LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G2402125-v2 |
Environmental noise lessons from LIGO for CE site selection |
Robert Schofield |
Detector
|
14 Oct 2024 |
G2301888-v2 |
September 2023 PEM Update |
Robert Schofield et al. |
Detector
|
12 Sep 2023 |
T2300353-v1 |
Site Selection and Facilities Design excerpt from the GW Handbook |
Robert Schofield |
Preliminary Design
Observatory Facilities
|
06 Sep 2023 |
E1400144-x0 |
aLIGO,DAQ,PEM |
Robert Schofield et al. |
Integration
Data Acquisition System
|
19 May 2023 |
G2101943-v1 |
September 2021 scattering mitigation and PEM update |
Robert Schofield et al. |
Auxiliary Optics
|
06 Sep 2021 |
G2101396-v1 |
University of Oregon GWANW 2021 |
Benjamin Farr et al. |
Data Analysis
Detector
|
29 Jun 2021 |
P2000343-v7 |
Environmental Noise in Advanced LIGO Detectors |
Philippe Nguyen et al. |
Detector Characterization
|
28 Jun 2021 |
T2100221-v2 |
H1 NCAL Prototype: PEM Coupling |
Timesh Mistry et al. |
Commissioning
Detector Characterization
|
25 Jun 2021 |
D1300672-v1 |
PEM Patch Panel |
Terra Hardwick et al. |
Final Design
Sensing and Control
|
04 Jan 2021 |
G1000923-v1 |
Why LIGO's range is limited by ground motion: the likely source of upconversion |
Robert Schofield |
Suspensions
Meeting
Detector Characterization
|
10 Dec 2020 |
G1101046-v1 |
Early work to reduce aLIGO environmental coupling |
Robert Schofield |
Meeting
|
03 Dec 2020 |
T2000634-v1 |
Intersite Magnetic Signals from Lightning |
Matthew Ball et al. |
Detector Characterization
|
09 Nov 2020 |
T1800508-v2 |
PEM vetting report for GW170817 |
Robert Schofield et al. |
Detector
|
12 Dec 2019 |
T1800506-v2 |
Lightning, LIGO, and GW150914 |
Robert Schofield |
Detector
|
12 Dec 2019 |
T1800505-v2 |
PEM Vetting Report For GW150914 |
Robert Schofield et al. |
Detector
|
12 Dec 2019 |
G1901683-v2 |
August 2019 PEM update and new techniques for localizing scattering |
Robert Schofield et al. |
Detector
|
02 Sep 2019 |
G1901041-v4 |
Pre-O3 PEM injections |
Robert Schofield et al. |
Detector
|
29 May 2019 |
T1800507-v1 |
Email thread on potential geomagnetic artifacts and audio-band electric field attenuation |
Robert Schofield |
Detector
|
26 Nov 2018 |
G1801522-v2 |
PEM update, August 2018, DetChar f2f |
Robert Schofield |
Detector
|
30 Jul 2018 |
L1800095-v1 |
TRB Report on the Stray Light Control Shroud for the Output Faraday Isolator (OFI) |
Dennis Coyne et al. |
Reports
Upgrades
Auxiliary Optics
Reviews
System Engineering
|
12 Jun 2018 |
T1600387-v1 |
Environmental Monitoring: Coupling Function Calculator |
Julia Kruk et al. |
Detector Characterization
|
04 Jan 2017 |
P1500278-v4 |
Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor |
Krishna Venkateswara et al. |
Basic R&D
Seismic Isolation
|
14 Dec 2016 |
P080073-v1 |
Requirements for a Ground Rotation Sensor to Improve Advanced LIGO |
Robert Schofield et al. |
Seismic Isolation
Basic R&D
Requirements
|
13 Jun 2016 |
G1600545-v1 |
PEM update, March 2016 |
Robert Schofield |
Detector
|
13 Mar 2016 |
L1500103-v1 |
Technical Review Board (TRB) report: Should We Insulate the Beamtube? |
Dennis Coyne et al. |
Technical Review Board
Vacuum
System Engineering
|
15 Dec 2015 |
T1500301-v1 |
Determining the Effect of Acoustic Coupling on Advanced LIGO |
Katie Banowetz et al. |
Basic R&D
|
22 Nov 2015 |
P1000112-v27 |
