G1200916-v1 |
Suspension systems for the AEI 10 m prototype |
Alan Cumming et al. |
Suspensions
Preliminary Design
|
05 Nov 2024 |
T1300595-v1 |
Estimate of thermal and seismic noise from aLIGO quad suspension blade springs |
Liam Cunningham et al. |
Basic R&D
Suspensions
|
08 Dec 2023 |
E1000278-v7 |
Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) |
Margot Hennig et al. |
Final Design
Suspensions
|
28 Aug 2012 |
T1000017-v1 |
Monolithic Test Hang Procedure Notes |
Matthew Maxwell et al. |
Subsystem Test
Suspensions
|
12 Apr 2017 |
D1000759-v3 |
Advanced LIGO SUS ETM Production Monolithic Assembly |
Russell Jones et al. |
Assembly
Suspensions
Final Design
|
12 Jul 2016 |
E1000752-v5 |
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) |
Margot Hennig et al. |
Suspensions
Installation
|
08 Mar 2016 |
D0902505-v9 |
Fiber Guard Assembly (Installation Instructions) |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
02 Apr 2014 |
D1102270-v1 |
captive 8-32 for fibre guard |
Liam Cunningham et al. |
Suspensions
|
02 Apr 2014 |
D1102150-v5 |
FIBRE GUARD INTERNAL SECTION TOP RIGHT SIDE |
Liam Cunningham |
Suspensions
|
02 Apr 2014 |
D1102149-v5 |
FIBRE GUARD INTERNAL SECTION LEFT SIDE |
Liam Cunningham |
Suspensions
|
02 Apr 2014 |
D1102148-v5 |
FIBRE GUARD INTERNAL SECTION RIGHT SIDE |
Liam Cunningham |
Suspensions
|
02 Apr 2014 |
D0902780-v3 |
Mass jack optic support block |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0902513-v4 |
Fibre guard angle section 5 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
12 Feb 2014 |
D0902511-v4 |
Fibre guard angle section 3 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
12 Feb 2014 |
D1002147-v1 |
aLIGO BS/FM Prism bonding jig |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Dec 2013 |
D1002153-v3 |
aLIGO BS/FM Prism holder |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Dec 2013 |
D1002149-v1 |
aLIGO BS/FM Prism bonding baseplate |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Nov 2013 |
D1002151-v3 |
aLIGO BS/FM Prism bonding support cylinder |
Marielle van Veggel et al. |
Installation
Suspensions
|
11 Nov 2013 |
E1000277-v13 |
Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) |
Marielle van Veggel et al. |
Suspensions
Final Design
|
25 Jul 2013 |
T0900369-v1 |
Removal of the ears and prisms at LASTI in July 2009 |
Liam Cunningham et al. |
Suspensions
Installation
|
17 Sep 2012 |
D0902507-v6 |
Fibre guard Main Body |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D1102152-v4 |
aLIGO SUS, FIBRE GUARD PTFE AWNING |
Liam Cunningham et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902519-v4 |
aLIGO SUS, Fibre guard angle section 11 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902518-v4 |
aLIGO SUS, Fibre guard angle section 10 |
Marielle van Veggel et al. |
Suspensions
Final Design
|
13 Feb 2012 |
D0902517-v4 |
aLIGO SUS,Fibre guard angle section 9 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902508-v5 |
aLIGO SUSFibre guard Separator |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902516-v4 |
aLIGO SUS,Fibre guard angle section 8 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902515-v3 |
Fibre guard angle section 7 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902514-v3 |
Fibre guard angle section 6 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902512-v6 |
Fibre guard angle section 4 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902510-v3 |
Fibre guard angle section 2 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D0902509-v3 |
Fibre guard angle section 1 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D0902506-v9 |
Fibre guard assembly |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D1102271-v2 |
aLIGO SUS, FIBER GUARD WINDOW COVER |
Liam Cunningham et al. |
Suspensions
Final Design
|
08 Feb 2012 |
D1102285-v3 |
replacement angle section 4 |
Liam Cunningham et al. |
Suspensions
Final Design
|
07 Feb 2012 |
D1001688-v2 |
Fibre removal tooling assembly |
Liam Cunningham et al. |
Suspensions
|
27 Jan 2012 |
D1001690-v3 |
Fibre_removal_blade |
Liam Cunningham et al. |
Suspensions
|
27 Jan 2012 |
D1001689-v1 |
Fibre_removal_t-mount |
Liam Cunningham et al. |
Suspensions
|
19 Oct 2011 |
D1001691-v2 |
Fibre_removal_spine |
Liam Cunningham et al. |
Suspensions
|
19 Oct 2011 |
D1001692-v1 |
Fibre_removal_crossbar |
Liam Cunningham et al. |
Suspensions
|
19 Oct 2011 |
D1001693-v1 |
Fibre_removal_crossbar_rod |
Liam Cunningham et al. |
Suspensions
|
19 Oct 2011 |
T1000345-v2 |
The Design of the IGR MKII Strength Testing Machine |
Russell Jones et al. |
Suspensions
Basic R&D
|
11 Oct 2011 |
