Document List by Topic

These documents on Installation (subtopic of Activity) are available:
(List events on Installation)

LIGO-Number Title Author(s) Topic(s) Last Updated
E1000654-v5 Specification for LIGO BSC Work Platforms John Worden et al. Installation
19 Oct 2023
E1100530-v10 PSL/IO/TCS Chassis Cabling/Wiring Diagram Jose Puente et al. Laser Systems
State Control and Monitoring
Installation
01 Sep 2021
E1000828-v2 Prism bonding jig settings calculation sheet for the ERM and TCP Marielle van Veggel Installation
Suspensions
13 Sep 2011
E1000006-v24 Advanced LIGO Quad Suspension Metal-Build Assembly Procedure Joe ODell et al. Assembly
Installation
Suspensions
06 Aug 2020
T1000489-v9 Specification for LIGO Installation Cleanrooms John Worden et al. Procurements
Installation
01 Aug 2018
E1000752-v5 Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) Margot Hennig et al. Installation
Suspensions
08 Mar 2016
D1001797-v2 aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout Dennis Coyne Installation
14 Jan 2015
D1002153-v3 aLIGO BS/FM Prism holder Marielle van Veggel et al. Installation
Suspensions
11 Dec 2013
D1101585-v2 TRANSMON ISC as installed for the H2OAT Lisa Barsotti Installation
Auxiliary Optics
25 Nov 2013
D1101048-v3 aLIGO, PLATE, TEMPLATE, ALIGNMENT , BSC STRUCTURE Scott Shankle et al. Fabrication
Installation
Final Design
Suspensions
25 Aug 2011
T1200385-v2 LLO BS Prism Gluing Issue and Resolution Janeen Romie et al. Modelling
Installation
Suspensions
18 Oct 2013
T1100073-v3 List of Suspensions in Chambers Norna Robertson Installation
Suspensions
07 Feb 2011
D1101120-v2 Name plate Laser/Ante PSL Jose Puente Laser Systems
Installation
22 Feb 2013
D1101121-v2 PSL/IO/TCS Chassis Name Plate Jose Puente Laser Systems
Installation
22 Feb 2013
D1001990-v3 Platform Walkway, BSC Installation Sam Barnum Installation
Seismic Isolation
01 Oct 2012
D1101489-v16 LASTI Wiring Diagram Sam Waldman et al. Installation
20 Jul 2012
T080230-v3 Quad Pendulum Structure Pushers Calum Torrie et al. Installation
02 Jul 2012
D070125-v3 LHO CDS Lans and Gateways David Barker Installation
Observatory Facilities
29 Nov 2011
T1100238-v2 Report on hydroxide catalysis bonding done at LHO in March and April 2011 Marielle van Veggel et al. Core Optics
Installation
Suspensions
02 Aug 2011
D1101462-v2 ISC End Station Transmission Monitor In-Vacuum Cable Sets Charles Osthelder Installation
29 Jul 2011
E1100659-v1 DCN, aLIGO TCS Ring Heater Replacement Fixture Mindy Jacobson Vacuum
System Engineering
Fabrication
Upgrades
Installation
Auxiliary Optics
20 Jul 2011
E1100660-v1 BOM, aLIGO TCS Ring Heater Replacement Fixture Assembly Mindy Jacobson Vacuum
System Engineering
Upgrades
Installation
Auxiliary Optics
Final Design
12 Jul 2011
D080180-v1 AdL SUS LASTI Noise Prototype Controls Wiring Jay Heefner Installation
Suspensions
11 Jul 2011
D060294-v1 LASTI AdL SUS Triple Controls Wiring Jay Heefner Installation
Suspensions
11 Jul 2011
E1100612-v1 H2 PSL Bill of Materials Jose Puente Laser Systems
Installation
05 Jul 2011
G1100759-x0 Building aLIGO at LIGO Hanford Observatory Fred Raab Detector
Installation
21 Jun 2011
D1002926-v2 Module-E, BSC Cartridge installation, aLIGO Sam Barnum et al. Installation
Observatory Facilities
15 Jun 2011
D1100919-v1 Extended Unified Plate Flipper Tooling Optics Table, BSC-ISI Sam Barnum Installation
Seismic Isolation
02 Jun 2011
D070586-v1 HAM ISI, INSTALLATION FIXTURE, aLIGO Sam Barnum et al. Document Migration
Upgrades
Installation
Seismic Isolation
31 May 2011
D1100991-x0 DC Power Cable Charles Osthelder Installation
25 May 2011
D1002812-v1 SLC ACB INTERFACE MOUNTING LOCATION Niem Nguyen Installation
Auxiliary Optics
13 May 2011
T1100264-v1 Evaluation of Cable Crosstalk and Shielding Rich Abbott et al. System Engineering
Installation
12 May 2011
E0900124-x0 AFWFS parts for HAM6 Traveler Sam Waldman Vacuum
Installation
07 May 2011
