Document List by Author

Michael Smith of LIGO - California Institute of Technology is listed as an author on the following documents:
(List events moderated by Michael Smith)

LIGO-Number Title Author(s) Topic(s) Last Updated
E0900347-v9 ETM Telescope Primary Parabolic Mirror, ADLIGO Michael Smith et al. Final Design
Auxiliary Optics
08 Feb 2012
P060007-x0 Measurement of Optical Response of a Detuned Resonant Sideband Extraction Interferometer Benjamin Abbott et al. Document Migration
11 Nov 2021
E1300345-x0 Repository for ACB Baffle Supporting Analyses/models Michael Smith Modelling
Auxiliary Optics
29 Apr 2020
E1000116-v2 Output Faraday Rotator Component Specification Michael Smith Final Design
Auxiliary Optics
23 May 2019
T070061-v1 AOS: Stray Light Control (SLC) Design Requirements Michael Smith et al. Document Migration
03 Jan 2011
T1100445-v2 AOS SLC: Signal Recycling Cavity Baffles Final Design Michael Smith et al. Final Design
Auxiliary Optics
13 Oct 2011
E1300298-x0 SLC & VP Installation procedures Michael Smith Installation
21 Mar 2018
T060083-v1 Auxiliary Optics Support System Conceptual Design Document, Vol. 1: Thermal Compensation System Phil Willems Conceptual Design
Reviews
Auxiliary Optics
25 Jan 2018
E1300428-x0 Repository for Output Faraday Isolator Test Results Michael Smith Subsystem Test
Auxiliary Optics
25 Dec 2017
E1300577-v7 SLC ITM/ ETM Manifold Cryopump Baffle Assembly and Installation Document Michael Smith et al. Assembly
Installation
Auxiliary Optics
10 May 2017
T1000746-v1 Viewports Subsystem Final Design Document Michael Smith et al. Final Design
Auxiliary Optics
13 Mar 2011
T1300353-v1 TMS: Telescope Testing Facility Alignment Procedure Virginio Sannibale et al. Subsystem Test
Auxiliary Optics
04 Apr 2017
E1300341-x0 Repository for OFI supporting analyses/models Michael Smith Modelling
Auxiliary Optics
07 Feb 2017
T1200313-v3 BS Elliptical Baffle Final Design Michael Smith et al. Final Design
Auxiliary Optics
15 Dec 2016
T1000747-v4 Arm Cavity Baffle Final Design (SLC) Michael Smith et al. Final Design
Auxiliary Optics
14 Dec 2016
T1100165-v2 AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR Lisa Austin et al. Final Design
Auxiliary Optics
14 Dec 2016
E1300319-x0 Arm Cavity Baffle (ACB) supporting analyses/models Michael Smith Final Design
Auxiliary Optics
14 Dec 2016
E1100718-v8 Mode Cleaner Tube Baffle Assembly and Installation Procedure Lisa Austin et al. Assembly
Installation
Auxiliary Optics
06 Dec 2016
D0902216-v8 Advanced LIGO L1 Optical Layout, ZEMAX Michael Smith et al. Final Design
System Engineering
28 Sep 2016
T1000181-v1 AOS: Stray Light Control (SLC)-- Output Faraday Isolator Final Design Michael Smith et al. Final Design
Auxiliary Optics
09 Sep 2016
E1300427-x0 Repository for ITM Elliptical Baffle Test Results Michael Smith Subsystem Test
Auxiliary Optics
08 Mar 2016
E1300175-v1 Gaussian beam Sizes in Signal Recycling Cavity Michael Smith Auxiliary Optics
27 Oct 2015
T000092-v4 Auxiliary Optics Support System Design Requirements Document, Vol. 1: Thermal Compensation System Michael Smith et al. Requirements
Reviews
Auxiliary Optics
22 Sep 2015
E1300390-v3 Align/Install Output Faraday Isolator LHO Test Michael Smith Subsystem Test
Auxiliary Optics
29 Jul 2015
T1100292-v6 (obsolete) Viewport Source List Michael Smith Final Design
14 Apr 2015
L1200291-v5 TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions Calum Torrie et al. Installation
System Engineering
11 Mar 2015
T080063-x0 BRDF and Reflectivity Properties of Black Glass Beam Dumps and Baffles Michael Smith Document Migration
04 Feb 2015
E1300447-v1 TEST-VP LHO Michael Smith Subsystem Test
Auxiliary Optics
02 Feb 2015
T1000311-v7 aLIGO TransMonSUS Assembly & Installation Hazards Analysis Ken Mailand et al. Final Design
Safety
Auxiliary Optics
21 Jan 2015
D0900446-v12 Advanced LIGO Transmon Zemax Sam Waldman et al. Sensing and Control
Final Design
Auxiliary Optics
19 Jan 2015
E1300438-x0 Repository for Viewport Test Results Michael Smith Subsystem Test
Auxiliary Optics
22 Nov 2014
E1300338-x0 Repository for Signal Recycling Cavity Baffles Test Results Michael Smith Subsystem Test
Auxiliary Optics
22 Nov 2014
E1300426-x0 Repository for BS Elliptical Baffle Test Results Michael Smith Subsystem Test
Auxiliary Optics
20 Nov 2014
E1300346-v2 Repository for ACB Baffle Test Results Michael Smith Subsystem Test
Auxiliary Optics
20 Nov 2014
E1201012-v8 TransMonSUS Assembly & Installation Procedure Ken Mailand et al. Sensing and Control
Final Design
Auxiliary Optics
22 Oct 2014
E1300212-v2 SLC Acceptance Documentation Michael Smith Auxiliary Optics
30 Sep 2014
T070125-x0 Advanced LIGO Photon Calibrator Design Requirements Document Michael Smith et al. Document Migration
23 Jun 2014
E1300389-v3 Align/Install Output Faraday Isolator LLO Test Michael Smith Subsystem Test
Auxiliary Optics
16 Jun 2014
E980326-x0 Document Change Notice Michael Smith Document Migration
16 May 2014
E980325-x0 Document Change Notice Michael Smith Document Migration
16 May 2014
E980324-x0 Document Change Notice Michael Smith Document Migration
16 May 2014
E980323-x0 Document Change Notice Michael Smith Document Migration
16 May 2014
E1300376-v1 Install ACB LLO BSC5 Test Michael Smith Subsystem Test
Auxiliary Optics
10 Apr 2014
E1300375-v1 Install ACB LLO BSC4 Test Michael Smith Subsystem Test
Auxiliary Optics
08 Apr 2014
E1100491-v6 SLC Mode Cleaner Tube Baffle Install Hazard Analysis Michael Smith et al. Safety
Auxiliary Optics
20 Feb 2014
E1000890-v8 SLC Arm Cavity Baffle Install Hazard Analysis Michael Smith et al. Final Design
Installation
Safety
Auxiliary Optics
20 Feb 2014
E1100984-v8 SLC Signal Recycling Cavity Baffle Install Hazard Analysis Michael Smith et al. Safety
Auxiliary Optics
20 Feb 2014
E1300283-v3 OFI Assembly & Installation Hazard Analysis Michael Smith Installation
Safety
Auxiliary Optics
18 Feb 2014
E1200659-v2 AOS SLC BS Elliptical Baffle Install Hazard Analysis Michael Smith et al. Final Design
Safety
Auxiliary Optics
15 Feb 2014
E1300351-x0 Repository for OFI Design Drawings, Interfaces, etc. Michael Smith Final Design
Auxiliary Optics
13 Dec 2013
E1100607-v5 SLC ITM Manifold/Cryopump Baffle Assembly and Installation Document (OBSOLETE) Michael Smith et al. Assembly
Installation
Auxiliary Optics
09 Dec 2013
E1300333-x0 Repository for Viewport Installation Procedure Documents Michael Smith Installation
20 Nov 2013
E1300043-v3 OFI Balance Weights and Locations Michael Smith Assembly
Fabrication
Auxiliary Optics
11 Oct 2013
E1100867-v17 Advanced LIGO AOS ITM Arm Cavity Baffle Assembly Procedure Stephany Foley et al. Assembly
Auxiliary Optics
24 Sep 2013
E1300302-v9 SLC/VP Acceptance Check List Michael Smith Reviews
18 Sep 2013
E1300336-x0 Repository for Signal Recycling Cavity Baffle Supporting Analyses/models Michael Smith Modelling
Auxiliary Optics
18 Sep 2013
E1300342-x0 Repository for Manifold/Cryopump & Mode Cleaner Baffles Supporting Analyses/models Michael Smith Modelling
18 Sep 2013
E1300343-x0 Repository for ITM Elliptical Baffle Supporting Analyses/models Michael Smith Modelling
Auxiliary Optics
18 Sep 2013
E1300344-x0 Repository for BS Elliptical Baffle Supporting Analyses/models Michael Smith Modelling
18 Sep 2013
T1300831-v1 SR2 Scraper Baffle sketch Michael Smith Conceptual Design
Auxiliary Optics
18 Sep 2013
T1300830-v1 MC tube baffle beam clearance Michael Smith Modelling