D0900957-v1 |
ALIGO SUS ETM/ITM monolithic assembly - spring clamp for weld mirror on weld hub |
Giles Hammond et al. |
Preliminary Design
|
09 Sep 2011 |
D0901302-v4 |
Mass jack assembly |
Liam Cunningham |
Suspensions
|
11 Jul 2011 |
D1001747-v1 |
weld mirror handle |
Liam Cunningham et al. |
Suspensions
|
26 May 2011 |
D1002212-v3 |
Fibre bow linear stage interface |
Liam Cunningham et al. |
Suspensions
|
18 May 2011 |
G0900791-v1 |
Flame welding tests for monolithic suspension of a 40-kg test mass (as backup for Advanced LIGO) |
Giles Hammond et al. |
Suspensions
|
17 May 2011 |
D080389-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Bearing holder |
Russell Jones et al. |
Assembly
Suspensions
Fabrication
Preliminary Design
|
21 Apr 2011 |
D1001827-v1 |
fibre bow holder base |
Liam Cunningham et al. |
Suspensions
|
28 Mar 2011 |
D1000017-v3 |
Fibre storage rack - inner cross rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000018-v3 |
Fibre storage rack - horizontal tie bar |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000016-v3 |
Fibre storage rack - inner rib |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000015-v3 |
Fibre storage rack - long side rib |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000014-v3 |
Fibre storage rack - Cross rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000012-v3 |
Fibre storage rack - horizontal rail side 2 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000011-v3 |
Fibre storage rack - horizontal rail side 1 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000009-v3 |
Fibre storage rack - baseplate |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1002152-v1 |
aLIGO BS/FM Prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002150-x0 |
aLIGO BS/FM Prism bonding alignment guide |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002203-v2 |
aLIGO ERM Prism bonding baseplate |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002288-v1 |
aLIGO ERM prism bonding support cylinder |
Marielle van Veggel et al. |
Final Design
Suspensions
|
09 Mar 2011 |
D1002202-v2 |
aLIGO ERM Prism bonding fixture |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002201-v2 |
aLIGO ERM Prism bonding jig |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D0900373-v2 |
ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub |
Giles Hammond et al. |
Suspensions
Installation
Basic R&D
|
08 Mar 2011 |
D1000361-v1 |
fibre cutter clamping plate |
Liam Cunningham |
Suspensions
|
08 Mar 2011 |
D1000360-v1 |
fibre cutter slider upper |
Liam Cunningham |
Suspensions
|
08 Mar 2011 |
D1000359-v1 |
Slider Block Lower Side 2 |
Liam Cunningham |
Suspensions
|
08 Mar 2011 |
D1000358-v1 |
Slider Block Lower Side 1 |
Liam Cunningham |
Suspensions
|
08 Mar 2011 |
D1001957-v1 |
FIBRE CUTTING JIG FUSE END LOCATOR |
Liam Cunningham et al. |
Suspensions
|
08 Mar 2011 |
D1001787-v1 |
fibre bow spine |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1000362-v1 |
fibre bow shield plate |
Liam Cunningham |
Suspensions
|
07 Mar 2011 |
D1000363-v1 |
fibre bow spacer |
Liam Cunningham |
Suspensions
|
07 Mar 2011 |
D1002214-v1 |
Extract assembly cylindrical spacer |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D080390-v4 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_3-hole Plate |
Russell Jones et al. |
Fabrication
Assembly
Suspensions
Preliminary Design
|
07 Mar 2011 |
D080396-v4 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Micrometer Interface Boss |
Russell Jones et al. |
Suspensions
Assembly
Fabrication
Preliminary Design
|
07 Mar 2011 |
D080394-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Crossbar |
Russell Jones et al. |
Assembly
Suspensions
Fabrication
Preliminary Design
|
07 Mar 2011 |
D080393-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_C-section side piece |
Russell Jones et al. |
Fabrication
Assembly
Suspensions
Preliminary Design
|
07 Mar 2011 |
D1001823-v2 |
weld scaffold guide rod |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1001822-v1 |
weld scaffold baffle holder |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1001821-v1 |
weld scaffold straight baffle |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1001820-v1 |
weld scaffold curved baffle |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1002213-v2 |
Extract assembly L-section |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1001829-v1 |
fibre-bow holder L-bracket |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D1001828-v1 |
fibre bow holder spacer |
Liam Cunningham et al. |
Suspensions
|
07 Mar 2011 |
D070077-v2 |
Proof bounce tester top plate |
Russell Jones et al. |