Searching for stochastic gravitational waves using data from the two co-located LIGO Hanford detectors |
Shivaraj Kandhasamy et al. |
Stochastic
|
20 Aug 2015 |
T1200221-v5 |
aLIGO PEM System Upgrade |
Robert Schofield et al. |
Upgrades
|
18 Aug 2015 |
G1500996-v2 |
Current status of PEM, pre-O1 |
Robert Schofield |
Detector
|
31 Jul 2015 |
E1300806-v38 |
Stray Light Control and Viewport Fabrication Acceptance Punch List |
Robert Schofield et al. |
Auxiliary Optics
|
17 Apr 2015 |
E1500016-v1 |
ECR: Move PEM H0,L0 channels to H1,L1 |
Robert Schofield et al. |
Data and Computing
|
08 Apr 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Basic R&D
Sensing and Control
Integration
|
05 Mar 2015 |
T1400648-v1 |
Instructions for switching the LHO PSL between science and commissioning modes |
Robert Schofield et al. |
Detector
|
08 Oct 2014 |
P1400210-v2 |
Magnetism and Advanced LIGO |
Christina Daniel et al. |
Basic R&D
Installation
|
06 Oct 2014 |
G1400976-v1 |
PEM update, August 2014 |
Robert Schofield |
Meeting
|
24 Aug 2014 |
G990079-x0 |
Detector Characterization: Simulated Data Sets - LSC Meeting 5 Presentation, 19 July 1999, Stanford University |
Lee Samuel Finn et al. |
Document Migration
|
23 May 2014 |
G080101-x0 |
Bringing the Veto Saga to an End - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 (Burst Group Face-to-Face Meeting) |
Erik Katsavounidis et al. |
Document Migration
|
20 May 2014 |
G1301067-v1 |
PEM update, September 2013 |
Robert Schofield |
Observatory Facilities
|
07 Mar 2014 |
G1200282-v2 |
Update on PEM - related activities: March 2012 |
Robert Schofield |
Detector Characterization
|
02 Dec 2013 |
T1300697-v1 |
PEM Installation Procedures |
Robert Schofield et al. |
Installation
|
16 Aug 2013 |
D1300674-x0 |
PEM IOT1 Patch Panel |
Terra Hardwick et al. |
Sensing and Control
Final Design
|
05 Aug 2013 |
D1300673-x0 |
PEM IOT1 Patch Panel |
Terra Hardwick et al. |
Sensing and Control
Final Design
|
05 Aug 2013 |
E1300411-v1 |
ECR for PEM upgrade |
Robert Schofield |
Upgrades
|
19 Jun 2013 |
G1300624-v1 |
Identifying and mitigating scattered light noise in LIGO - GEO scattering workshop |
Robert Schofield |
Commissioning
|
10 Jun 2013 |
G1300300-v1 |
Investigations of magnetic coupling to the quads |
Robert Schofield |
Core Optics
|
18 Mar 2013 |
T1000334-v2 |
Review Report Interferometer Sensing and Control Final Design |
Robert Schofield et al. |
Sensing and Control
|
17 Feb 2013 |
G1200969-v1 |
Update on PEM-related activities: September 2012 |
Robert Schofield et al. |
Meeting
|
11 Sep 2012 |
T1200172-v2 |
Installation and testing of L1 PSL table legs |
Riccardo DeSalvo et al. |
Laser Systems
Commissioning
|
15 Apr 2012 |
T1200171-v1 |
Status of acoustic isolation of the H2 PSL enclosure |
Robert Schofield |
System Test
|
13 Apr 2012 |
T0900239-v1 |
AOS: Optical Lever and Viewport Conceptual Design |
Robert Schofield et al. |
Auxiliary Optics
|
19 May 2009 |
G1100330-v1 |
Environmental noise - related lessons from S6 |
Robert Schofield et al. |
Meeting
|
22 Mar 2011 |
G1000922-x0 |
. |
Robert Schofield |
Meeting
Detector Characterization
Suspensions
|
21 Mar 2011 |
G1000286-v1 |
Line-related commissioning and some upconversion observations |
Robert Schofield et al. |
Detector Characterization
|
14 Mar 2010 |
L1000094-v1 |