Auxiliary Optics
18 Sep 2013
T1300829-v1 ACB ETM wide angle scatter power summary Michael Smith Modelling
Auxiliary Optics
18 Sep 2013
T1300825-v1 ACB shelf length Michael Smith Installation
Auxiliary Optics
18 Sep 2013
T1300828-v1 ALS-photodetector on ACB Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300827-v1 ACB shift with target Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300826-v1 Work Sheet_ thin PD wall Michael Smith Fabrication
Auxiliary Optics
17 Sep 2013
T1300824-v1 wide angle scatter_ETMX_H1_power Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300823-v1 wide angle scatter_ITMX_H1_power Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300821-v1 BS elliptical baffle-3 Model Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300816-v1 ITM Elllip Baf scatter overlap integral Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300820-x0 Riley_mrs_10-31-07 - BRDF SURF doc Michael Smith Education, Outreach
Auxiliary Optics
17 Sep 2013
T1300819-v1 Dan Riley BRDF measurement - final1 Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300818-v1 Riley-Smith BRDF measurement - final1_mrs Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300817-v1 aLIGO TCS CO2P BSC2 BAFFLE ASSEMBLY_Three Concepts Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300815-v1 Fastener list Manifold-cryo baf Michael Smith Fabrication
Auxiliary Optics
17 Sep 2013
T1300814-v1 CPBS.Proto.Transmissibility.Total.Z.01 Michael Smith Subsystem Test
Auxiliary Optics
17 Sep 2013
T1300813-v1 CPBS.Proto.Transmissibility.Total.Y.01-02 Michael Smith Subsystem Test
Auxiliary Optics
17 Sep 2013
T1300812-v1 Manifold-cryo-baf_Blades_Weight_Req Michael Smith Incoming Inspection
Auxiliary Optics
17 Sep 2013
T1300811-v1 Manifold-Cryo_baffle scatter ETM-annulus Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300810-v1 MC Tube Baffle Scatter Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300809-v1 MC Tube Baf Circularity Measurements Michael Smith Installation
Auxiliary Optics
17 Sep 2013
T1300808-v1 SR2 AR Baf_Hartmann Scraper Baf_revised sketch Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300807-v1 HAM-BD heights Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300806-v1 SR Cavity Baf scatter overlap_integral Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300805-v1 Scattering from SRM AR Baf1_overlap integral Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300804-v1 SR Cavity Size Summary Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300803-v1 Signal recycling cavity beam parameters Michael Smith Modelling
Auxiliary Optics
17 Sep 2013
T1300801-v1 SRM AR BAF SPACER HEIGHT Michael Smith Modelling
Auxiliary Optics
16 Sep 2013
T1300800-v1 HAM SCRAPER BAF SPACER HEIGHT Michael Smith Modelling
Auxiliary Optics
16 Sep 2013
T1300799-v1 SR3 HR BAFFLE CHARACTERISTICS Michael Smith Final Design
Auxiliary Optics
16 Sep 2013
T1300798-v1 beam size at SR2 baffle Michael Smith Modelling
Auxiliary Optics
16 Sep 2013
T1300795-v1 Squeezer BS deviation angle Michael Smith Final Design
Auxiliary Optics
16 Sep 2013
T1300794-v1 OFI blade matching light table Michael Smith Final Design
Auxiliary Optics
16 Sep 2013
T1300793-v1 OFI SPACER HEIGHT Michael Smith Final Design
Auxiliary Optics
16 Sep 2013
T1300791-v1 OFI glint Michael Smith Final Design
Auxiliary Optics
16 Sep 2013
T1300790-v1 _iLIGO_OFI data Michael Smith Subsystem Test
Auxiliary Optics
16 Sep 2013
T1300789-v1 OFI Wedge Prism Reflectance Data Michael Smith Incoming Inspection
Auxiliary Optics
16 Sep 2013
T1300788-v1 Cryo-Pump Baffle porcelainized steel chipping Michael Smith Fabrication
Auxiliary Optics
16 Sep 2013
T1300787-v1 Cryo-baf B-K measurement Michael Smith Installation
Auxiliary Optics
16 Sep 2013
T1300699-v1 ACB scatter various materials Michael Smith Upgrades
Auxiliary Optics
16 Sep 2013
T1300700-v1 ACB DLC coating on SS Michael Smith Upgrades
Auxiliary Optics
16 Sep 2013
T1300731-v1 Low-scatter Coating for SS Baffles Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300772-v1 CASI BRDF Data, #2 porcelain steel 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300771-v1 Rai Weiss_porcelainized-steel_backscatter_4 Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300770-v1 CASI BRDF Data, #4 oxidized steel 3 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300762-v1 CASI BRDF Data, #4 oxidized steel 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300764-v1 CASI BRDF Data, DLC 57 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300767-v1 CASI BRDF Data, DLC 15 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300768-v1 CASI BRDF Data, DLC 5 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300765-v1 BRDF Multi-AR SS 30 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
T1300766-v1 BRDF Multi-AR SS 10 deg inc Michael Smith Upgrades
Auxiliary Optics
13 Sep 2013
E1300424-v1 Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf Michael Smith Incoming Inspection
Auxiliary Optics
13 Sep 2013
T1200425-v1 Wide Angle Scatter from ETM HR Michael Smith Final Design
Auxiliary Optics
13 Sep 2013
T1100056-v2 Arm Cavity Baffle Edge Scatter Michael Smith Final Design
Auxiliary Optics
13 Sep 2013
T1300340-x0 AOS SLC Signal Recycling Cavity Baffles Assembly and Installation Lisa Austin et al. Assembly
Installation
Auxiliary Optics
13 Sep 2013
T1300719-v1 BRDF Multi-AR SS 57 deg inc Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
T1300718-v1 BRDF Multi-AR SS 15 deg inc Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
T1300717-v1 BRDF Multi-AR SS 3 deg inc Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
T1300716-v1 ACB Multi-AR coating on SS Michael Smith Upgrades
Auxiliary Optics
27 Aug 2013
E1201074-v6 Output Faraday Isolator Assembly and Alignment Procedure Michael Smith Assembly
Auxiliary Optics
26 Aug 2013
T1300713-v1 OFI Balance Weights for heavy table D0900015-v5 Michael Smith Upgrades
Auxiliary Optics
26 Aug 2013
D1300023-v3 Table Balance Weight Centered: 1.0#,0.5#, 0.25# Michael Smith et al. Fabrication
Auxiliary Optics
26 Aug 2013
D1300098-v2 Transport Shim Down Michael Smith Installation
21 Aug 2013
T1300695-v1 BS Elliptical Baffle--Black Glass Design Scattering Analysis Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1300692-v1 BS Elliptical Baffle Scatter_Black Glass Design Michael Smith Upgrades
15 Aug 2013
T1300591-v2 ITM Elliptical Baffle--Black Glass Hybrid Design Scattering Analysis Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1300691-v1 ACB upgrade SS with black glass Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1300689-v2 ITM Elliptical Baffle Scatter_Black Glass Hybrid Michael Smith Upgrades
Auxiliary Optics
15 Aug 2013
T1100446-v4 ITM Elliptical Baffle FD Michael Smith et al. Final Design
Auxiliary Optics
14 Aug 2013
T1000194-v3 OBSOLETE: OFI Assembly & Installation Hazard Analysis Michael Smith Final Design
Safety
Auxiliary Optics
14 Aug 2013
T1300407-v2 BS Elliptical baffle scatter Michael Smith Final Design
Auxiliary Optics
14 Aug 2013
T1300685-v1 ITM Elliptical Baffle Scattered Light Interference Effects Michael Smith Upgrades
Auxiliary Optics
14 Aug 2013
T1300324-v2 ITM Elliptical Baffle Scatter Michael Smith Final Design
Auxiliary Optics
14 Aug 2013
E1300409-v3 Install Manifold/Cryo Baf LHO ETM X Test Michael Smith et al. Subsystem Test
Auxiliary Optics
02 Aug 2013
E1300388-v2 Install Manifold/Cryo Baf LLO ETM Y Test Michael Smith Subsystem Test
Auxiliary Optics
