Document List by Author

Brian O'Reilly of LIGO - Livingston Observatory is listed as an author on the following documents:
(List events moderated by Brian O'Reilly)

LIGO-Number Title Author(s) Topic(s) Last Updated
G0900676-v3 Advanced LIGO Preliminary Design Review of the BSC ISI system - Overview Presentation Stephany Foley et al. Seismic Isolation
Reviews
Preliminary Design
20 Jun 2018
P1200087-v47 Prospects for Observing and Localizing Gravitational-Wave Transients with Advanced LIGO, Advanced Virgo and KAGRA Christopher Berry et al. GW Bursts
Commissioning
Astrophysics / Multi-messenger
Compact Binaries
26 Apr 2018
G1800395-v5 Post O2 Installation and Commissioning Brian O'Reilly et al. Public Talk / Colloquium
Public relations
16 Mar 2018
G1800400-v1 Response to Open Public Alerts Brian O'Reilly et al. Public Talk / Colloquium
16 Mar 2018
G1500623-v2 aLIGO, CAL, Advanced LIGO Sensitivity Plots Jeffrey Kissel et al. Calibration
Commissioning
18 Apr 2017
P080073-v1 Requirements for a Ground Rotation Sensor to Improve Advanced LIGO Robert Schofield et al. Seismic Isolation
Requirements
Basic R&D
13 Jun 2016
L1600062-v1 Review Committee Report on the Non-Magnetic Blade-spring Damper (NMBD) Dennis Coyne et al. System Engineering
Suspensions
08 Apr 2016
L1500138-v6 LLO, LHO site status for GW150914 LIGO Scientific Collaboration et al. Detector
Data Analysis
11 Feb 2016
T1500365-x0 aLIGO Analysis Technique and Parameters for Producing "Official" Estimates of IFO Performance Amplitude Spectral Densities Joseph Betzwieser et al. Calibration
08 Jul 2015
L1500019-v1 LHO Installation Acceptance Review Report Michael Landry et al. Reviews
06 May 2015
Q1500019-v1 Waiver: air bake 50 barrel nuts Brian O'Reilly Quality Assurance
Seismic Isolation
System Engineering
Vacuum
11 Mar 2015
Q1500018-v1 Waiver: air bake 4 dowel pins for HAM-ISI actuator assy Brian O'Reilly Quality Assurance
Seismic Isolation
System Engineering
Vacuum
11 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Sensing and Control
Integration
Basic R&D
05 Mar 2015
E1400459-v11 aLIGO LHO Installation Acceptance "Punch List" Michael Landry et al. Installation
Reviews
Detector
12 Feb 2015
G080571-v1 aLIGO HAM-ISI PDR: Part 3 - Production Brian O'Reilly Seismic Isolation
Reviews
Preliminary Design
29 Jan 2015
D1002834-v2 aLIGO Installation, LLO Y-End Station, Cartridge & Cleanroom, Layout Brian O'Reilly et al. Installation
Conceptual Design
Observatory Facilities
14 Jan 2015
E1300847-v8 aLIGO Installation Acceptance Document for LBSC2 Stuart Aston et al. Installation
20 Sep 2014
E1400216-v1 aLIGO Installation Acceptance Document for L1 DAQ Brian O'Reilly et al. Installation
21 Jun 2014
E1400202-v3 aLIGO Installation Acceptance Document for LHAM6 Brian O'Reilly Installation
21 Jun 2014
E1400201-v1 aLIGO Installation Acceptance Document for LHAM1 Brian O'Reilly Installation
21 Jun 2014
E1400082-v4 aLIGO Installation Acceptance Document for LBSC5 (Y) Stuart Aston et al. Installation
21 Jun 2014
E1400185-v6 aLIGO Installation Acceptance Document for LBSC4 (X) Dennis Coyne et al. Installation
21 Jun 2014
F0900070-v6 GS-13 Inspection Checklist Joe Hanson et al. Subsystem Test
Installation
Seismic Isolation
Incoming Inspection
18 Jun 2014
T0900564-v2 aLIGO Large Actuator Test Results from Qinetiq Brian O'Reilly Seismic Isolation
Incoming Inspection
18 Jun 2014
T1100234-v2 aLIGO Small Actuator Test Results from Qinetiq Brian O'Reilly Seismic Isolation
18 Jun 2014
E1200483-x0 aLIGO, INS Michael Landry et al. Installation
Detector
03 Apr 2014
D1002842-v1 aLIGO Installation, LLO X-End Station, Cartridge & Cleanroom, Layout Brian O'Reilly et al. Installation