Design Review for ISC demodulator and in-vacuum quad detector |
Robert Schofield et al. |
Sensing and Control
|
05 Mar 2010 |
P080016-x0 |
The LSC glitch group: monitoring noise transients during the fifth LIGO science run |
Robert Schofield et al. |
Document Migration
Public relations
|
22 Oct 2009 |
T0900327-v1 |
Review Report Interferometer Sensing and Control Preliminary Design |
Robert Schofield et al. |
Preliminary Design
Sensing and Control
|
12 Aug 2009 |
G0900197-v1 |
Mitigation of environmental coupling for eLIGO |
Robert Schofield |
Commissioning
|
16 Mar 2009 |
T080092-x0 |
Review Report Interferometer Sensing and Control Conceptual Design |
Hartmut Grote et al. |
Document Migration
|
09 May 2008 |
G080246-x0 |
Activities of the LSC glitch group during S5 |
Lindy Blackburn et al. |
Document Migration
|
11 Apr 2008 |
G080207-x0 |
Detector Noise Characterization with the Hilbert-Huang Transform - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Jordan Camp et al. |
Document Migration
|
04 Apr 2008 |
G080209-x0 |
Environmental Coupling During S5 - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Robert Schofield |
Document Migration
|
04 Apr 2008 |
G070581-x0 |
S5 Environmental Disturbances: March to July `07 - LIGO/Virgo Collaborations Meeting, July 23-26, 2007, MIT |
Robert Schofield |
Document Migration
|
27 Sep 2007 |
G070133-x0 |
S5 Environmental Disturbances: To March 07 - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Robert Schofield |
Document Migration
|
02 Apr 2007 |
G060474-x0 |
S5 Environmental Disturbances: August ‘06 - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Laura Cadonati et al. |
Document Migration
|
18 Aug 2006 |
G060147-x0 |
Inter-Site Magnetic Correlations |
Shourov Chatterji et al. |
Document Migration
|
18 Apr 2006 |
G060152-x0 |
Environmental Disturbances: Early S5 and S4 - LSC Meeting, March 19-22, 2006, Hanford WA |
Rana Adhikari et al. |
Document Migration
|
14 Apr 2006 |
G050617-x0 |
Environmental Disturbances: S4 and Pre-S5 |
Robert Schofield |
Document Migration
|
21 Nov 2005 |
G050387-x0 |
Spectral Line Catalogue Status - LSC Meeting, August 14th - 17th, Hanford WA |
Philip Charlton et al. |
Document Migration
|
18 Aug 2005 |
T050087-x0 |
Magnetic Field Measurement |
Robert Schofield |
Document Migration
|
27 May 2005 |
G050217-x0 |
S4 Environmental Disturbances - LSC Meeting, March 20-23, 2005, Livingston LA |
Douglas Cook et al. |
Document Migration
|
28 Mar 2005 |
G040522-x0 |
Veto Studies for LIGO Binary Inspiral Triggers |
Hans Bantilan et al. |
Document Migration
|
17 Dec 2004 |
G040391-x0 |
Progress Since March on S3 Environmental Disturbances - LSC Meeting, August 16th-19th, 2004, Hanford WA |
Nathan Hindman et al. |
Document Migration
|
19 Aug 2004 |
G040159-x0 |
S3 ENVIRONMENTAL DISTURBANCIES - ACOUSTIC MITIGATION UPDATE, GRAVEL TRUCK BURSTS, DUST BURSTS AND PULSED HEATERS - LSC Meeting, March 15 - 18th, Livingston, LA |
Robert Schofield |
Document Migration
|
18 Mar 2004 |
G030555-x0 |
Vibration Reduction in ISC Periscope - LSC Meeting, November 10th - 13th, Hanford WA |
Peter Fritschel et al. |
Document Migration
|
18 Nov 2003 |
G030640-x0 |
Acoustic Mitigation Status for S3 - LSC Meeting, November 10th - 13th, Hanford WA |
Douglas Cook et al. |
Document Migration
|
14 Nov 2003 |
G030641-x0 |