02 Aug 2013
T1300657-v1 Analysis of DLC and Semiconductor AR Coatings for Stainless Steel Baffles Michael Smith Upgrades
Auxiliary Optics
30 Jul 2013
T1300589-x0 ACB--Black Glass Hybrid Baffle Design Scattering Analysis Michael Smith Upgrades
Auxiliary Optics
27 Jun 2013
E1300420-v2 Manifold/cryo baffle Blade Balance Weight Michael Smith et al. Final Design
Auxiliary Optics
21 Jun 2013
D1300588-v1 ACB 1Hole with Black Glass Michael Smith Upgrades
Auxiliary Optics
21 Jun 2013
T1300218-v1 Creep of SLC Maraging Steel Suspension Blades Michael Smith Modelling
Installation
Auxiliary Optics
19 Jun 2013
T1300414-v2 Output Faraday Isolator Blade Creep Michael Smith Modelling
Auxiliary Optics
19 Jun 2013
E1100842-v8 Specification for Oxidation of Polished Mirror (Super #8) Stainless Steel for aLIGO Baffles and Beam Dumps Heidy Kelman et al. Fabrication
Auxiliary Optics
17 Jun 2013
T1300539-v2 BS wide-angle Scatter Displacement Noise Summary Michael Smith Modelling
Auxiliary Optics
14 Jun 2013
E1300437-x0 Repository for Signal Recycling Cavity Baffles Test Results Michael Smith Subsystem Test
Auxiliary Optics
13 Jun 2013
T1300538-v1 BS_wide-angle_scatter_ZEMAX Michael Smith Modelling
Auxiliary Optics
13 Jun 2013
E1300321-v2 BOM viewport summary Michael Smith Final Design
Auxiliary Optics
10 Jun 2013
E1300357-x0 Repository for Viewport SW Vault Files Michael Smith Final Design
Auxiliary Optics
31 May 2013
E1300494-v1 OFI Hammer Test LLO HAM5 Michael Smith et al. Subsystem Test
Auxiliary Optics
28 May 2013
E1100481-v1 Mode Cleaner Tube Baffle & Manifold/Cryopump Baffle Fabrication, Installation, and Test Plan Michael Smith Final Design
Auxiliary Optics
24 May 2013
E1300056-v4 Output Faraday Isolator Installation and Final Alignment Procedure Michael Smith Installation
Auxiliary Optics
24 May 2013
T1300416-v2 OFI Beam Height Michael Smith Final Design
Auxiliary Optics
24 May 2013
T1300411-v1 Manifold/Cryopump Baffle blade spring D902817-v4 Michael Smith Final Design
Auxiliary Optics
17 May 2013
E1300440-v1 TMS Telescope ZEMAX D0900446-v12_ADLIGO-transmon_5-14-13 Michael Smith Final Design
Auxiliary Optics
17 May 2013
D1300476-v1 aLigo TMS Telescope Ray Trace 5-15-13 Ken Mailand et al. Final Design
Auxiliary Optics
17 May 2013
E1300213-x0 aLIGO SLC Testing Documents Michael Smith Auxiliary Optics
15 May 2013
E1300371-x0 Install BS Elliptical Baffle LHO BSC2 X&YTest Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300405-v1 Install ITM Elliptical Baffle LHO BSC2 X&Y Test Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300381-v1 Install ITM Elliptical Baffle LLO BSC2 X&Y Test Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300368-v1 Install BS Elliptical Baffle LLO BSC2 X&Y Test Michael Smith Incoming Inspection
Auxiliary Optics
15 May 2013
E1300392-v1 Install Signal Recycling Cavity Baffles LLO HAM5 Test Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300394-v1 Install Signal Recycling Cavity Baffles LHO HAM5 Test Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300393-v1 Install Signal Recycling Cavity Baffles LHO HAM4 Test Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300441-v1 Install Signal Recycling Cavity Baffles LLO HAM4 Test Michael Smith Subsystem Test
Auxiliary Optics
15 May 2013
E1300295-x0 SLC & VP Materials and fabrication specification Michael Smith Fabrication
Auxiliary Optics
14 May 2013
E1300300-x0 SLC & VP Safety Michael Smith Safety
Auxiliary Optics
14 May 2013
T1300475-v1 OFI scattering Michael Smith Modelling
Auxiliary Optics
14 May 2013
E1300410-v1 Install Manifold/Cryo Baf LHO ETM Y Test Michael Smith Subsystem Test
Auxiliary Optics
14 May 2013
E1300408-v1 Install Manifold/Cryo Baf LHO ITM Y Test Michael Smith Subsystem Test
Auxiliary Optics
14 May 2013
E1300407-v1 Install Manifold/Cryo Baf LHO ITM X Test Michael Smith Subsystem Test
Auxiliary Optics
14 May 2013
E1300387-v1 Install Manifold/Cryo Baf LLO ETM X Test Michael Smith Subsystem Test
Auxiliary Optics
14 May 2013
E1300386-v1 Install Manifold/Cryo Baf LLO ITM Y Test Michael Smith Subsystem Test
Auxiliary Optics
14 May 2013
E1300385-v1 Install Manifold/Cryo Baf LLO ITM X Test Michael Smith Subsystem Test
Auxiliary Optics
14 May 2013
T1300474-v1 H1 SIGNAL RECYCLING CAVITY beam size_3-11-13 Michael Smith Final Design
Auxiliary Optics
14 May 2013
E1300391-x0 Install Signal Recycling Cavity Baffles LLO HAM4 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300382-x0 Install ITM Elliptical Baffle LLO BSC2 Y Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300380-x0 Install ACB LHO BSC510 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300379-x0 Install ACB LHO BSC9 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300378-x0 Install ACB LHO BSC3 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300377-x0 Install ACB LHO BSC1 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300374-x0 Install ACB LLO BSC3 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300373-x0 Install ACB LLO BSC1 Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
E1300372-x0 Install BS Elliptical Baffle LHO BSC2 Y Test Michael Smith Subsystem Test
Auxiliary Optics
07 May 2013
T080307-v6 Initial Alignment System (IAS) Design Requirements Document (DRD) Michael Smith et al. Final Design
Auxiliary Optics
03 May 2013
E1300356-x0 Repository for Signal Recycling Cavity Baffles SW Vault Files Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300350-x0 Repository for Signal Recycling Cavity Baffles Design Drawings, Interfaces, etc. Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300352-x0 Repository for Manifold/Cryopump & Mode Cleaner Tube Baffle Design Drawings, Interfaces, etc. Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300354-x0 Repository for ITM Elliptical Baffle Design Drawings, Interfaces, etc. Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300348-x0 Repository for ACB Baffle Design Drawings, Interfaces, etc. Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300353-x0 Repository for ITM Elliptical Baffle Design Drawings, Interfaces, etc. Michael Smith Final Design
02 May 2013
E1300349-x0 Repository for Viewport Design Drawings, Interfaces, etc. Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300296-x0 SLC & VP Parts and spares inventoried Michael Smith Installation
02 May 2013
E1300294-x0 SLC & VP Design overview and detailed design documentation Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300270-x0 aLIGO AOS SLC/VP Acceptance Directory Michael Smith Reviews
Auxiliary Optics
02 May 2013
E1300071-v1 ITM Elliptical Baffle Balance Weights Michael Smith Assembly
Installation
02 May 2013
E1300337-x0 Repository for Signal Recycling Cavity Baffles BOM Docs Michael Smith Fabrication
Auxiliary Optics
02 May 2013
E1300347-x0 Repository for Signal Recycling Cavity Baffle Final Design Report Michael Smith Final Design
Auxiliary Optics
02 May 2013
E1300340-x0 Repository for OFI Specification Documents Michael Smith Fabrication
Auxiliary Optics
02 May 2013
E1300334-x0 Repository for Viewport Specification Documents Michael Smith Fabrication
Auxiliary Optics
01 May 2013
E1300339-x0 Signal Recycling Cavity Final Design Docs Michael Smith Final Design
Auxiliary Optics
01 May 2013
E1300335-x0 Repository for Viewport BOM Docs Michael Smith Detector
Fabrication
Auxiliary Optics
01 May 2013
E1300328-x0 Repository for Viewport Assembly Procedure Documents Michael Smith Assembly
01 May 2013
