Document List by Topic

These documents on Fabrication (subtopic of Activity) are available:
(List events on Fabrication)

LIGO-Number Title Author(s) Topic(s) Last Updated
E960050-v13 LIGO Vacuum Compatible Materials List Dennis Coyne Final Design
Fabrication
Vacuum
11 Sep 2024
E080031-v1 MIRROR BLANK MATERIAL, AdLIGO ITM MIRROR GariLynn Billingsley et al. Final Design
Fabrication
Core Optics
11 Mar 2024
E080047-v1 Mirror Blank Material, AdLIGO ETM Mirror Specification GariLynn Billingsley et al. Core Optics
Fabrication
Final Design
11 Mar 2024
D1000227-v10 CUSTOM CABLE V25M Benjamin Abbott et al. Fabrication
Seismic Isolation
23 Jul 2012
D1000234-v11 CUSTOM CABLE V25X-TBD (Assembly) Jay Heefner et al. Fabrication
Suspensions
01 Jun 2023
E960022-v25 LIGO Clean and Bake Methods and Procedures Betsy Weaver et al. Cleaning
Fabrication
Vacuum
03 May 2023
D1000220-v7 CUSTOM CABLE V25A-40 Emery Brown et al. Fabrication
Sensing and Control
Seismic Isolation
01 May 2012
E0900480-v6 FTIR Testing to Qualify Parts for LIGO UHV Service Dennis Coyne Fabrication
Vacuum
10 Jun 2022
D1000221-v6 CUSTOM CABLE V25A-100 Emery Brown et al. Fabrication
Seismic Isolation
12 Oct 2011
E010613-v2 Generic Requirements & Standards for Detector Subsystems Dennis Coyne Final Design
Fabrication
System Engineering
24 Feb 2021
D1000920-v2 CUSTOM CABLE V3A-135 Emery Brown et al. Seismic Isolation
Fabrication
13 Jul 2012
D1000919-v2 CUSTOM CABLE V3A-95 Emery Brown et al. Fabrication
Seismic Isolation
13 Jul 2012
D1000918-v3 CUSTOM CABLE V3A-70 Benjamin Abbott et al. Suspensions
Fabrication
13 Jul 2012
D1000218-v6 CUSTOM CABLE V3A -25 Benjamin Abbott et al. Seismic Isolation
Fabrication
05 Jul 2012
D1000222-v7 CUSTOM CABLE V25A-120 Benjamin Abbott et al. Fabrication
Seismic Isolation
31 May 2012
D970412-v1 BSC Overall Assembly, LIGO Vacuum Equipment Dennis Coyne Fabrication
Vacuum
16 Sep 2020
E080177-v2 RGA Test Qualification of components for the LIGO UHV Dennis Coyne Vacuum
Fabrication
System Engineering
15 Apr 2020
D080117-v1 Penultimate Mass, ETM Quad Russell Jones Final Design
Suspensions
Fabrication
14 Feb 2020
D1001036-v3 64 Channel Binary Input Printed Circuit Board Rich Abbott Fabrication
18 Mar 2011
D1001266-v3 64 Channel Binary Output Printed Circuit Board Rich Abbott Fabrication
System Engineering
18 Feb 2015
D1002062-v2 Front Panel for 64 Channel Binary Output Module Charles Osthelder Fabrication
27 Sep 2010
D1002055-v2 Front Panel for 64 Channel Binary Input Module Charles Osthelder Fabrication
27 Sep 2010
E970129-v2 Material, Process, Handling, and Shipping Specification for Welding Diaphragm Bellows Stephany Foley Fabrication
Seismic Isolation
27 Nov 2017
E080035-v1 Specification: Mirror Blank Material, Adv. LIGO Beamsplitter (BS) Mirror GariLynn Billingsley et al. Fabrication
Final Design
Core Optics
06 Nov 2015
D0902796-v4 Quad IQ Demodulator Chassis Rich Abbott et al. Fabrication
30 May 2014
D1000231-v7 Custom Cable V25T-36 v7, Dual QPD cable assembly Rich Abbott et al. Fabrication
Sensing and Control
06 Mar 2014
D1000708-v7 aLIGO TCS Hartmann Sensor Camera Spacer Plate Mindy Jacobson et al. Auxiliary Optics