S2 Intersite Environmental Transients Investigation - LSC Meeting, November 10th - 13th, Hanford WA |
Robert Schofield |
Document Migration
|
14 Nov 2003 |
G030496-x0 |
Acoustic Mitigation Progress - LSC Meeting, August 18th - 21st, Hannover, Germany |
Douglas Cook et al. |
Document Migration
|
10 Sep 2003 |
G030329-x0 |
Accoustic Mitigation Team Progress Report |
Douglas Cook et al. |
Document Migration
|
09 Jul 2003 |
G030297-x0 |
Measurements of Environmental Coupling to the Gravitational Wave Channel (PEM Injections) |
Aleksandr Ageyev et al. |
Document Migration
|
09 Jul 2003 |
G030330-x0 |
Progress on S1 Intersite Transients Study |
Robert Schofield |
Document Migration
|
09 Jul 2003 |
G020396-x0 |
Environmental Disturbances (Including S1-Stoppers) - LSC Meeting, August 19th - 22nd, Hanford WA |
Betsy Weaver et al. |
Document Migration
|
05 Sep 2002 |
T020104-x0 |
Seismic Measurements at the Stateline Wind Project - And a Prediction of the Seismic Signal that the Proposed Maiden Wind Project Would Produce at LIGO |
Robert Schofield |
Document Migration
|
07 Aug 2002 |
G020047-x0 |
absGlitch: An Absolute Threshold-based Glitch Monitor - LSC Meeting, March 20 - 23, Livingston LA |
Rauha Rahkola et al. |
Document Migration
|
01 Aug 2002 |
G020252-x0 |
Environmental Disturbances, E5, E6 and E7 Investigations - LSC Meeting, March 20 - 23, Livingston LA |
Soma Mukherjee et al. |
Document Migration
|
06 Jun 2002 |
G020254-x0 |
Three Veto Schemes - LSC Meeting, March 20 - 23, Livingston LA |
Rauha Rahkola et al. |
Document Migration
|
06 Jun 2002 |
G020253-x0 |
Intersite Environmental Transients, E5, E6 and E7 Investigations - LSC Meeting, March 20 - 23, Livingston LA |
Gabriela Gonzalez et al. |
Document Migration
|
06 Jun 2002 |
G020245-x0 |
60 Hz Mains Correlations for the U.S. Power Grids - The Aspen Winter Conference on Gravitational Waves, (GWDAW) at Isola d`Elba, Italia |
Albert Lazzarini et al. |
Document Migration
|
22 May 2002 |
T010101-x0 |
Analysis of the Effects of Long Term Correlations Over Long Baselines Over Narrowband Features in Cross-correlation Measurements |
Albert Lazzarini et al. |
Document Migration
|
27 Feb 2002 |
G010395-x0 |
Environmental Disturbances: E3 and E4 Investigations |
Masahiro Ito et al. |
Document Migration
|
13 Nov 2001 |
G010396-x0 |
Intersite Environmental Correlations: E3 and E4 Investigations, Part 2: Bursts |
Nelson Christensen et al. |
Document Migration
|
13 Nov 2001 |
G010286-x0 |
E3/E4 PEM Correlations, Part 1 - LSC Meeting August 13 - 16, Hanford WA |
Nelson Christensen et al. |
Document Migration
|
22 Aug 2001 |
G010290-x0 |
Detector Characterization; Triggers, Code Infrastructure; Followup Analysis for the UL Groups - LSC Meeting August 13 - 16, Hanford WA |
Nelson Christensen et al. |
Document Migration
|
15 Aug 2001 |
G010159-x0 |
The LIGO E2 Investigation of Non-Stationary Noise - LSC Meeting March 14 -17 2001 Livingston, LA |
Edward Daw et al. |
Document Migration
|
22 Mar 2001 |
G000262-x0 |
Source and Propagation of Predominant 1-50 HZ Seismic Signal from Off-Site at LIGO-Hanford - LSC Meeting at Hanford, August 15-17, 2000 |
Gabriela Gonzalez et al. |
Document Migration
|
20 Sep 2000 |
G000088-x0 |
Some Effects of Earthquakes, Temperature, Wind Storms and Barometric Pressure on the Interferometer at Hanford |
James Brau et al. |
Document Migration
|
11 May 2000 |