Document List by Author

Caroline Cantley of Unknown Institution is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T010103-v1 aLIGO Suspension System Conceptual Design Russell Jones et al. Conceptual Design
Suspensions
09 Jun 2011
T060135-x0 Design development of the SUS ETM structures Mark Barton et al. Document Migration
14 Mar 2008
T060113-x0 Welding and cleaning specification for SUS ETM structures Mark Barton et al. Document Migration
14 Mar 2008
G070444-x0 Production and characterisation of fused silica suspension ribbons for Advanced LIGO - 7th Edoardo Amaldi Conference on Gravitational Waves, July 8 -14 2007, Sydney Australia Mark Barton et al. Document Migration
21 Dec 2007
T070155-x0 Preliminary Measured and Predicted Frequency Analysis of the Noise Prototype Structures Caroline Cantley et al. Document Migration
07 Aug 2007
T060087-x0 Finite Element Analysis of Advanced LIGO SUS ETM Structures using ANSYS Classic beam models Mark Barton et al. Document Migration
07 Aug 2007
T060088-x0 Finite Element Analysis of Advanced LIGO SUS ETM structures using ANSYS workbench Mark Barton et al. Document Migration
07 Aug 2007
T060099-x0 Sources of Technical noise in quad suspensions Stuart Aston et al. Document Migration
06 Jun 2007
T060262-x0 Accommodation of Glasgow CO2 laser fibre pulling & welding machine at LASTI for noise prototype installation – site visit October 2006 Caroline Cantley et al. Document Migration
20 Nov 2006
G050558-x0 Bonding, Ear, Ribbon/Fibre PDR - Summary Slides with Response to Questions Caroline Cantley Document Migration
07 Nov 2006
T060022-x0 Early tests on a bonded ear/welded fibre assembly Caroline Cantley et al. Document Migration
07 Nov 2006
T050265-x0 Bonding and Visual Inspection of Preliminary Test Ears (serial number 0021 to 0030) Caroline Cantley et al. Document Migration
07 Nov 2006
T050215-x0 Monolithic stage conceptual design for Advanced LIGO ETM/ITM Helena Armandula et al. Document Migration
25 Sep 2006
T060147-x0 Bonding, Ear, Ribbon/Fibre PDR - Response to Committee Report Helena Armandula et al. Document Migration
23 Jun 2006
G060049-x0 Update on development of Advanced LIGO quad noise prototype - LSC Meeting, March 19-22, 2006, Hanford WA Caroline Cantley Document Migration
20 Apr 2006
T030137-x0 ETM Controls Prototype: Mass Estimate of an ETM Suspension Layout Caroline Cantley et al. Document Migration
13 Apr 2006
T050237-x0 Advanced LIGO Preliminary Frequency Analysis of the Quadruple Pendulum Controls Prototype (second) Structure Mark Barton et al. Document Migration
13 Apr 2006
T060039-x0 Caltech controls method for suspending masses Mark Barton et al. Document Migration
10 Apr 2006
T060059-x0 Finite Element Analysis of Advanced LIGO SUS ETM Structures Mark Barton et al. Document Migration
16 Mar 2006
T050121-x0 Bonding & Visual Inspection of Preliminary Test Ears (Serial Number 0011 - 0014) Caroline Cantley et al. Document Migration
18 Oct 2005
T050214-x0 Concept for variable load clamp for ETM/ITM monolithic assembly Caroline Cantley et al. Document Migration
18 Oct 2005
T050206-x0 Production and characterization of synthetic fused silica ribbons for Advanced LIGO suspensions Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050210-x0 Bonding & visual inspection of preliminary test ears (serial numbers 0005, 0006, 0015 & 0016) Helena Armandula et al. Document Migration
18 Oct 2005
T050216-x0 Ear bond area limit for ETM/ITM optics from consideration of thermal noise Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050219-x0 An alternative to wire loops for suspension of penultimate and reaction masses Caroline Cantley et al. Document Migration
18 Oct 2005
T050207-x0 Optical profiling device for dimensional characterization of ribbons/fibres Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050211-x0 Bonded ear strength tests (serial number 0001, 0002 and 0011 to 0014) Helena Armandula et al. Document Migration
18 Oct 2005
T050118-x0 Ribbon-ear interface for ETM/ITM monolithic suspensions Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050209-x0 Bonding & visual inspection of preliminary test ears (serial number 0001 - 0004) Caroline Cantley et al. Document Migration
18 Oct 2005