E1000678-v2 Optical Lever Heights above the Floor Dennis Coyne System Engineering
Installation
Auxiliary Optics
Final Design
04 May 2011
E1000711-v3 ALIGO LA Corner Station VE Installation Specification John Worden et al. Installation
11 Apr 2011
E1000712-v3 Anchor Bolt Installation John Worden et al. Installation
06 Apr 2011
D1100555-v1 Metrology baseplate for ear and prism position measurements Gerardo Moreno et al. Installation
Suspensions
31 Mar 2011
E1000708-v1 WA Corner Station Installation Jodi Fauver et al. Installation
29 Mar 2011
D1002152-v1 aLIGO BS/FM Prism holder assembly Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002150-x0 aLIGO BS/FM Prism bonding alignment guide Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002148-v1 aLIGO BS/FM Prism bonding fixture Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002146-v1 aLIGO TCP/ERM Prism holder Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002142-v2 aLIGO TCP Prism bonding baseplate Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002141-v2 aLIGO TCP Prism bonding fixture Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002144-v1 aLIGO TCP Prism bonding support cylinder Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002143-v1 aLIGO TCP Prism bonding alignment guide Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002140-v2 aLIGO TCP Prism bonding jig Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002203-v2 aLIGO ERM Prism bonding baseplate Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002145-v1 aLIGO TCP/ERM Prism holder assembly Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002202-v2 aLIGO ERM Prism bonding fixture Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002201-v2 aLIGO ERM Prism bonding jig Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D0900373-v2 ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub Giles Hammond et al. Basic R&D
Installation
Suspensions
08 Mar 2011
E1000718-v1 Specification for Vacuum/Clean Air Piping John Worden et al. Installation
03 Mar 2011
E1000717-v1 Specification for Piping Thermal Insulation John Worden et al. Installation
03 Mar 2011
E1000713-v1 Specification for Piping Design and Material John Worden et al. Installation
03 Mar 2011
E1000715-v1 Specification for Pipe Cleaning John Worden et al. Installation
03 Mar 2011
D070124-v1 Rack Input Power Box Gary McIntyre System Engineering
Installation
01 Mar 2011
D1003179-v2 aLIGO Installation, LHO Corner Station Vacuum Equipment Layout John Worden et al. Installation
28 Feb 2011
D1003180-v2 aLIGO Installation, LLO Corner Station Vacuum Equipment Layout John Worden et al. Installation
24 Feb 2011
E1000707-v5 WA Mid/End VE Installation John Worden et al. Installation
04 Feb 2011
D1100113-v1 Mid-Station Spool-LHO John Worden et al. Installation
21 Jan 2011
D1100111-v1 Adapter A-17 John Worden et al. Installation
21 Jan 2011
E1000716-v1 Component Alignment Procedure John Worden et al. Installation
20 Jan 2011
E1000719-v1 Contamination Control for Adv. LIGO Vacuum Equipment Installation John Worden et al. Installation
20 Jan 2011
D1003175-v2 aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
D1003176-v2 aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout John Worden et al. Installation
20 Jan 2011
C1001535-v7 Statement of Work for LIGO Installation Cleanrooms John Worden et al. Procurements
Installation
20 Jan 2011
E080426-v1 Advanced LIGO ERGO Arm Hazard Analysis Gregg Harry et al. Core Optics
Installation
06 Mar 2009
E070341-x0 HAM_ISI_Installation_Hazard_Analysis Fabrice Matichard et al. Document Migration
Installation
Seismic Isolation
26 Oct 2010
C1002236-v8 SOW Fabrication of aLIGO SEI Install Test Stands John Worden et al. Procurements
Installation
07 Jan 2011
D1003178-v1 aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
D1003177-v1 aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout John Worden et al. Installation
03 Jan 2011