E1000099-v1 SLC and Viewports Installation Plan Michael Smith Installation
01 May 2013
E1101001-v1 Signal Recycling Cavity Baffles Production Plan Michael Smith et al. Final Design
Auxiliary Optics
29 Apr 2013
E1101023-v1 Signal Recycling Cavity Baffles Fabrication and Installation Test Plan Michael Smith et al. Final Design
Auxiliary Optics
29 Apr 2013
T0900269-v2 AOS: Stray Light Control (SLC) Preliminary Design Mohana Mageswaran et al. Preliminary Design
Auxiliary Optics
29 Apr 2013
T1300426-v1 SR3 and SR2 Baffles Hole Edge Scatter Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300423-v1 HAM Scraper Baffle Height Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300417-v1 Extinction Ratio of Output Faraday Isolator vs Input Angle Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300415-v1 Output Faraday Isolator Upper Blade D0900541-v4 Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300412-v1 Manifold-Cryopump Baffle Scatter Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300401-v1 wide angle scatter_BS_L1_power Michael Smith Modelling
Auxiliary Optics
25 Apr 2013
T1300404-v1 ACB scatter Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300424-v1 Scattering Parameters Hartmann Beams Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300422-v1 H1 Hartmann ITM Probe Scatter Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300421-v1 Ghost Beam Scatter in Signal Recycling Cavity Michael Smith Final Design
Auxiliary Optics
25 Apr 2013
T1300418-v1 TFP Polarizer Wedge Deviation OFI Michael Smith Final Design
Auxiliary Optics
24 Apr 2013
T1300413-v1 ETM Manifold/cryopump Baffle Mis-alignment IFO Beam Power Loss Michael Smith Final Design
Auxiliary Optics
24 Apr 2013
T1300408-v1 BS Elliptical Baffle Design Michael Smith Final Design
Auxiliary Optics
24 Apr 2013
T1300406-v1 Wide Angle Scatter from ITM Michael Smith Final Design
Auxiliary Optics
24 Apr 2013
T1300405-v1 ACB edge scatter, porcelain vs oxidized SS Michael Smith Final Design
Auxiliary Optics
24 Apr 2013
T1300403-v1 ETM_wide-angle_scatter_AC_ZEMAX Michael Smith Final Design
Auxiliary Optics
24 Apr 2013
T1300402-v1 ITM Ellip Baf_blade_D1002753-v5 Michael Smith Final Design
Auxiliary Optics
23 Apr 2013
E1300303-v1 ITM Ellip Baf Responses to committe Michael Smith Final Design
Auxiliary Optics
23 Apr 2013
T1300400-v1 arm-cavity-bafffle_blade_D1002608-V4_1-17-13 Michael Smith Final Design
Auxiliary Optics
23 Apr 2013
E1200677-v5 Advanced LIGO AOS ITM Elliptical Baffle Assembly Procedure Lisa Austin et al. Assembly
Auxiliary Optics
23 Apr 2013
E1300293-x0 SLC & VP Requirements documentation Michael Smith Requirements
Auxiliary Optics
23 Apr 2013
T1300351-v1 BRDF measurement_10-15-2007- final1 Michael Smith Subsystem Test
Auxiliary Optics
23 Apr 2013
T1300350-v1 BRDF summary_porcelain vs polish SS Michael Smith Subsystem Test
Auxiliary Optics
23 Apr 2013
T1300348-v1 Box oven BRDF_3-29-12 Michael Smith Subsystem Test
Auxiliary Optics
23 Apr 2013
T1300349-v1 Box oven BRDF summary_3-29-12 Michael Smith Subsystem Test
Auxiliary Optics
23 Apr 2013
T080064-v1 Controlling Light Scatter in Advanced LIGO Dan Riley et al. Document Migration
23 Apr 2013
T1300342-v2 OFI Optical Test Results, LLO Christopher Guido et al. Subsystem Test
Auxiliary Optics
23 Apr 2013
E1300297-x0 SLC & VP Assembly procedures Michael Smith Assembly
Auxiliary Optics
23 Apr 2013
E1300299-x0 SLC & VP Test documents Michael Smith System Test
Auxiliary Optics
22 Apr 2013
E1101018-v5 AOS SLC ITM Elliptical Baffle Assembly & Install Hazard Analysis Michael Smith Final Design
Procurements
Input Optics
Safety
17 Apr 2013
E1300211-x0 aLIGO SLC ACCEPTANCE Michael Smith Auxiliary Optics
25 Mar 2013
E070124-v3 Septum Window Coating Specification Lisa Austin et al. Fabrication
Auxiliary Optics
18 Mar 2013
D0902345-v8 Advanced LIGO H2 Optical Layout, ZEMAX Michael Smith et al. Final Design
System Engineering
28 Feb 2013
E1101022-v1 AOS SLC ITM Elliptical Baffle Test Plan Michael Smith Final Design
Auxiliary Optics
19 Feb 2013
D1300016-v3 Table Balance Weight Offset 3#, 1#, 0.5#, 0.25# Michael Smith et al. Fabrication
Auxiliary Optics
15 Feb 2013
E1101021-v4 AOS SLC ITM Elliptical Baffle Installation Procedure Michael Smith et al. Installation
Auxiliary Optics
14 Feb 2013
E1300070-v2 ACB Balance Weights Michael Smith Assembly
Installation
Auxiliary Optics
18 Jan 2013
T1300043-v1 Arm Cavity Baffle Shift with Alignment Target Michael Smith Installation
Auxiliary Optics
18 Jan 2013
T1000192-v3 Output Faraday Isolator Test Plan Michael Smith Final Design
Auxiliary Optics
15 Jan 2013
D0901920-v13 Advanced LIGO H1 Optical Layout, ZEMAX Michael Smith et al. Final Design
System Engineering
11 Dec 2012
E1201011-x0 TransMonSUS Assembly & Installation Procedure Ken Mailand et al. Sensing and Control
Final Design
Auxiliary Optics
12 Nov 2012
L1200282-v5 ALS Beams @ HAM1 Michael Smith Sensing and Control
Final Design
26 Oct 2012
T1200452-v3 CP & RM Alignment Tolerance Re Scattered Light Michael Smith Core Optics
Suspensions
Installation
Auxiliary Optics
25 Sep 2012
E1200660-v3 AOS SLC BS Elliptical Baffle Installation Procedure Michael Smith et al. Final Design
Auxiliary Optics
02 Aug 2012
E1200662-v2 AOS SLC BS Elliptical Baffle Production Plan Michael Smith et al. Final Design
Auxiliary Optics
30 Jul 2012
E1200661-v1 AOS SLC BS Elliptical Baffle Fabrication, Installation, and Test Plan Michael Smith Final Design
Auxiliary Optics
03 Jul 2012
E000358-x0 Document Change Notice (DCN) Michael Smith Document Migration
28 Jun 2012
E000357-x0 Document Change Notice (DCN) Michael Smith Document Migration
28 Jun 2012
E000328-x0 Document Change Notice (DCN) Michael Smith Document Migration
28 Jun 2012
E990324-x0 Process Traveler Michael Smith Document Migration
28 Jun 2012
E990311-x0 Process Traveler, Rev. 01 Michael Smith Document Migration
28 Jun 2012
E990310-x0 Process Traveler Michael Smith Document Migration
28 Jun 2012
E990309-x0 Process Traveler Michael Smith Document Migration
28 Jun 2012
E990308-x0 Process Traveler Michael Smith Document Migration
28 Jun 2012
E990279-x0 Process Traveler Michael Smith Document Migration
28 Jun 2012
E990237-x0 Document Change Notice (DCN) Michael Smith Document Migration
28 Jun 2012
E990159-x0 Process Traveler Michael Smith Document Migration
28 Jun 2012
E990119-x0 Document Change Notice (DCN) Michael Smith Document Migration
28 Jun 2012
E1101147-v3 OBSOLETE: H1_recycling-cavity-length-0.076wedge Michael Smith Final Design
System Engineering
31 May 2012
E1101146-v3 OBSOLETE: L1_recycling-cavity-length-0.076wedge Michael Smith Final Design
System Engineering
31 May 2012
E1101148-v3 OBSOLETE: H2_recycling-cavity-length-0.076wedge Michael Smith Final Design
System Engineering
31 May 2012
E1100688-v1 OBSOLETE: aLIGO PRM and SRM TIlt Angles Michael Smith Modelling
System Engineering
31 May 2012
T1200257-v1 BS Wide Angle Scatter from HAM3 HAM4 Offset Spool Flanges_Mathcad Michael Smith Auxiliary Optics
23 May 2012
T1200256-v1 HAM3, HAM4 Offset Spool Flange Scattering Michael Smith Auxiliary Optics
23 May 2012
E1200321-v3 Protected Silver High Reflectance Coating Michael Smith Auxiliary Optics
15 May 2012
E0900349-v12 ETM Telescope Secondary Parabolic Mirror, ADLIGO Michael Smith et al. Final Design
Auxiliary Optics
15 May 2012
T080210-v1 AOS: Stray Light Control (SLC) Conceptual Design, Stable Recycling Cavity Michael Smith Document Migration
07 May 2012