T050212-x0 Ribbon tolerances and alignment requirements for Advanced LIGO optics Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T040213-x0 Update on development of a CO2 laser machine for pulling and welding silica fibres and ribbons Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050077-x0 Separation of chains in quad suspensions Caroline Cantley et al. Document Migration
15 Sep 2005
T040170-x0 Silicate Bonding, “Ears”, Ribbon/Fiber Status / Research and Development Plan Helena Armandula et al. Document Migration
08 Sep 2005
T040071-x0 Top Mass for ETM Controls Prototype Quad Pendulum Suspension - Product Design Specification Caroline Cantley et al. Document Migration
27 Jul 2005
G050316-x0 Update on Aspects of the Suspension Design for Advanced LIGO Helena Armandula et al. Document Migration
28 Jun 2005
G050187-x0 ADVANCED LIGO SUS ETM STRUCTURAL DESIGN SUMMARY - LSC Meeting, March 20-23, 2005, Livingston LA Caroline Cantley et al. Document Migration
07 Apr 2005
T030278-x0 Advanced LIGO SUS Preliminary Frequency Analysis of the Mode Cleaner Structure Mark Barton et al. Document Migration
07 Apr 2005
T050034-x0 ETM Controls Prototype: “3 &1” Assembly Technique plus additional discussion material Caroline Cantley et al. Document Migration
28 Mar 2005
T050033-x0 Advanced LIGO SUS ETM Controls Prototype: The Question of Mass To Mass Separation Within the Catcher / Assembly Rig Caroline Cantley et al. Document Migration
28 Mar 2005
G050108-x0 Development of CO2 laser machine for pulling & welding of silica fibres and ribbons - LSC Meeting, March 20-23, 2005, Livingston LA Caroline Cantley Document Migration
25 Mar 2005
G050107-x0 Update on Advanced LIGO Suspension Design and Technology Development Towards the Quad Noise Prototype - LSC Meeting, March 20-23, 2005, Livingston LA Caroline Cantley Document Migration
25 Mar 2005
T050031-x0 Advanced LIGO SUS Quad Suspension Mass Bending Calculator & Notes Caroline Cantley et al. Document Migration
10 Mar 2005
T050010-x0 Monolithic Suspension Workshop (Glasgow Jan 2005): Minutes & Actions Helena Armandula et al. Document Migration
15 Feb 2005
T040214-x0 Advanced LIGO Parameters for Current ETM/ITM Main Chain Noise Prototype Design Helena Armandula et al. Document Migration
14 Dec 2004
T040080-x0 Advanced LIGO Catcher Jig Product Design Specification for the ETM Controls Prototype Caroline Cantley et al. Document Migration
14 Sep 2004
T040084-x0 Advanced LIGO ETM Controls Prototype Catcher Jig: Design Brief Caroline Cantley et al. Document Migration
14 Sep 2004
D040183-x0 ADVANCED LIGO SUS ETM CPTYPE FLEXURE POINT OF A SPRING STEEL WIRE Caroline Cantley et al. Document Migration
08 Sep 2004
G040433-x0 Development of a CO2 laser machine for pulling and welding of silica fibres and ribbons (GR17 presentation) J Bogenstahl et al. Document Migration
02 Sep 2004
T040016-x0 ADVANCED LIGO SUS QUAD ETM CONTROLS PROTOTYPE TASK SUMMARY Caroline Cantley et al. Document Migration
26 Aug 2004
E040108-x0 Recommendation of a design for OSEM sensors Stuart Aston et al. Document Migration
01 Apr 2004
G040054-x0 Advanced LIGO Suspension Status - LSC Meeting, March 15 - 18th, Livingston, LA Caroline Cantley Document Migration
25 Mar 2004
G040059-x0 Blade committee notes - LSC Meeting, March 15 - 18th, Livingston, LA Caroline Cantley et al. Document Migration
17 Mar 2004
G040058-x0 Some recent work on blade performance - LSC Meeting, March 15 - 18th, Livingston, LA Caroline Cantley et al. Document Migration
17 Mar 2004
G030534-x0 Modal Testing Facility for Advanced LIGO Caroline Cantley Document Migration
29 Oct 2003
T030211-x0 Advanced LIGO SUS ETM Summary of Work for a Blade Test Facility Caroline Cantley et al. Document Migration
09 Oct 2003
T030242-x0 Advanced LIGO SUS Summary of Cantilever Blade Wire Clamp Testing Caroline Cantley et al. Document Migration
09 Oct 2003
G030483-x0 Development Issues for the UK Advanced LIGO Project - LSC Meeting, August 18th - 21st, Hannover, Germany Caroline Cantley Document Migration
09 Sep 2003
G030038-x0 Update on Suspension Activities for Advanced LIGO - LSC Meeting, March 17th - 20th, Livingston, LA Caroline Cantley Document Migration
26 Mar 2003
T920022-x0 Active Control of a Balanced Two-Stage Pendulum Vibration Isolation System and Its Application to Laser Interferometric Gravity Wave Detectors Caroline Cantley et al. Document Migration
14 Oct 2002

Number of documents found: 59


DCC Version 3.4.2, contact DCC Help