Document List by Author

Jason Oberling of LIGO - Hanford Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
D1100291-v6 aLIGO IAS LHO Monuments Douglas Cook et al. Installation
Auxiliary Optics
30 Oct 2013
E1200392-v9 Initial Alignment Procedure - LBSC2 As Built Jason Oberling et al. Installation
10 Mar 2014
T0900614-v1 aLIGO PSL Safety Plan Peter King Laser Systems
Safety
21 Sep 2016
M1100040-v7 SOP for Arm Length Stabilization Setup in LVEA and VEA at LHO Bram Slagmolen et al. Sensing and Control
Safety
26 Aug 2015
T1900395-v1 Incoming Test of Spare SQZ Mephisto 1000NE Laser System Jason Oberling Laser Systems
Incoming Inspection
06 Aug 2019
T1400160-v8 Optical Lever Inspection and Hanford Thomas Vo et al. Installation
Auxiliary Optics
16 May 2017
E1400205-v4 IAS LHO Primary Optics As Built Alignment Summary Jason Oberling et al. Installation
Auxiliary Optics
26 Jul 2016
E1400204-v5 IAS LLO Primary Optics As Built Alignment Summary Jason Oberling et al. Installation
Auxiliary Optics
24 Jul 2016
T1500081-v2 3IFO OpLev Inventory Spreadsheets Douglas Cook et al. Auxiliary Optics
18 Mar 2015
E1100690-v10 Initial Alignment Procedure - WBSC8 As Built Jason Oberling et al. Installation
11 Jun 2014
E1101071-v5 Initial Alignment Procedure - WBSC6 As Built Douglas Cook et al. Installation
Auxiliary Optics
05 Jun 2014
E1200795-v6 Initial Alignment Procedure - WBSC2 As Built Jason Oberling et al. Installation
02 Jun 2014
E1200956-v7 Initial Alignment Procedure - LBSC4 As Built Jason Oberling et al. Installation
Auxiliary Optics
02 Jun 2014
E1100784-v8 Initial Alignment Procedure - LHAM4 and LHAM5 As Built Ken Mason et al. Installation
23 May 2014
E1100783-v9 Initial Alignment Procedure - LHAM2 and LHAM3 As Built Douglas Cook et al. Installation
22 May 2014
E1200393-v6 Initial Alignment Procedure - LBSC3 As Built Jason Oberling et al. Installation
05 May 2014
E1200957-v5 Initial Alignment Procedure - LBSC5 As Built Douglas Cook et al. Installation
Auxiliary Optics
04 Apr 2014
D1200076-v3 Alignment Monument Layout, LHO Y-End Station, BSC Mechanical Test Stands Douglas Cook et al. Installation
Auxiliary Optics
17 Jan 2014
D1300968-v1 Alignment Monument Layout, LHO X-End Station, BSC Mechanical Test Stand Jason Oberling Installation
Auxiliary Optics
30 Oct 2013
E1101072-x0 Initial Alignment Procedure -LHAM6 Douglas Cook et al. Installation
23 Apr 2013

Number of documents found: 20


DCC Version 3.4.2, contact DCC Help