C2500022-x0 |
Project Management |
Brian O'Reilly |
Project Controls
Observatory Facilities
LIGO-India
System Engineering
|
17 Jan 2025 |
T1900280-v1 |
Optimal non-linear control for LIGO interferometers |
Millind Vaddiraju et al. |
Project Controls
|
01 Mar 2020 |
M050303-v5 |
Advanced LIGO Project Execution Plan |
David Shoemaker et al. |
Project Controls
Management
|
25 Nov 2015 |
T1500091-v1 |
3IFO PSL ISS Photodetector Array Inventory Peter King Email |
Gary Davis et al. |
Project Controls
|
20 Mar 2015 |
T1500083-v1 |
3IFO PSL Table Contents Packing Lists/Inventory |
Gary Davis et al. |
Project Controls
System Engineering
|
04 Mar 2015 |
M1300468-v10 |
Acceptance Process for the Advanced LIGO Project |
Dennis Coyne et al. |
Project Controls
Policies
|
23 Feb 2015 |
M070102-v2 |
M070102 Advanced LIGO Change Control Procedure |
Carol Wilkinson et al. |
Change Control
Project Controls
|
22 Feb 2015 |
P1400189-v1 |
Correlated Noise in LIGO Detectors from Schumann Resonance |
Ryan Horton et al. |
Calibration
Project Controls
Education, Outreach
|
25 Sep 2014 |
T1300734-v1 |
Simulating the Advanced LIGO Interferometer Using the Real Control Code |
Juan Castillo |
Project Controls
|
31 Aug 2014 |
G1300850-v1 |
Simulating the Advanced LIGO Interferometer Using the Real Control Code |
Juan Castillo |
Project Controls
|
27 Nov 2013 |
M060056-v2 |
Advanced LIGO Reference Design |
David Shoemaker |
Conceptual Design
Detector
Reports
|
08 May 2011 |
M0810012-v2 |
Advanced LIGO UK Project Management Meeting Number 51, Telecon Dec 2008 |
Justin Greenhalgh |
Project Controls
|