Fabrication
Final Design
15 Jan 2014
E0900301-v3 IOO Faraday Isolator Assembly and Certification Procedures David Tanner et al. Detector
Fabrication
Input Optics
13 Dec 2011
D1000715-v4 TCS Hartmann Sensor Camera Mount Mindy Jacobson et al. Preliminary Design
Fabrication
Final Design
Auxiliary Optics
25 Jun 2013
D030025-v1 Screw, Socket Head Cap, #8-32 UNC-2A X 1 Long, Fully Threaded, Rounded End, Ag-Plated Derek Bridges Fabrication
System Engineering
09 Sep 2012
D1000225-v7 CUSTOM CABLE V25A-TBD (Various Lengths to be determined at manuf.) Benjamin Abbott et al. Sensing and Control
Fabrication
15 Aug 2012
D1002521-v4 CUSTOM CABLE V25G-90 Jay Heefner et al. Fabrication
Suspensions
13 Jul 2012
D1000236-v3 CUSTOM CABLE V25Z-60 Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000562-v5 CUSTOM CABLE V25AM-23-A Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000563-v5 CUSTOM CABLE V25AM-23-B Jay Heefner et al. Fabrication
Suspensions
13 Jul 2012
D1000564-v5 CUSTOM CABLE V25AM-33-A Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000566-v6 CUSTOM CABLE V25G Jay Heefner et al. Suspensions
Fabrication
13 Jul 2012
D1000565-v6 CUSTOM CABLE V25AM-33-B Jay Heefner et al. Suspensions
Fabrication
05 Jul 2012
D1000224-v5 CUSTOM CABLE V25D - v5 Rich Abbott et al. Fabrication
Sensing and Control
20 Jun 2012
D1000229-v4 CUSTOM CABLE V25P Jay Heefner et al. Fabrication
Suspensions
14 May 2012
D1000226-v2 CUSTOM CABLE V25F Benjamin Abbott et al. Fabrication
Seismic Isolation
03 May 2012
D0902619-v3 aLIGO_Manifold_Cryo_Baffle_Inner_Segment_Right Heidy Kelman Auxiliary Optics
Fabrication
02 Feb 2012
D1002030-v3 Front Panel for Quad I&Q Demodulator Module Charles Osthelder Fabrication
01 Feb 2012
D1000233-v3 CUSTOM CABLE V25W Emery Brown Sensing and Control
Fabrication
12 Oct 2011
D1000230-v3 CUSTOM CABLE V25R Emery Brown Fabrication
Suspensions
12 Oct 2011
E1000083-v6 Specification for Enameled Steel to be used in the LIGO Ultra-High Vacuum System Heidy Kelman et al. Auxiliary Optics
Fabrication
19 Aug 2011
C1000270-v7 aLIGO TCS CO2 Laser Provision SOW Mindy Jacobson Fabrication
Auxiliary Optics
Procurements
15 Jun 2011
E970130-v4 Material, Process, Handling and Shipping Specification for Fluorel Parts Dennis Coyne System Engineering
Fabrication
Vacuum
29 Mar 2011
D1001712-v2 I/O EXPANSION CHASSIS - FRONT PANEL Emery Brown Data Acquisition System
Fabrication
14 Jan 2011
C1001577-v5 SOW - Fabrication of HLTS Structures Derek Bridges et al. Fabrication
Suspensions
Procurements
19 Oct 2010
D1001722-v1 1U RACK CHASSIS WITH VENT HOLES Jay Heefner et al. Data Acquisition System
Fabrication
06 Oct 2010
E1000091-v1 BOM-aLIGO Manifold-Cryo Weldment Subassy, Right Heidy Kelman Auxiliary Optics
Fabrication
24 Sep 2010
E1000090-v1 BOM- aLIGO Manifold-Cryo Weldment Subassy, Left Heidy Kelman Auxiliary Optics
Fabrication
24 Sep 2010
E1000085-v1 BOM-aLIGO Manifold-Cryo Weldment Subassy, Bottom Heidy Kelman Auxiliary Optics
Fabrication
24 Sep 2010
C1001195-v5 Statement of Work - Quad I&Q RF Demodulator Rich Abbott et al. Fabrication
22 Sep 2010
E1000191-x0 DCN-SLC ARM CAVITY BAFFLE FOR LASTI Niem Nguyen Fabrication