T1200188-v1 ETM Transmission Monitor Telescope Performance Michael Smith Conceptual Design
Auxiliary Optics
26 Apr 2012
T1200175-v1 bLCGT TM Wide Angle Baffle, Manifold Baffle, and Beam Tube Baffle Conceptual Design Michael Smith Conceptual Design
Auxiliary Optics
18 Apr 2012
T1200176-v1 bLCGT Recycling Cavity Baffles Conceptual Design Michael Smith Conceptual Design
Auxiliary Optics
18 Apr 2012
E1200391-v1 bLCGT Cavity Lengths Michael Smith Conceptual Design
Auxiliary Optics
18 Apr 2012
G1200154-v8 AOS SLC Stray Light Control and Viewports Lisa Austin et al. NSF
Auxiliary Optics
09 Apr 2012
E1101002-v1 AOS SLC ITM Elliptical Baffle Production Plan Michael Smith Final Design
Auxiliary Optics
26 Mar 2012
T0900304-v2 Advanced LIGO Thermal Compensation System Preliminary Design Michael Smith et al. Preliminary Design
Auxiliary Optics
19 Mar 2012
E1200098-v2 1.0 inch OFI Wedge Prism Specification Michael Smith Auxiliary Optics
11 Mar 2012
D1102016-v1 aLIGO AOS HAM FLAT BEAM DUMP ASSY Michael Smith Final Design
Auxiliary Optics
15 Feb 2012
E1101200-v1 6in VP Type 1 Run Numbers-Serial Numbers Michael Smith Incoming Inspection
15 Dec 2011
E1101199-v1 6in VP Type 1 AR data Michael Smith Incoming Inspection
15 Dec 2011
L1100262-v1 Comments and Questions re: T1100517 HWS Final Design Review_MRS Michael Smith Final Design
Auxiliary Optics
29 Nov 2011
M1100272-x0 RODA to Incorporate In-vacuum Periscopes for ETM HR Video Cameras Michael Smith Sensing and Control
Memorandum
Auxiliary Optics
31 Oct 2011
L1100197-v4 Trade-off: porcelain coating vs. oxidized polished stainless steel for ACB Michael Smith Fabrication
Auxiliary Optics
04 Oct 2011
T1100113-v3 Mitigation Of Wide Angle Scatter From Hr Surface Of The Test Mass with the Arm Cavity Baffle Michael Smith Final Design
Auxiliary Optics
03 Oct 2011
L1100202-v1 Hybrid fabrication of ACB using black glass and oxidized polished stainless steel Michael Smith Final Design
Auxiliary Optics
07 Sep 2011
T1100325-v1 SLC Manifold/Cryopump Baffle Interface Control Document Michael Smith Final Design
Auxiliary Optics
16 Jun 2011
E1100538-x0 SLC Manifold/Cryopump Baffle Interface Control Document Michael Smith Final Design
Auxiliary Optics
14 Jun 2011
T1100258-v4 TMS Telescope Alignment Michael Smith et al. Final Design
Auxiliary Optics
08 Jun 2011
T0900239-v1 AOS: Optical Lever and Viewport Conceptual Design Robert Schofield et al. Auxiliary Optics
19 May 2009
T1100128-v2 aLIGO Beamsplitter coating angular acceptance based on as built wedges GariLynn Billingsley et al. Final Design
Core Optics
16 May 2011
G1100451-v3 AOS SLC Technical Talk aLIGO NSF Review SLC and VP 25-27 April 2011 Michael Smith Meeting
Detector
05 May 2011
E1100050-v5 Responses to AOS SLC ACB FDR Questions Mohana Mageswaran et al. Final Design
Auxiliary Optics
08 Apr 2011
E1100247-v1 Viewport Production Plan Michael Smith Final Design
Auxiliary Optics
13 Mar 2011
E1000892-v1 Arm Cavity Baffle Fabrication, Installation, and Test Plan Michael Smith Final Design
Auxiliary Optics
22 Mar 2011
T1000022-v4 Viewports Subsystem Requirements Document Michael Smith Requirements
Auxiliary Optics
21 Mar 2011
E1000246-v6 6.0 inch Vacuum Viewport Specification Michael Smith et al. Final Design
21 Mar 2011
E1100259-v1 IO Viewports List Michael Smith Final Design
Auxiliary Optics
18 Mar 2011
D1001678-v1 6.0 inch Vacuum Viewport Michael Smith Preliminary Design
Auxiliary Optics
12 Mar 2011
E1100093-x0 DCN 6in Vacuum Viewport Michael Smith Final Design
Detector
12 Mar 2011
E1100245-x0 DCN 6in Vacuum Viewport Michael Smith Final Design
Auxiliary Optics
12 Mar 2011
T1100059-v1 SLC Baffle Heights Michael Smith Final Design
Auxiliary Optics
25 Jan 2011
T980072-v1 COS IR Autocollimator Alignment System Michael Smith Final Design
24 Jan 2011
E1000891-v1 Arm Cavity Baffle Production Plan Michael Smith Final Design
Auxiliary Optics
03 Jan 2011
T1000023-v1 Viewports Subsystem Preliminary Design Document Michael Smith Preliminary Design
Auxiliary Optics
23 Dec 2010
T1000700-v2 Transmon Telescope Mirror Test Procedure Michael Smith et al. Final Design
Subsystem Test
Incoming Inspection
Auxiliary Optics
21 Dec 2010
E1000601-v2 aLIGO Optical Lever Coordinates, H1 Ignacio Romero et al. Final Design
Auxiliary Optics
16 Dec 2010
E1000607-v2 aLIGO Optical Lever Coordinates, H2 Ignacio Romero et al. Final Design
Auxiliary Optics
16 Dec 2010
E1000608-v2 aLIGO Optical Lever Coordinates, L1 Ignacio Romero et al. Final Design
Auxiliary Optics
14 Dec 2010
T1000726-v1 ALS Arm Cavity Baffle Photodetector Array Michael Smith Final Design
Auxiliary Optics
08 Dec 2010
T0900653-v2 MCA TUBE AND MCB TUBE VIEWPORTS Michael Smith Final Design
Vacuum
System Engineering
Auxiliary Optics
03 Nov 2010
E1000439-x0 DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v9 Michael Smith Final Design
Auxiliary Optics
26 Oct 2010
E1000638-x0 DCN ETM Telescope Primary Parabolic Mirror, ADLIGO, v7 Michael Smith Final Design
Auxiliary Optics
26 Oct 2010
T1000275-v2 Transmon SUS Telescope Alignment Procedure Michael Smith Preliminary Design
Auxiliary Optics
22 Oct 2010
E1000519-x0 DCN: Output Faraday Rotator component specification Michael Smith Final Design
Auxiliary Optics
04 Oct 2010
E1000438-x0 DCN ETM Telescope Primary Parabolic Mirror, ADLIGO Michael Smith Final Design
17 Sep 2010
T1000493-v1 Initial Alignment of PR3, ITM, and ETM prior to 1st Light Down the Arms Michael Smith Installation
Auxiliary Optics
14 Sep 2010
E1000409-x0 DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v7 Michael Smith Final Design
14 Sep 2010
E1000322-x0 DCN 6in Vacuum Viewport Michael Smith Final Design
Auxiliary Optics
16 Aug 2010
E1000316-x0 DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v6 Michael Smith Final Design
11 Aug 2010
E1000315-x0 DCN ETM Telescope Primary Parabolic Mirror, ADLIGO Michael Smith Final Design
11 Aug 2010
T1000308-v1 AOS: Stray Light Control (SLC)-- Output Faraday Isolator FDR Responses Michael Smith et al. Final Design
Auxiliary Optics
29 Jun 2010
T0900324-v2 Design Equations for Initially Flat Blade Springs at Arbitrary Mounting Angles Michael Smith Preliminary Design
Auxiliary Optics
24 Jun 2010
E1000201-x0 DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v5 Michael Smith Preliminary Design
Auxiliary Optics
04 Jun 2010
T1000191-v1 Output Faraday Isolator Drawing Package Michael Smith et al. Final Design
Auxiliary Optics
24 May 2010
E1000127-x0 Output Faraday Isolator Installation Procedure Michael Smith Final Design
Auxiliary Optics
12 Apr 2010
E1000117-x0 DCN: Output Faraday Rotator component specification Michael Smith Final Design
Auxiliary Optics
06 Apr 2010
E1000106-x0 DCN ETM Telescope Primary Parabolic Mirror, ADLIGO Michael Smith Final Design
01 Apr 2010
E1000105-x0 DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v4 Michael Smith Preliminary Design
01 Apr 2010
T1000147-v1 TGG Crystal Wedge Angle for aLIGO Output Faraday Isolator Michael Smith Fabrication
Auxiliary Optics
17 Mar 2010
T0900453-v2 ETM-Telescope, Comparison of Off-axis Parabolic Telescope with Spherical Mirror Secondary, or Triplet Lens Michael Smith Preliminary Design
Auxiliary Optics
12 Mar 2010
E1000063-x0 DCN ETM Telescope Primary Parabolic Mirror, ADLIGO Michael Smith Final Design
Detector
03 Mar 2010
M080041-v1 Thickness of PR3 and SR3 and wedge information Norna Robertson Final Design
Suspensions
26 Feb 2010
