M950046-v2 |
LIGO Laboratory System Safety Plan |
David Nolting et al. |
Safety
|
10 Nov 2014 |
M0900136-v2 |
Restricted Work Alone Policy |
Charles Taylor et al. |
Policies
Safety
|
23 Jun 2018 |
M080401-v10 |
LIGO Contractor/Vendor Safety Requirements & Procurement Criteria |
Danny Sellers |
Policies
Safety
|
25 Jan 2024 |
M1300358-v2 |
LLO Beam Tube Enclosure Entry and Egress Procedure |
David Nolting et al. |
Safety
|
25 Sep 2019 |
F080010-v2 |
LIGO Contractor Safety Evaluation Form |
Danny Sellers |
Safety
Policies
|
25 May 2021 |
E1900023-v2 |
aLIGO, SEI, HAM ISI Large Actuator Bobbin Assembly Procedure |
Don Griffith et al. |
A+
|
12 Dec 2019 |
L1400202-v1 |
Design Review Report for the Test Mass Discharging System (TMDS) |
Scott McCormick et al. |
Reviews
System Engineering
Vacuum
Final Design
Reports
|
13 Jan 2015 |
T1000425-x0 |
Hazard analysis for use of First Contact(TM) Optical Cleaner |
David Nolting et al. |
Core Optics
Safety
|
19 Aug 2014 |
T1000424-v1 |
First Contact Application - TES Air Monitoring Report - 6.2.10 |
David Nolting et al. |
Safety
|
19 Aug 2014 |
E1200659-v2 |
AOS SLC BS Elliptical Baffle Install Hazard Analysis |
Michael Smith et al. |
Safety
Auxiliary Optics
Final Design
|
15 Feb 2014 |
L1000357-v3 |
Advanced LIGO Review Committee Report: Monolithic Stage of the Quad Suspension |
Douglas Cook et al. |
Suspensions
Reviews
Final Design
|
05 Feb 2014 |
T1200133-v1 |
Hazard Analysis Severity and Probability Codes |
David Nolting et al. |
Safety
|
23 Apr 2013 |
G1200361-v1 |
aLIGO Safety Performance Presentation - aLIGO NSF Review April 2012 |
David Nolting et al. |
Safety
|
05 Apr 2012 |
L1000094-v1 |
Design Review for ISC demodulator and in-vacuum quad detector |
Robert Schofield et al. |
Sensing and Control
|
05 Mar 2010 |
T0900327-v1 |
Review Report Interferometer Sensing and Control Preliminary Design |
Robert Schofield et al. |
Preliminary Design
Sensing and Control
|
12 Aug 2009 |