Observatory Facilities
18 Dec 2012
None
E0900006-v1 Review of HAM-ISI "Watchdog" safety software Sam Waldman et al. Data and Computing
Data Acquisition System
Seismic Isolation
Safety
System Engineering
Suspensions
01 Apr 2012
G1100511-v5 Plenary 4 aLIGO Installation Status, April 2011 Brian O'Reilly et al. Reviews
05 May 2011
L0900118-v8 Advanced LIGO Preliminary Design Review of the BSC ISI system Fabrice Matichard et al. Seismic Isolation
Reviews
Preliminary Design
04 May 2011
M1000142-v2 Advanced LIGO Review Committee Report: Test Mass Optical Lever PDR Hugh Radkins et al. Reviews
Auxiliary Optics
24 Sep 2010
T1000227-v1 Summary of S5 Calibration Models and Uncertainties Keita Kawabe et al. Calibration
Detector
09 Aug 2010
None
None
None
None
P080072-x0 Accurate measurement of the time delay in the response of the LIGO gravitational wave detectors Daniel Sigg et al. Document Migration
Public relations
26 Oct 2009
P070044-x0 Effects of mode degeneracy in the LIGO Livingston Observatory recycling cavity Brian O'Reilly et al. Document Migration
Public relations
14 Oct 2009
G0900519-v1 Accurate measurement of the time delay in the response of the LIGO gravitational wave detectors Daniel Sigg et al. Calibration
30 Jun 2009
M080034-v1 Magnet Swap Review for Enhanced LIGO Norna Robertson Reviews
Upgrades
Suspensions
13 Mar 2009
T080317-x0 Impact of Seismic Survey using Explosive Charges on the LIGO LIvingston Interferometer Jan Harms et al. Document Migration
05 Nov 2008
T080254-x0 HAM ISI List of "Gotchas", Needs and Reminders Joe Hanson et al. Document Migration
07 Oct 2008
T080262-x0 Cleaning and Assembly Procedure for ISI Sensor Pods Joe Hanson et al. Document Migration
07 Oct 2008
E080080-x0 Process Traveler - Miscellaneous 1/4-20 bolts to secure balance weights on HAM-ISI at LLO Brian O'Reilly Document Migration
12 May 2008
E080078-x0 Process Traveler - Large Trim Mass for HAM-ISI Brian O'Reilly Document Migration
12 May 2008
E080061-x0 Process Traveler - Bellows for HAM-ISI at LLO Brian O'Reilly Document Migration
25 Apr 2008
E080055-x0 Process Traveler - Silver Plated Hardware for LLO HAM-ISI Brian O'Reilly Document Migration
25 Apr 2008
E080054-x0 Process Traveler - Four GS-13 chambers and four baseplates Brian O'Reilly Document Migration
25 Apr 2008
E080018-x0 Process Traveler - GS-13 pod and baseplate Brian O'Reilly Document Migration
25 Apr 2008
E080010-x0 Process Traveler - 3/8-16x1-3/4" Silver Plated bolts for HAM-ISI Brian O'Reilly Document Migration
25 Apr 2008
E080011-x0 Process Traveler - GS-13 CHAMBER AND BASEPLATE Brian O'Reilly Document Migration
25 Apr 2008
E070299-x0 Process Traveler - HAM SEI spare parts Brian O'Reilly Document Migration
24 Apr 2008
G080216-x0 Investigation of Discrepancies Between Photon Calibrator, VCO and Official (Coil) Calibration Techniques - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 Justin Garofoli et al. Document Migration
04 Apr 2008
G080136-x0 S5 Calibration Status - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 Brian O'Reilly Document Migration
04 Apr 2008
E080017-x0 Process Traveler -1/2-13x2" and 3/8-16x2.5" SHCS-Silver Plated Hardware Brian O'Reilly Document Migration
11 Mar 2008
E070308-x0 Process Traveler - GS-13 pod parts Brian O'Reilly Document Migration
11 Mar 2008
E070300-x0 Process Traveler - GS-13 Seismometer pod assembly and associated hardware Brian O'Reilly Document Migration
11 Mar 2008
E070296-x0 Process Traveler - HAM flexure cup cleaning Brian O'Reilly Document Migration
06 Feb 2008
E070295-x0 Process Traveler - HAM actuator plate cleaning Brian O'Reilly Document Migration
10 Dec 2007