E980131-v1 Output Faraday Isolator, 20 mm Specification Michael Smith Final Design
Auxiliary Optics
26 Feb 2010
E1000051-x0 DCN output Faraday isolator component specification Michael Smith Final Design
Auxiliary Optics
26 Feb 2010
G1000029-v1 Gravitational Waves and Precision Measurement Michael Smith Meeting
Detector
09 Feb 2010
E1000009-x0 DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO Michael Smith Detector
Preliminary Design
15 Jan 2010
P1000002-v1 Scattered Light Control in Advanced LIGO Michael Smith Auxiliary Optics
07 Jan 2010
P070125-x0 dc readout experiment at the Caltech 40m prototype interferometer Robert Ward et al. Document Migration
Public relations
19 Oct 2009
G0900670-v2 Stray Light Control in Advanced LIGO Michael Smith Auxiliary Optics
07 Aug 2009
T0900334-v2 Response to Stray Light Control PDD Comments Michael Smith Preliminary Design
Auxiliary Optics
09 Jul 2009
T000083-v1 COS Faraday Isolator Pre-alignment Procedure Michael Smith Installation
07 Jul 2009
T080325-v1 Earthquake Stop Scatter Michael Smith Final Design
Suspensions
Auxiliary Optics
16 Apr 2009
T080308-v1 IAS Conceptual Design Document Michael Smith Conceptual Design
Auxiliary Optics
17 Mar 2009
T080277-v1 BS, CP, RM, ITM and ETM Wedge Angle Tolerance Michael Smith Core Optics
24 Feb 2009
T0810032-v1 ETM Transmon Pupil Relay Michael Smith Sensing and Control
Conceptual Design
Auxiliary Optics
24 Feb 2009
T080146-x0 Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review GariLynn Billingsley et al. Document Migration
11 Jun 2008
T080120-x0 Retro-reflection from the ITM and ETM Flats and Barrel in the Arm Cavity Michael Smith Document Migration
04 Jun 2008
T080073-x0 ETM Reaction Mass Optical Irregularity Effect on the ETM Output Spot Size Michael Smith Document Migration
14 Apr 2008
G070025-x0 COMPARISON: ADLIGO UNSTABLE VS STABLE RECYCLING CAVITY OPTICAL LAYOUT Michael Smith Document Migration
11 Apr 2008
E030304-x0 Process Traveler - errant beam baffle LHO 6-2-03 Michael Smith Document Migration
12 Dec 2007
E050336-x0 Document Change Notice (DCN) - OMC Assembly Michael Smith Document Migration
21 Nov 2007
T070248-x0 Advanced LIGO Input Optics Preliminary Design Review Report Dennis Coyne et al. Document Migration
06 Nov 2007
D050379-x0 OUTPUT MODECLEANER ASSY Michael Smith Document Migration
12 Oct 2007
D050366-x0 BEZEL OMC Michael Smith Document Migration
12 Oct 2007
D050369-x0 BODY OMC Michael Smith Document Migration
12 Oct 2007
D050370-x0 COVER OMC Michael Smith Document Migration
12 Oct 2007
G070601-x0 Photon Calibrator DRR & CDR: Response to Reviewer`s Report Michael Smith et al. Document Migration
05 Oct 2007
T070062-x0 AOS: Stray Light Control (SLC) Conceptual Design Michael Smith Document Migration
17 Sep 2007
T070167-x0 Photon Calibrator Conceptual Design Michael Smith et al. Document Migration
16 Aug 2007
T060153-x0 Degenerate RC Core Optics Position & Orientation (Some revisions to T010076) Michael Smith Document Migration
25 May 2007
E990086-x0 COMPONENT SPECIFICATION - COS Viewport Window Jonathan Kern et al. Document Migration
05 Apr 2007
T060232-x0 A)S: Optical Lever System & Viewports Conceptual Design Requirements Michael Smith Document Migration
27 Oct 2006
T060360-x0 AOS: PO Mirror Assembly & Telescope, and OMMT Conceptual Design Requirements Michael Smith Document Migration
27 Oct 2006
G060498-x0 Thermal Compensation System Design Requirement and Conceptual Design Review Presentation - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Michael Smith et al. Document Migration
20 Sep 2006
G060402-x0 Caltech 40m Lab Update - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Benjamin Abbott et al. Document Migration
18 Aug 2006
E050222-x0 Document Change Notice (DCN) - OUTPUT MODE MATCHING TELESCOPE (OMMT) ASSEMBLY, 40M Michael Smith Document Migration
10 Jul 2006
G060127-x0 Results of 40m prototype - LSC Meeting, March 19-22, 2006, Hanford WA Benjamin Abbott et al. Document Migration
14 Apr 2006
D050372-x0 PZT ALIGNMENT FIXTURE OMC Michael Smith Document Migration
02 Nov 2005
D050317-x0 PINHOLE ALIGNMENT FIXTURE Michael Smith Document Migration
31 Oct 2005
D050319-x0 SECONDARY MIRROR HOLDER Michael Smith Document Migration
31 Oct 2005
D050320-x0 BASE PLATE, OMMT Michael Smith Document Migration
31 Oct 2005
D050313-x0 SECONDARY STEERING MIRROR Michael Smith Document Migration
31 Oct 2005
G050568-x0 Optical Spring and Optical Resonance in the 40m Detuned RSE Interferometer Benjamin Abbott et al. Document Migration
31 Oct 2005
D050316-x0 PRIMARY ALIGNMENT MIRROR Michael Smith Document Migration
31 Oct 2005
D050315-x0 SECONDARY ALIGNMENT MIRROR Michael Smith Document Migration
31 Oct 2005
D050367-x0 AG WASHER OMC Michael Smith Document Migration
31 Oct 2005
D050327-x0 FLEXURE ADJUSTING SCREW Michael Smith Document Migration
31 Oct 2005
D050326-x0 9962 LENS POST MOD Michael Smith Document Migration
31 Oct 2005
D050308-x0 OMMT Assembly, 40M Michael Smith Document Migration
31 Oct 2005
D020516-x0 FLEXURE, 40M IFO MMT Michael Smith Document Migration
31 Oct 2005
D050325-x0 LH-1 VAC MOD Michael Smith Document Migration
31 Oct 2005
D050323-x0 OUTRIGGER PLATE Michael Smith Document Migration
31 Oct 2005
D050318-x0 PRIMARY MIRROR HOLDER, OMMT Michael Smith Document Migration
31 Oct 2005
D050371-x0 PZT END CAP OMC Michael Smith Document Migration
31 Oct 2005
D050322-x0 DLC OUTRIGGER BASE Michael Smith Document Migration
31 Oct 2005
G050324-x0 Plans for DC Readout Experiment at the 40m Lab Benjamin Abbott et al. Document Migration
08 Sep 2005
T050066-x0 Beamsplitter Diffraction Loss (Advanced LIGO) Michael Smith Document Migration
22 Jun 2005
T050064-x0 Thermal Compensation System Description Stefan Ballmer et al. Document Migration
10 May 2005
T040057-x0 Heating Beam Pattern Optical Design CO2 Laser Thermal Compensation Bench Gerardo Moreno et al. Document Migration
30 Nov 2004
G040172-x0 Thermal Compensation Installation at LHO - GR17, July 18-23, 2004, Dublin Ireland Stefan Ballmer et al. Document Migration
30 Nov 2004
G040456-x0 Modeling and Prototyping a Zoom Telescope for LIGO Optical Levers D Mckay et al. Document Migration
12 Oct 2004
T030245-x0 LIGO Caltech 40-Meter PSL Supplemental Report Benjamin Abbott et al. Document Migration
10 Aug 2004
E040280-x0 Document Change Notice (DCN) - Thermal Compensation, CO2 Laser Mask Projector Michael Smith Document Migration
16 Jun 2004
D040098-x0 BESSEL APERTURE_REV1 ASSY Michael Smith Document Migration
15 Jun 2004
D040080-x0 OPTICAL BENCH SUPPORT BAR_1 HOLE Michael Smith Document Migration
15 Jun 2004
D040079-x0 OPTICAL BENCH SUPPORT BAR_2 HOLE Michael Smith Document Migration
15 Jun 2004
D030807-x0 FIXED BASE--METRIC Michael Smith Document Migration
15 Jun 2004
D040169-x0 AIM LASER MOUNT Michael Smith Document Migration
15 Jun 2004
D040099-x0 FIXED APERTURE ASSY Michael Smith Document Migration
15 Jun 2004
D040174-x0 POLARIZER PEDESTAL Michael Smith Document Migration
15 Jun 2004
D040035-x0 MASK BESSEL Michael Smith Document Migration
15 Jun 2004
D040272-x0 MASK FLIPPER ASSY Michael Smith Document Migration
15 Jun 2004
D040033-x0 MASK CENTRAL Michael Smith Document Migration
15 Jun 2004
D030804-x0 BACKING PLATE 4.5 IN Michael Smith Document Migration
15 Jun 2004
D040269-x0 2.625 DIA ELLIP MIRROR ASSY Michael Smith Document Migration
15 Jun 2004
D040058-x0 TUBE AUX MIRROR MOUNT Michael Smith Document Migration
15 Jun 2004
D040097-x0 BESSEL APERTURE_REV1 Michael Smith Document Migration
