D1003141-v3 |
Rack and Cable Tray Layout, LVEA, L1 |
Dennis Coyne et al. |
Observatory Facilities
System Engineering
|
30 Aug 2024 |
D1600167-v1 |
Accuglass_25D-5CX-450 |
Carl Adams |
Fabrication
|
09 Aug 2024 |
E1100337-v2 |
Suspension Electronics Drawing Tree |
Carl Adams |
Suspensions
Installation
|
07 Aug 2013 |
D1100303-v1 |
aLIGO Production PUM Coil Driver Chassis Top Assembly Drawing |
Carl Adams |
Suspensions
|
25 Apr 2024 |
D0900900-v2 |
aLIGO Production UK 4 Channel Satellite Amplifier (SatAmp) Chassis Assembly Drawing |
Ron Cutler et al. |
Suspensions
Installation
|
22 Aug 2023 |
D1500464-v1 |
ITM ESD SYSTEM WIRING DIAGRAM |
Carl Adams et al. |
Suspensions
Fabrication
|
08 Jun 2016 |
D1700384-v10 |
Squeezer System Wiring Drawing |
Rich Abbott et al. |
Squeezer
|
01 Oct 2019 |
D1001782-v1 |
aLIGO Production Quad Top Coil Driver Chassis Top Assembly Drawing |
Carl Adams |
Suspensions
|
27 Sep 2022 |
D1500310-v3 |
Rear Panel for DC Power Supply Voltage and Current Monitoring Chassis |
Carl Adams |
Fabrication
|
18 Mar 2021 |
D1500311-v3 |
Front Panel for DC Power Supply Voltage and Current Monitoring Chassis |
Carl Adams |
Fabrication
|
18 Mar 2021 |
D1600159-v1 |
DC Power Supply Voltage and Current Monitoring Interface |
Carl Adams |
Fabrication
|
18 Mar 2021 |
E1900071-v1 |
ECR: High Voltage ESD E3704, add LP filter to reduce bias noise due to DAC noise |
Carl Adams et al. |
Data Acquisition System
|
26 Feb 2020 |
S1105375-v7 |
L1-SUS-C5 ITM & BS RACK |
Carl Adams |
Installation
|
24 Jun 2014 |
S1500039-v1 |
L1-ETR-05 |
Carl Adams |
Seismic Isolation
Subsystem Test
|
03 Feb 2020 |
S1104358-v10 |
L1-SUS-C4 HAM2 |
Carl Adams |
Installation
|
01 Nov 2013 |
D1400301-v15 |
ETM and ITM ESD Low Voltage Driver Block Diagrams |
Rich Abbott et al. |
Sensing and Control
|
04 Oct 2018 |
S1201194-v2 |
L1-ISC-R3 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1201189-v2 |
L1-ISC-C4 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1201188-v2 |
L1-ISC-C3 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1201187-v4 |
L1-ISC-C2 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1201186-v5 |
L1-ISC-C1 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1104062-v12 |
L1-SUS-C1 HAM3-4 |
Carl Adams |
Installation
|
28 Oct 2015 |
S1105378-v12 |
L1-SUS-C8 HAM5-6 RACK |
Carl Adams |
Installation
|
01 Nov 2013 |
S1105377-v7 |
L1-SUS-C7 HAM5-6 |
Carl Adams |
Installation
|
23 Jan 2014 |
S1105376-v7 |
L1-SUS-C6 ITM & BS Rack |
Carl Adams |
Installation
|
20 Mar 2015 |
S1104357-v7 |
L1-SUS-C3 HAM2 |
Carl Adams |
Installation
|
01 Nov 2013 |
S1104356-v9 |
L1-SUS-C2 HAM3-4 |
Carl Adams |
Installation
|
01 Nov 2013 |
S1201196-v2 |
L1-ISC-R5 |
Rich Abbott et al. |
Installation
|
24 Nov 2014 |
S1201195-v5 |
L1-ISC-R4 |
Rich Abbott et al. |
Installation
|
21 May 2014 |
S1201193-v2 |
L1-ISC-R2 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1201192-v2 |
L1-ISC-R1 |
Rich Abbott et al. |
Installation
|
20 May 2014 |
S1500038-v1 |
L1-ETR-06 |
Carl Adams |
Seismic Isolation
Subsystem Test
|
11 Oct 2016 |
E1600212-v2 |
Clean Room Electrical Inspection Procedure |
Paul Corban et al. |
Safety
Operations
|
21 Jul 2016 |
F1600005-v1 |
CLEAN ROOM ELECTRICAL INSPECTION CHECKLIST |