Suspensions
|
01 Mar 2011 |
D1002105-v2 |
aLIGO SUS UK PROOF BOUNCE TESTER BASEPLATE |
Russell Jones et al. |
Suspensions
|
01 Mar 2011 |
D1002082-v1 |
aLIGO SUS UK PROOF TESTER |
Russell Jones et al. |
Suspensions
|
28 Feb 2011 |
D070075-v2 |
Proof bounce tester joint for clevis pin |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D1002071-v1 |
aLIGO SUS UK PROOF BOUNCE TESTER 15KG PROOF MASS |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D1002069-v1 |
aLIGO SUS UK PROOF BOUNCE TESTER DOOR |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D1002067-v1 |
aLIGO SUS UK PROOF BOUNCE TESTER ENCLOSURE |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D0901304-v2 |
Mass jack upper support plate |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0901305-v1 |
Mass jack guide angle |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0901306-v1 |
Mass jack optic support pad |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0901307-v1 |
Mass jack support channel |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0901308-v1 |
Mass jack linear bearing shaft |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0901309-v1 |
Mass jack linear bearing housing block |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D0901303-v2 |
Mass jack lower support plate |
Liam Cunningham |
Suspensions
|
25 Feb 2011 |
D1002291-v1 |
aLIGO TCP/ERM Prism holder fixing screw |
Marielle van Veggel et al. |
Suspensions
Installation
|
21 Oct 2010 |
D1002290-v1 |
aLIGO TCP/ERM Prism holder alignment bush |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
D1002289-v1 |
aLIGO TCP/ERM Prism holder alignment screw |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
E1000273-v1 |
Design document for PM wire break-off prisms |
Ken Strain et al. |
Final Design
Suspensions
|
02 Sep 2010 |
D1000013-v3 |
Fibre storage rack - fibre support crossbar |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
01 Sep 2010 |
D1000019-v3 |
Fibre storage rack - fibre support peg |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
01 Sep 2010 |
T1000472-v1 |
Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension |
Marielle van Veggel et al. |
Installation
Suspensions
|
26 Aug 2010 |
T080245-v1 |
ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI |
Russell Jones et al. |
Suspensions
Subsystem Test
|
13 Jul 2010 |
D1000008-v3 |
Fibre storage rack |
Giles Hammond et al. |
Suspensions
Preliminary Design
|
18 May 2010 |
D1000010-v3 |
Fibre storage rack - vertical support |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
18 May 2010 |
T0900629-v2 |
Response to questions from the review panel on the Final Design Review of the ETM/ITM ears |
Giles Hammond et al. |
Final Design
Suspensions
|
17 Dec 2009 |
T0900278-v2 |
ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 |
Giles Hammond et al. |
System Test
Suspensions
|
02 Jul 2009 |
G0900586-v1 |
Flame welding tests for monolithic suspensions of the mirrors of future GW interferometers. |
Giles Hammond et al. |
Suspensions
Basic R&D
|
19 Jun 2009 |
G0900507-v2 |
Overview of monolithic suspension work for Advanced LIGO |
Timothy Bodiya et al. |
Suspensions
Basic R&D
|
19 Jun 2009 |
T0900203-v2 |
Assembly procedure of monolithic part of the suspension for advanced LIGO |
Giles Hammond et al. |
Preliminary Design
|
09 Jun 2009 |
T0900211-x0 |
Welding tests at Glasgow (5-8 May 2009) |
Marielle van Veggel et al. |
Suspensions
Final Design
|
06 May 2009 |
T080091-x0 |
Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage |
Mark Barton et al. |
Document Migration
|
21 Apr 2008 |
T080041-x0 |
ALIGO NP-type - Report on prism bonding at LASTI on 11th -17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080023-x0 |
Test prism glueing on disc insert plates |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080020-x0 |
ALIGO NP-Type: Preparations of prism bonding at LASTI on 11th - 17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
D080077-x0 |
N-Ptype Reaction mass Wire Break Off |
Liam Cunningham |
Document Migration
|
21 Feb 2008 |
D080078-x0 |
N-Ptype Penultimate mass Wire Break Off |
Liam Cunningham |
Document Migration
|
21 Feb 2008 |
D080076-x0 |
N-Ptype break-off_holder |
Liam Cunningham |
Document Migration
|
21 Feb 2008 |
E070163-x0 |
Test report on A ears for Advanced LIGO NP-type monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
T070158-x0 |
Tooling-induced deformation of ears for Advanced LIGO monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
E070164-x0 |
Test report on flatness of B ears for Advanced LIGO NP-type monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |