminations Lance Buboltz Document Migration
29 Sep 2020
T1900628-v1 Beam Tube Support Loads Dennis Coyne Final Design
Vacuum
29 Sep 2020
P1200087-v58 Prospects for Observing and Localizing Gravitational-Wave Transients with Advanced LIGO, Advanced Virgo and KAGRA LIGO Scientific Collaboration et al. Commissioning
Astrophysics / Multi-messenger
Compact Binaries
GW Bursts
29 Sep 2020
D1700316-v1 Squeezer 25-pin D-sub In-vacuum Cable Rich Abbott Squeezer
23 Sep 2020
D1500152-v2 TMDS Interface Box Benjamin Abbott Core Optics
29 Sep 2020
T960012-v1 Specifications for the Baffle Serrations in the LIGO Beam Tubes Eanna Flanagan et al. Document Migration
28 Sep 2020
D1900281-v3 FDS-SQZ optics table layouts Lee McCuller A+
Squeezer
Preliminary Design
09 Jan 2020
G030701-v1 Residual Gas in the LIGO Beam Tubes: Science, Arts and Recipes Rainer Weiss Vacuum
28 Sep 2020
G2000867-v1 Attack of Stainless Steel Beam Tube - Microbially-Induced Corrosion Dan Henkel Vacuum
28 Sep 2020
T2000431-v4 Filter Cavity Tube (FCT) Support Loads Dennis Coyne et al. A+
Vacuum
09 Sep 2020
D950093-x0 Beam Tube Termination Foundations None Document Migration
02 Apr 2014

Number of documents found: 18


DCC Version 3.3.0, contact Document Database Administrators