Paul Corban et al. |
Operations
Safety
|
20 Jul 2016 |
M1600168-v1 |
Hipot testing procedure for Withstand testing of HV coax cabling using the Vitrek 955i Electrical Safety Analyzer: |
Carl Adams et al. |
System Test
|
01 Jun 2016 |
E1200775-x0 |
L1 LLO Flange Layout Document Tree |
Carl Adams |
Installation
|
21 Apr 2016 |
T1000091-v2 |
Semiconductor Cleaning for In-vacuum Applications |
Rich Abbott et al. |
Assembly
Sensing and Control
|
22 Mar 2016 |
D1500176-v1 |
aLIGO AA/BP Chassis Top Assembly Drawing |
Carl Adams et al. |
Fabrication
|
29 Jan 2016 |
D1500177-v1 |
aLIGO 18-bit AI/BP Chassis Top Assembly Drawing (2xDB15, 1xDB9 Version) |
Carl Adams et al. |
Fabrication
|
28 Jan 2016 |
E1600015-v2 |
LLO Post-O1 Electronics Work |
Carl Adams |
Operations
|
14 Jan 2016 |
D0902668-v3 |
aLIGO Production UIM Coil Driver Chassis Top Assembly Drawing |
Carl Adams et al. |
Suspensions
|
09 Dec 2015 |
E1200408-v17 |
Vertex ISC Electronics Cables Pull Table |
Carl Adams et al. |
Sensing and Control
Installation
|
19 Nov 2015 |
D070481-v5 |
Production UIM Coil Driver Board |
Carl Adams et al. |
Suspensions
|
02 Sep 2015 |
D1500260-v1 |
ESD Pressure Interlock Box - Back Panel |
Carl Adams |
Fabrication
|
26 Aug 2015 |
D1500242-v1 |
Front Panel for aLIGO PEM 18 Bit AI Chassis D1200316 |
Carl Adams |
Fabrication
|
26 Aug 2015 |
D1500259-v1 |
ESD Pressure Interlock Box - Front Panel |
Carl Adams |
Fabrication
|
26 Aug 2015 |
D1500243-v1 |
Back Panel for aLIGO PEM 18 Bit AI Chassis D1200316 |
Carl Adams |
Fabrication
|
12 Aug 2015 |
T1500315-v1 |
PI Band Pass Filter Test Procedure |
Carl Adams et al. |
Fabrication
|
03 Aug 2015 |
D1500172-v1 |
PI Band Pass Filter |
Carl Adams et al. |
Fabrication
|
31 Jul 2015 |
D1100304-v1 |
aLIGO Production OMC Top Coil Driver Chassis Top Assembly Drawing |
Carl Adams |
Suspensions
|
08 Mar 2015 |
E1300151-v4 |
End Station ISC Electronics Cables Pull Table |
Stephen Baker et al. |
Sensing and Control
Installation
|
14 Jan 2015 |
T1200379-v3 |
Power-Strip-Level DC Supply Sequencer Test Data |
Carl Adams |
Fabrication
|
11 Dec 2014 |
D1201129-v5 |
CERX Rack TCS-XC1 |
David Kinzel et al. |
Installation
|
19 Nov 2014 |
D1201091-v2 |
CERY Rack ISC-YC1 |
David Kinzel et al. |
Installation
|
19 Nov 2014 |
D1201084-v2 |
CERX Rack ISC-XC1 |
David Kinzel et al. |
Installation
|
19 Nov 2014 |
E1400220-x0 |
LLO ISC Electronics Racks |
Rich Abbott et al. |
Sensing and Control
|
07 May 2014 |
D1400108-v1 |
Gate Valve Controller Schematic |
Rich Abbott et al. |
Vacuum
Final Design
|
25 Apr 2014 |
D1200975-v1 |
CER Rack ISC-C2 |
Carl Adams et al. |
Installation
Sensing and Control
|
12 Dec 2013 |
T080062-v2 |
UK Satellite Amplifier Test Plan |
Jay Heefner et al. |
System Test
Suspensions
|
18 Sep 2013 |
E1300677-v1 |
SUS Chassis Count per IFO |
Carl Adams |
Installation
|
27 Aug 2013 |
T1200083-v1 |
aLIGO Kepco DC Power Supply Acceptance Testing Scripts |
Carl Adams |
Incoming Inspection
|
16 Apr 2012 |
G1200043-v3 |
First Measurements of Power Supplies |
Carl Adams et al. |
Installation
|
25 Jan 2012 |
D1100508-x0 |
aLIGO_TMS_Tele_Inputside_Alignment_Tool_Assem |
Carl Adams |
Final Design
Auxiliary Optics
|
18 Mar 2011 |