C1002426-v6 Statement of Work for BSC Work Platforms John Worden et al. Installation
02 Dec 2010
E1000714-x0 Vacuum Valves John Worden et al. Installation
16 Nov 2010
C1001836-v1 Specification for De-Installation - Washington site. John Worden et al. Procurements
Installation
Observatory Facilities
11 Nov 2010
D1002291-v1 aLIGO TCP/ERM Prism holder fixing screw Marielle van Veggel et al. Installation
Suspensions
21 Oct 2010
D1002290-v1 aLIGO TCP/ERM Prism holder alignment bush Marielle van Veggel et al. Installation
Suspensions
21 Oct 2010
D1002289-v1 aLIGO TCP/ERM Prism holder alignment screw Marielle van Veggel et al. Installation
Suspensions
21 Oct 2010
T1000016-v1 ALIGO NP-type: - Preparations of Ear Bonding at LASTI (February 2010) Marielle van Veggel et al. Installation
Suspensions
12 Oct 2010
D0900537-v2 LHO As Built HAM6 optical layout Sam Waldman Sensing and Control
Installation
07 Oct 2010
L1000368-v1 LHO Installation Leader responsibilities and authorities David Shoemaker Detector
Installation
Management
04 Oct 2010
D1001685-v1 V-block - assembly Marielle van Veggel Installation
Suspensions
21 Sep 2010
T1000493-v1 Initial Alignment of PR3, ITM, and ETM prior to 1st Light Down the Arms Michael Smith Installation
Auxiliary Optics
14 Sep 2010
T1000472-v1 Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension Marielle van Veggel et al. Installation
Suspensions
26 Aug 2010
D1001633-v1 aLIGO ETM/ITM ear bonding jig - T-piece Russell Jones Installation
Suspensions
04 Aug 2010
D030715-v1 Relevant Dimensions for Quad and SEI Installation at LASTI Dennis Coyne Installation
25 Jun 2010
E1000097-v1 ETM TransMon Telescope SUS Installation Plan Ken Mailand Installation
Auxiliary Optics
30 Mar 2010
T1000170-x0 Installation Plan Transmon_Telescope_SUS Ken Mailand Installation
Auxiliary Optics
30 Mar 2010
T1000114-v1 ALIGO NP-type: - Ear Bonding at LASTI - February 2010 Gerardo Moreno et al. Installation
Suspensions
15 Mar 2010
T080108-v1 Notes on Lower Quad Installation at LASTI Gerardo Moreno et al. Subsystem Test
Installation
Suspensions
20 Jan 2010
E1000002-v1 Certification for Viton for L1 HAM6 OMC damping struts Robert Taylor et al. Commissioning
Incoming Inspection
Installation
Suspensions
Seismic Isolation
11 Jan 2010
D0902795-x0 aLIGO_Mezzanine_Lab_Floor_Layout Ken Mailand Installation
Auxiliary Optics
04 Dec 2009
D0901353-v1 Adv LIGO COC R Optic Container, Cover, Ring, Alum Box Rnd Jose Eduardo Chavez System Engineering
Installation
17 Jul 2009
G0900349-v4 The Present and Near Future of LIGO Jeffrey Kissel Commissioning
Meeting
Basic R&D
Upgrades
Installation
Final Design
15 Jul 2009
T000083-v1 COS Faraday Isolator Pre-alignment Procedure Michael Smith Installation
07 Jul 2009
F080008-v8 Advanced LIGO Inventory Database PO/Line Parts Import Template Dwayne Giardina et al. Commissioning
Quality Assurance
Procurements
Installation
Operations Business
10 Jun 2009
E0900131-v2 35 Watt Air Cooled Beam Dump Assembly Procedures Ken Mailand Installation
Auxiliary Optics
21 May 2009
D0901044-x0 BSC2_TABLE_RING_DIMENSIONS_ Ken Mailand Installation
Auxiliary Optics
20 May 2009
T980044-v1 Determination of Global and Local Coordinate Axes for the LIGO Sites Albert Lazzarini Vacuum
System Engineering
Integration
Installation
11 May 2009
D950148-v2 LVEA and VEA Foundations Relative to the Beam Tube Center Line Dennis Coyne Vacuum
System Engineering
Integration
Installation
10 May 2009
E0900126-v2 LLO HAM6 AFWFS installation Sam Waldman Sensing and Control
Installation
08 May 2009
T0900222-v1 CIT Sprayed First Contact & Charging Tests 5-6-09 Rand Dannenberg Core Optics
Installation
07 May 2009
T0900221-v1 CIT Sprayed First Contact Peeling & Charging Tests 5-3-09 Rand Dannenberg Core Optics
Installation
07 May 2009
D070569-v1 ELIGO OMC SUS Wiring Jay Heefner Installation
Suspensions
25 Feb 2009

Number of documents found: 104


DCC Version 3.4.2, contact DCC Help