G060645-x0 Status of LIGO - GWDAW 11, Potsdam, Germany, December 18-21, 2006 Brian O'Reilly Document Migration
22 Dec 2006
G060601-x0 All-Sky Search for Gravitational Wave Bursts during the 5th LIGO Science Run - GWDAW 11, Potsdam, Germany, December 18-21, 2006 Brian O'Reilly Document Migration
22 Dec 2006
G060584-x0 Staus of LIGO Brian O'Reilly Document Migration
17 Nov 2006
T050059-x0 Calibration of the LIGO detectors for the S3 Gabriela Gonzalez et al. Document Migration
11 Sep 2006
G060454-x0 S5 Calibration Status - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Brian O'Reilly Document Migration
16 Aug 2006
G060121-x0 S4/S5 Calibration Status - LSC Meeting, March 19-22, 2006, Hanford WA Brian O'Reilly Document Migration
05 Jun 2006
T060104-x0 Study of Nonparaxiality Using the LIGO Livingston Detector Erika D'ambrosio et al. Document Migration
22 May 2006
G060117-x0 S5 calibration: time dependent coefficients - LSC Meeting, March 19-22, 2006, Hanford WA Gabriela Gonzalez et al. Document Migration
14 Apr 2006
T040175-x0 Specification for Storing Calibration Data for LIGO Duncan Brown et al. Document Migration
05 Jan 2006
G050554-x0 Status and Recent Results from the LIGO Experiment Brian O'Reilly Document Migration
26 Oct 2005
G050387-x0 Spectral Line Catalogue Status - LSC Meeting, August 14th - 17th, Hanford WA Philip Charlton et al. Document Migration
18 Aug 2005
G050237-x0 Recent Progress at LIGO Brian O'Reilly Document Migration
27 Apr 2005
G050242-x0 Gravitational radiation from known radio pulsars using LIGO data. Brian O'Reilly Document Migration
27 Apr 2005
G050238-x0 Recent Progress at LIGO Brian O'Reilly Document Migration
27 Apr 2005
T040060-x0 Calibration of the LIGO Detectors for S2 Gabriela Gonzalez et al. Document Migration
21 Apr 2005
T050040-x0 Fields in the Recycling Cavity at LIGO Livingston Observatory Erika D'ambrosio et al. Document Migration
10 Mar 2005
G040327-x0 Status of StochMon, a DMT monitor for stochasic sensitivity - LSC Meeting, August 16th-19th, 2004, Hanford WA Marc Cenac et al. Document Migration
19 Aug 2004
T030298-x0 Transfer Function Measurements and Fits for the Revision C8 Dewhitening Filters Brian O'Reilly Document Migration
16 Jul 2004
G040176-x0 Time Domain Calibration: Making h(t) for LIGO - LSC Meeting, March 15 - 18th, Livingston, LA Bruce Allen et al. Document Migration
19 Mar 2004
G040143-x0 S2/S3 Calibration - LSC Meeting, March 15 - 18th, Livingston, LA Rana Adhikari et al. Document Migration
18 Mar 2004
G040152-x0 Storing Time-Domain Calibration Information in Frame Files - LSC Meeting, March 15 - 18th, Livingston, LA Gabriela Gonzalez et al. Document Migration
18 Mar 2004
G040050-x0 LIGO: Current Status and Some Initial Results Brian O'Reilly Document Migration
27 Feb 2004
G030605-x0 Calibration: S2 update, S3 preliminaries - LSC Meeting, November 10th - 13th, Hanford WA Rana Adhikari et al. Document Migration
14 Nov 2003
G030426-x0 S2 Calibration Rana Adhikari et al. Document Migration
14 Oct 2003
G030297-x0 Measurements of Environmental Coupling to the Gravitational Wave Channel (PEM Injections) Aleksandr Ageyev et al. Document Migration
09 Jul 2003
T030097-x0 Calibration of the LIGO detectors for the First LIGO Scientific Run Rana Adhikari et al. Document Migration
28 May 2003
G030093-x0 Calibration Testing - LSC Meeting, March 17th - 20th, Livingston, LA Gabriela Gonzalez et al. Document Migration
23 Apr 2003
G030105-x0 Background to the Calibration - LSC Meeting, March 17th - 20th, Livingston, LA Brian O'Reilly Document Migration
19 Mar 2003

Number of documents found: 88

DCC Version 3.2.2, contact Document Database Administrators