15 Jun 2004
D040057-x0 BASE AUX MIRROR MOUNT Michael Smith Document Migration
15 Jun 2004
D040034-x0 MASK ANNULAR 0.126 ID Michael Smith Document Migration
15 Jun 2004
D040166-x0 POLARIZER HOUSING ASSY Michael Smith Document Migration
15 Jun 2004
D030802-x0 MIRROR MOUNT BRACKET 4.5 IN Michael Smith Document Migration
15 Jun 2004
D040062-x0 MASK BESSEL ASSY Michael Smith Document Migration
15 Jun 2004
D040056-x0 RISER AUX MIRROR MOUNT Michael Smith Document Migration
15 Jun 2004
D030803-x0 MODIFICATION 4.5 IN MIRROR MT Michael Smith Document Migration
15 Jun 2004
D040270-x0 6 IN PARABOLIC MIRROR ASSY Michael Smith Document Migration
15 Jun 2004
D030809-x0 FIXED MOUNT 6 IN Michael Smith Document Migration
15 Jun 2004
D040173-x0 FIXED BASE_ENGLISH Michael Smith Document Migration
15 Jun 2004
D040055-x0 IRIS DIAPHRAGM PEDESTAL Michael Smith Document Migration
15 Jun 2004
D040095-x0 FIXED APERTURE Michael Smith Document Migration
15 Jun 2004
D030800-x0 HOLD DOWN SPACER 6 IN Michael Smith Document Migration
15 Jun 2004
D040175-x0 ASSEMBLY, CO2 LASER PROJECTOR 2K Michael Smith Document Migration
15 Jun 2004
D040273-x0 45 DEGREE MIRROR ASSY Michael Smith Document Migration
15 Jun 2004
D040263-x0 PD MOUNT Michael Smith Document Migration
15 Jun 2004
D030808-x0 45 DEG MIRROR ADAPTER Michael Smith Document Migration
15 Jun 2004
D030801-x0 BACKING PLATE 6 IN Michael Smith Document Migration
15 Jun 2004
D040167-x0 POLARIZER HOUSING Michael Smith Document Migration
15 Jun 2004
D040003-x0 ASSEMBLY, C02 LASER PROJECTOR 4K Michael Smith Document Migration
15 Jun 2004
D040061-x0 AUX MIRROR MOUNT ASSY Michael Smith Document Migration
15 Jun 2004
D030805-x0 HOLD DOWN SPACER 4.5 IN Michael Smith Document Migration
15 Jun 2004
G040081-x0 40m Laboratory Upgrade Progress Report - LSC Meeting, March 15 - 18th, Livingston, LA Benjamin Abbott et al. Document Migration
18 Mar 2004
T030141-x0 Errant Beam Baffle Installation LLO and LHO Michael Smith Document Migration
17 Sep 2003
D030176-x0 LOCATOR, BREWSTER MIRROR Michael Smith Document Migration
01 Jul 2003
D030175-x0 PLATFORM, BREWSTER MIRROR Michael Smith Document Migration
01 Jul 2003
D030177-x0 CLIP, BREWSTER MIRROR Michael Smith Document Migration
01 Jul 2003
E030164-x0 Document Change Notice (DCN): Brewster Mirror Assembly, Rev. 02 Michael Smith Document Migration
23 Jun 2003
E030143-x0 Document Change Notice (DCN) - Spectrum Analyzer Mount (D030167-A), Rev. 02 Michael Smith Document Migration
23 Jun 2003
G030206-x0 Hydraulic Actuators for Advanced LIGO and LIGO I - Aspen Conference 2003 Rich Abbott et al. Document Migration
17 Apr 2003
D030167-x0 Spectrum Analyzer Mount Michael Smith Document Migration
16 Apr 2003
T030028-x0 Faraday Isolator Alignment Procedure, 40M IFO Michael Smith Document Migration
25 Feb 2003
T030006-x0 Errant Beam Analysis, LIGO 1 Michael Smith Document Migration
22 Jan 2003
D980414-x0 ETM Transmission Monitor Assembly Michael Smith Document Migration
22 Jan 2003
T020203-x0 40 Meter Focal Lengthy Zoom Objective Lens for Optical Lever System-Position Memory Michael Smith Document Migration
03 Jan 2003
T020202-x0 Pre-Alignment of VIRGO Interferometer Michael Smith Document Migration
03 Jan 2003
T020204-x0 Beam Deviation Due to De-centering of Power Recycling Mirror Curved Surface Michael Smith Document Migration
03 Jan 2003
G020437-x0 Photon Actuation R & D Program Michael Smith Document Migration
09 Oct 2002
T020119-x0 IO Position and Angle Sensing System, 40m IFO Michael Smith Document Migration
03 Sep 2002
E010221-x0 Document Change Notice (DCN) Michael Smith Document Migration
20 May 2002
G020113-x0 Current Work on Hydraulics for LIGO I - LSC Meeting, March 20 - 23, Livingston LA Rich Abbott et al. Document Migration
08 Apr 2002
T010120-x0 40m Auxiliary Optics Support System Design Requirements Document & Conceptual Design Michael Smith Document Migration
07 Feb 2002
T980101-x0 Up-Conversion of Scattered Light Phase Noise from Large Amplitude Motions Michael Smith Document Migration
07 Feb 2002
E010094-x0 Installation Specification - Re-alignment of the LLO 4K Interferometer Vertex Region Dennis Coyne et al. Document Migration
06 Feb 2002
T010117-x0 40m Optical Systems and Sensing, Design Requirements Document & Conceptual Design Michael Smith Document Migration
13 Dec 2001
T010115-x0 Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer Benjamin Abbott et al. Document Migration
26 Nov 2001
T000065-x0 COS 4K IFO Alignment Procedure Michael Smith Document Migration
28 Jun 2001
E000453-x0 Process Traveler Michael Smith Document Migration
17 Oct 2000
E990376-x0 Process Traveler Michael Smith Document Migration
15 Aug 2000
E000258-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000131-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000343-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000157-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000228-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000227-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000048-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000124-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000156-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000169-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000189-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000318-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000125-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000172-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000223-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000271-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000229-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000319-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000164-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000191-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000129-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000050-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000224-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000192-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000151-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000176-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000190-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000163-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000230-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000342-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000158-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000051-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000049-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000175-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000272-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000149-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000162-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E990370-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000226-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000154-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000221-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000225-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000148-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000152-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
E000165-x0 Process Traveler Michael Smith Document Migration
08 Aug 2000