Auxiliary Optics
21 Sep 2010
C1000894-v9 SOW for HAM Prisms Janeen Romie Fabrication
Suspensions
15 Sep 2010
C1001307-v2 SOW for Nickel Plating of HAM maraging steel blades Janeen Romie Fabrication
Suspensions
14 Sep 2010
C1001188-v1 Statement of Work Fabrication and Assembly of IO Expansion Chassis for Advanced LIGO Controls Jay Heefner Fabrication
Data Acquisition System
20 Jul 2010
D030021-v2 Screw, Socket Head Cap, 1/4-20 UNC-3A X 2.5 Long, Fully Threaded, Rounded End Derek Bridges System Engineering
Final Design
Fabrication
26 Aug 2010
D1002253-v1 BSC REPAIR ARM MATERIAL CUT LIST Scott Shankle Fabrication
23 Aug 2010
C1001360-v2 SOW for Manufacture of aLIGO TCS Ring Heater Upper & Lower Assembly Components Mindy Jacobson Vacuum
Final Design
Fabrication
Auxiliary Optics
19 Aug 2010
E060231-v1 Printed Circuit Checklist Prior To Manufacture Rich Abbott Fabrication
System Engineering
11 Aug 2010
T1000454-v1 Wiring Instructions for 64 Channel Binary Input and Output Modules Charles Osthelder Fabrication
10 Aug 2010
T1000455-v2 64 Channel Binary Output Charles Osthelder Fabrication
09 Aug 2010
D1002057-v1 Cable Assembly for 64 Channel Binary Input and Output Modules Charles Osthelder Fabrication
09 Aug 2010
T1000453-v3 Assembly Instruction for D0902796 (Quad Demodulator Module) Charles Osthelder Fabrication
05 Aug 2010
D1002033-v1 LED Wiring Connection for DC Regulator Board Charles Osthelder Fabrication
04 Aug 2010
D1000969-v2 aLIGO TCS Monolithic Ring Heater Shield Guido Mueller et al. Fabrication
Final Design
Auxiliary Optics
Preliminary Design
04 Aug 2010
D1000944-v2 ALIGO TEST MASS RING HEATER OUTER RING Mindy Jacobson et al. Preliminary Design
Auxiliary Optics
Final Design
Fabrication
26 Jul 2010
D1000943-v2 ALIGO TEST MASS RING HEATER INNER RING Mindy Jacobson et al. Preliminary Design
Vacuum
Fabrication
Auxiliary Optics
26 Jul 2010
C961213-v1 Technical Direction Memorandum 15 to CBI: DI Water Specification Dennis Coyne Vacuum
Fabrication
23 Jul 2010
D1001710-v1 I/O EXPANSION CHASSIS - SPOTWELD PANEL C Emery Brown Fabrication
Data Acquisition System
23 Jul 2010
D1001809-v1 aLIGO PSL/IO optical table leg Richard Savage Fabrication
Laser Systems
16 Jul 2010
D1001714-v1 I/O EXPANSION CHASSIS - TOP COVER Emery Brown Data Acquisition System
Fabrication
13 Jul 2010
D1001711-v1 I/O EXPANSION CHASSIS - SPOTWELD PANEL D Emery Brown Data Acquisition System
Fabrication
13 Jul 2010
D1001707-v1 I/O EXPANSION CHASSIS - REAR BOTTOM PANEL Emery Brown Fabrication
Data Acquisition System
13 Jul 2010
D1001706-v1 I/O EXPANSION CHASSIS - INTERNAL PANEL Emery Brown Fabrication
Data Acquisition System
13 Jul 2010
D1001705-v1 I/O EXPANSION CHASSIS - INTERNAL BRACKET Emery Brown Fabrication
Data Acquisition System
13 Jul 2010
D1001704-v1 I/O EXPANSION CHASSIS - I/O BRACKET Emery Brown Data Acquisition System
Fabrication
13 Jul 2010
D1001703-v1 I/O EXPANSION CHASSIS - BACK PANEL Emery Brown Data Acquisition System
Fabrication
13 Jul 2010
D1001702-v1 I/O EXPANSION CHASSIS - HANDLE BRACKET Emery Brown Data Acquisition System
Fabrication
13 Jul 2010
D1001724-x0 CHASSIS FAN MODULE SHIELD Emery Brown Fabrication
Data Acquisition System
08 Jul 2010
D1001723-x0 CHASSIS FAN MODULE Emery Brown Fabrication
Data Acquisition System
08 Jul 2010
D1001719-x0 I/O EXPANSION CHASSIS Emery Brown Data Acquisition System
Fabrication
08 Jul 2010
D1001718-x0 I/O EXPANSION CHASSIS Emery Brown Fabrication
Data Acquisition System
08 Jul 2010
D1001717-x0 I/O EXPANSION CHASSIS Emery Brown Fabrication
Data Acquisition System
08 Jul 2010
D1001716-x0 I/O EXPANSION CHASSIS Emery Brown Data Acquisition System
Fabrication
08 Jul 2010
D1001713-x0 I/O EXPANSION CHASSIS Emery Brown Data Acquisition System
Fabrication
08 Jul 2010
D1001708-x0 I/O EXPANSION CHASSIS Emery Brown Fabrication
Data Acquisition System
08 Jul 2010
D1000945-v2 ALIGO TEST MASS RING HEATER ASSEMBLY Mindy Jacobson et al. Preliminary Design
Fabrication
Final Design
Auxiliary Optics
15 Jun 2010
D1001016-v1 ALIGO TEST MASS RING HEATER WIRE PLATE Mindy Jacobson et al. Preliminary Design
Auxiliary Optics
Final Design
Fabrication
14 Jun 2010
D1000956-v1 ALIGO TEST MASS RING HEATER WIRE INTERSECTION BLOCK Mindy Jacobson et al. Auxiliary Optics
Final Design
Fabrication
Preliminary Design
14 Jun 2010
D1001489-v1 OPO SHV Plate Daniel Sigg et al. Fabrication
09 Jun 2010
D1001490-v1 SHG Front Panel Daniel Sigg et al. Fabrication
09 Jun 2010
F1000013-v1 Ear quality control sheets Marielle van Veggel Fabrication
Suspensions
27 Apr 2010
E1000108-v1 DCN - Manufacture Porcelain Coated Test Plates Heidy Kelman Auxiliary Optics
Fabrication
05 Apr 2010
T1000147-v1 TGG Crystal Wedge Angle for aLIGO Output Faraday Isolator Michael Smith Fabrication
Auxiliary Optics
17 Mar 2010
D1000569-x0 CUSTOM CABLE V25K Emery Brown Sensing and Control
Fabrication
15 Mar 2010
D1000567-x0 CUSTOM CABLE V25H Emery Brown Suspensions
Fabrication
15 Mar 2010
D0901751-v1 EOM Block Vertical 3" Optical Height Richard Savage Fabrication
10 Mar 2010
D0901750-v1 EOM Block Vertical 4" Optical Height Richard Savage Fabrication
10 Mar 2010
D0901748-v1 EOM Block Horizontal 3" Optical Height Richard Savage Fabrication
10 Mar 2010
D0901744-v1 Faraday Block 4" Optical Height Richard Savage Fabrication
10 Mar 2010
D1000232-v1 CUSTOM CABLE V25U Emery Brown Fabrication
Sensing and Control
02 Mar 2010
E970063-v1 LIGO Seismic Isolation System (SEI): Fabrication Process Specification Dennis Coyne Seismic Isolation
Vacuum
Fabrication
12 Feb 2010
E1000021-x0 CUSTOM CABLE V2A Emery Brown Sensing and Control
Fabrication
11 Feb 2010
T1000041-v1 Electrostatic Drive Soldering Procedure Richard Mittleman et al. Fabrication
01 Feb 2010
D1000240-x0 CUSTOM CABLE VC10B Emery Brown Fabrication
01 Feb 2010
E048225-v2 Process Specification for AdLIGO Seismic Isolation System In-Vacuum Mechanical Elements Fabrication Dennis Coyne Seismic Isolation
Fabrication
Final Design
30 Jan 2010
E960085-v2 Specification for O-Ring Procurement John Worden et al. Fabrication
Vacuum
22 Jan 2010
E1000012-x0 Material, Process, Handling, and Shipping Specification for Molded PEEK Parts Michael Meyer Vacuum
Fabrication
System Engineering
19 Jan 2010
T0900626-v1 LMA Computation of Surface E-Field Acheivable for Advanced LIGO ITM Rand Dannenberg Fabrication
Modelling
Core Optics
15 Dec 2009
E0900442-x0 Traveler HLTS Prototype Additional Helicoils (Batch 8) Derek Bridges Fabrication
Suspensions
01 Dec 2009
E950062-v1 Cleaning of Beam Tube Can Modules Dennis Coyne Fabrication
Vacuum
27 Oct 2009
E0900331-v1 DCN Updated R3 Coating Specification Rand Dannenberg Fabrication
Core Optics
06 Oct 2009
E0900233-v1 DCN for Radius of curvature change for SPR3, PR3, F-PR3 GariLynn Billingsley et al. Core Optics
Fabrication
11 Aug 2009
E070141-v1 DCN for ELi Septum Window Coating specification GariLynn Billingsley Fabrication
Vacuum
07 Aug 2009
E960159-v1 Specification for Viton Vacuum Bakeout, LIGO Vacuum Equipment - Hanford and Livingston Dennis Coyne Vacuum
Fabrication
17 Jul 2009
D0901211-v1 AdvLIGO COC ETM Optic Container Base, Ring, Jose Eduardo Chavez System Engineering
Fabrication
17 Jul 2009
C962778-v1 Report of Materials Analysis: Analysis of Three Liquid Samples for Nonvolatile Residue Content. Analysis of Nonvolatile Portion of "Mirachem from Scrubber" for Comparison to the Residues Dennis Coyne Fabrication
Vacuum
09 Jul 2009
E960046-v1 Specification for Cleaning Procedure for LIGO Vacuum Equipment (PSI) Dennis Coyne Vacuum
Fabrication
09 Jul 2009
E080041-v1 Specification: Mirror Blank Material, Adv. LIGO Recycling Mirror 3 GariLynn Billingsley et al. Core Optics
Final Design
Fabrication
12 May 2009
E080045-v1 Specification: Blank Material, Adv. LIGO Folding Mirror GariLynn Billingsley et al. Final Design
Fabrication
Core Optics
12 May 2009
E080037-v1 Specification: Blank Material, Adv. LIGO Compensation Plate GariLynn Billingsley et al. Final Design
Fabrication
Core Optics
12 May 2009
E0900132-x0 DCN for initial release of Core Optic Coating Specifications for Adv. LIGO Dennis Coyne Core Optics
Change Control
Fabrication
Final Design
12 May 2009
D030027-x0 Screw, Socket Head Cap, #8-32 UNC-2A X 2 Long, Fully Threaded, Rounded End, Ag-Plated Derek Bridges et al. Document Migration
Fabrication
System Engineering
08 May 2009
D030026-x0 Screw, Socket Head Cap, #8-32 UNC-2A X 1.75 Long, Fully Threaded, Rounded End, Ag-Plated Derek Bridges et al. Document Migration
Fabrication
System Engineering
08 May 2009
D030024-x0 Screw, Socket Head Cap, #8-32 UNC-2A X 0.375 Long, Fully Threaded, Rounded End, Ag-Plated Derek Bridges et al. Document Migration
Fabrication
System Engineering
08 May 2009
T0900186-v1 Optical Dark Field Microscopy with First Contact Rand Dannenberg Fabrication
Reports
Core Optics
Other data analysis
07 May 2009
C0900025-v1 LIGO Review of 'Compliance to LIGO Modifications on GS-13' Brian Lantz Fabrication
Seismic Isolation
26 Feb 2009
E080446-v1 DCN - HAM Large Triple Suspension Structure Derek Bridges Fabrication
Suspensions
03 Apr 2009
E080112-v1 Component Specification: ITM Penultimate Mass Russell Jones Final Design
Suspensions
Fabrication
16 Mar 2009
E080090-v1 Component Specification: ETM Penultimate Mass Russell Jones Fabrication
Suspensions
Final Design
16 Mar 2009
D080128-v1 Penultimate Mass, ITM Quad Russell Jones Final Design
Fabrication
Suspensions
16 Mar 2009

Number of documents found: 135


DCC Version 3.5.0, contact DCC Help