D980341-x0 ETM Transmission Monitor, Alignment Sensing Control, Rev. B Michael Smith et al. Document Migration
22 May 2000
D000093-x0 ETM Cover Plate, Bottom, Rev. A Michael Smith Document Migration
21 May 2000
D000005-x0 Support Bracket, ETM Camera, Rev. B Michael Smith et al. Document Migration
21 May 2000
D000004-x0 Support Mount, ETM Camera, Rev. B Michael Smith et al. Document Migration
21 May 2000
D000094-x0 BSC2, Optical Lever Assembly Michael Smith Document Migration
24 Mar 2000
G000008-x0 Scattered Light Control in LIGO, 2000 Aspen Winter Conference Michael Smith Document Migration
14 Mar 2000
E990399-x0 Process Traveler: ETM Telescope Assembly, 004 Michael Smith Document Migration
02 Mar 2000
E000031-x0 Process Traveler: 4K IO Baffle, LLO Michael Smith Document Migration
01 Mar 2000
E990446-x0 Process Traveler: 4K IO Baffle Michael Smith Document Migration
01 Mar 2000
E000042-x0 Process Traveler: Mode Cleaner Baffle, LHO, Rev. 01 Michael Smith Document Migration
01 Mar 2000
E000086-x0 Process Traveler: High Vac Mirror Mount Assembly Michael Smith Document Migration
01 Mar 2000
E000030-x0 Process Traveler: 4K IO Baffle, LHO Michael Smith Document Migration
01 Mar 2000
E000012-x0 Process Traveler: LHO Pick Off Telescope, Rev. 01 Michael Smith Document Migration
01 Mar 2000
E000024-x0 Process Traveler: ETM PO Beam Dump, LLO Michael Smith Document Migration
01 Mar 2000
E000100-x0 Process Traveler: 2 in. High Vac Mirror Mount Assembly Michael Smith Document Migration
01 Mar 2000
E990322-x0 Process Traveler: APS P.O. Beam Optical Train Michael Smith Document Migration
01 Mar 2000
E000090-x0 Process Traveler: ETM PO Beam_Beam Dump, LLO Michael Smith Document Migration
01 Mar 2000
E000039-x0 Process Traveler: 4K IO Baffle, LLO Michael Smith Document Migration
01 Mar 2000
E990435-x0 Process Traveler: Eliptical Baffle Counter Weight Assembly Michael Smith Document Migration
01 Mar 2000
E000097-x0 Process Traveler: Beam Dump Assemblies, BSC4 Michael Smith Document Migration
01 Mar 2000
E000013-x0 Process Traveler: LHO Pick Off Telescope, Rev. 01 Michael Smith Document Migration
01 Mar 2000
E990442-x0 Process Traveler: Mode Cleaner Baffle (LLO) Michael Smith Document Migration
01 Mar 2000
E000091-x0 Process Traveler: ETM PO Beam_Beam Dump, LHO Michael Smith Document Migration
01 Mar 2000
E990398-x0 Process Traveler: ETM Telescope Assembly, 003 Michael Smith Document Migration
01 Mar 2000
E990397-x0 Process Traveler: ETM Telescope Assembly, 002 Michael Smith Document Migration
01 Mar 2000
E990444-x0 Process Traveler: Mode Cleaner Baffle Michael Smith Document Migration
01 Mar 2000
E000010-x0 Process Traveler: LHO Pick Off Telescope Michael Smith Document Migration
01 Mar 2000
E000087-x0 Process Traveler: Elliptical Baffle Assembly, LLO Michael Smith Document Migration
01 Mar 2000
E000040-x0 Process Traveler: 4K IO Baffle, LHO Michael Smith Document Migration
01 Mar 2000
E000016-x0 Process Traveler: ETM Telescope Assembly, Rev. 01 Michael Smith Document Migration
01 Mar 2000
E000088-x0 Process Traveler: 2 in. High Vac Mirror Mount Assembly Michael Smith Document Migration
01 Mar 2000
E990400-x0 Process Traveler: ETM Telescope Assembly, 005 Michael Smith Document Migration
01 Mar 2000
E000011-x0 Process Traveler: LLO Pick Off Telescope Michael Smith Document Migration
01 Mar 2000
E990429-x0 Process Traveler Michael Smith Document Migration
03 Dec 1999
E990407-x0 Process Traveler Michael Smith Document Migration
12 Nov 1999
E990394-x0 Process Traveler Michael Smith Document Migration
05 Nov 1999
T990088-x0 COS 2K IFO Alignment Procedures, Rev. 01 Michael Smith Document Migration
04 Nov 1999
E990381-x0 Process Traveler Michael Smith Document Migration
01 Nov 1999
E990315-x0 Process Traveler Michael Smith Document Migration
07 Sep 1999
E990341-x0 Process Traveler Michael Smith Document Migration
07 Sep 1999
E990289-x0 Process Traveler Michael Smith Document Migration
07 Sep 1999
E990312-x0 Process Traveler Michael Smith Document Migration
07 Sep 1999
E990318-x0 Process Traveler, Rev. 01 Michael Smith Document Migration
07 Sep 1999
E990326-x0 Process Traveler, Rev. 02 Michael Smith Document Migration
07 Sep 1999
E990306-x0 Process Traveler Michael Smith Document Migration
07 Sep 1999
E990329-x0 Process Traveler Michael Smith Document Migration
07 Sep 1999
E980130-x0 Component Specification: TEL_PAR SECONDARY MIRROR, Rev. B Jonathan Kern et al. Document Migration
14 Jul 1999
E990274-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990280-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990251-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990238-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990275-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990083-x0 IFO COC and Beam Coordinate Data, Rev. A Dennis Rose et al. Document Migration
14 Jul 1999
E990257-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990267-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990266-x0 Process Traveler Michael Smith Document Migration
14 Jul 1999
E990154-x0 Process Traveler Michael Smith Document Migration
10 May 1999
E990194-x0 Process Traveler Michael Smith Document Migration
28 Apr 1999
E990031-x0 Process Traveler Michael Smith Document Migration
02 Feb 1999
E980129-x0 Component Specification: TEL_PAR PRIMARY MIRROR, Rev. B Jonathan Kern et al. Document Migration
02 Feb 1999
E980262-x0 Component Specification: Pick Off Telescope, Rev. B Jonathan Kern et al. Document Migration
01 Feb 1999
E990033-x0 Process Traveler Michael Smith Document Migration
25 Jan 1999
E980356-x0 Process Traveler Michael Smith Document Migration
25 Jan 1999
E990075-x0 Process Traveler Michael Smith Document Migration
25 Jan 1999
E980328-x0 Component Specification: ETM Telescope Lenses, Rev. A Jonathan Kern et al. Document Migration
24 Nov 1998
E980261-x0 Component Specifcation: ETM Telescope, Rev. A Jonathan Kern et al. Document Migration
24 Nov 1998
T980104-x0 COS Final Design, Rev. 01 Ara Badalian et al. Document Migration
19 Nov 1998
T980097-x0 Optical Lever Beams Mechanical Layout, Rev. 01 Michael Smith Document Migration
14 Nov 1998
E980263-x0 Component Specification: Conflat/Viewport - COS, Rev. A Jonathan Kern et al. Document Migration
14 Nov 1998
E980288-x0 COS Steering Mirror-1, -2, -3 High Reflectance Coating, Rev. A Jonathan Kern et al. Document Migration
06 Nov 1998
T980075-x0 Component Specification: Pick Off Telescope Requirements, Rev. 01 Jonathan Kern et al. Document Migration
22 Sep 1998
T980027-x0 Baffling Requirements for the 4K and 2K IFO, Rev. 01 Michael Smith Document Migration
11 Sep 1998
T980054-x0 PO Beam Waist Size and Location on the ISC Table, Rev. 02 Michael Smith Document Migration
11 Sep 1998
T980010-x0 Core Optics Support Preliminary Design, Rev. 01 Michael Smith Document Migration
11 May 1998
T980007-x0 Effect of PO Telescope Aberrations on Wavefront Sensor Performance Michael Smith Document Migration
05 Mar 1998
T970071-x0 Core Optics Support Design Requirements Document (DRD), Rev. 02 Michael Smith Document Migration
05 Mar 1998
T970112-x0 Physics Environmental Monitoring Final Design Document Alex Marin et al. Document Migration
23 Dec 1997
T970072-x0 Core Optics Support Conceptual Design Michael Smith Document Migration
12 May 1997
G970067-x0 Core Optics Support Design Requirements Review (DRR) Michael Smith Document Migration
28 Apr 1997

Number of documents found: 583


DCC Version 3.4.2, contact DCC Help