D0901749-v4 |
3/4" Diameter Optics Post |
Richard Savage |
Fabrication
Sensing and Control
Operations
Conceptual Design
Input Optics
|
27 Feb 2023 |
R1300028-v2 |
Change Request for Secondary Power feed to LHO |
Richard McCarthy |
Operations
Operations Liens List
Change Control
|
07 Jan 2014 |
R1300030-v1 |
Vacuum Control System Upgrade Change Request |
Richard McCarthy et al. |
Operations
Operations Liens List
Upgrades
Vacuum
|
18 Dec 2013 |
S1202956-v1 |
L1-DAQ-YC1 |
David Kinzel et al. |
Operations
System Engineering
|
12 Dec 2013 |
S1202949-v4 |
L1-DAQ-XC1 |
David Kinzel et al. |
Operations
Data Acquisition System
|
12 Dec 2013 |
G1300808-v1 |
Operations Sparing Plan Approach |
Dennis Coyne |
System Engineering
Operations
|
11 Dec 2013 |
D1200782-v2 |
aLIGO TCS CO2 Laser and Shutter Assembly |
Mindy Jacobson et al. |
Assembly
Installation
Subsystem Test
Operations
Auxiliary Optics
|
19 Nov 2013 |
S1202954-x0 |
L1-SUS-YC2 |
David Kinzel |
System Engineering
Operations
|
16 Oct 2013 |
T1300622-v1 |
Vibration / Shake Tables FOR SUSPENSION AND STRUCTURE TESTING |
Ken Mailand et al. |
Core Optics
Operations
|
12 Jul 2013 |
C1301598-v2 |
Invitation To Bid for the LIGO Hanford Re-roof |
Rudy Arvizu et al. |
Operations
Procurements
|
10 May 2013 |
E1200366-v1 |
Shutter Controller Count |
Daniel Sigg |
Operations
Sensing and Control
|
27 Nov 2012 |
S1203493-v1 |
L1-MSR-07 IFO Front End Computers |
David Kinzel |
Operations
System Engineering
|
10 Oct 2012 |
S1203497-v1 |
L1-MSR-11 General Computing |
David Kinzel |
System Engineering
Operations
|
10 Oct 2012 |
S1203499-v1 |
L1-MSR-13 UPS for IFO and CDS Computers Rack |
David Kinzel |
System Engineering
Operations
|
10 Oct 2012 |
S1202957-x0 |
L1-FAC-YC1 |
David Kinzel |
System Engineering
Operations
|
08 Aug 2012 |
S1202950-x0 |
L1-FAC-XC1 |
David Kinzel |
System Engineering
Operations
|
08 Aug 2012 |
E1200364-v1 |
Shutter Controller Specifications |
Daniel Sigg |
Operations
Sensing and Control
|
10 Apr 2012 |
E1200360-v1 |
Picomotor Controller Specifications |
Daniel Sigg |
Sensing and Control
Operations
|
10 Apr 2012 |
E1200354-x0 |
aLIGO, Slow Controls, Concentrators, Serial Ports |
Daniel Sigg |
Sensing and Control
Operations
|
10 Apr 2012 |
T1200079-x0 |
LLO Beam Tube Enclosure Inspection Report |
Michael Meyer |
Operations
Vacuum
|
10 Feb 2012 |
E1100983-x0 |
DCN, Custom Parts, aLIGO TCS VIEWPORT ENCLOSURE ASSEMBLY, H2 CO2 LASER PROJECTION |
Mindy Jacobson |
Vacuum
Fabrication
Final Design
Operations
Auxiliary Optics
|
04 Oct 2011 |
D1101361-v1 |
TMS Tooling Telescope I-P Alignment Mirror Assembly |
Craig Conley |
Auxiliary Optics
Operations
|
05 Aug 2011 |
M990034-v2 |
OBSOLETE |
Richard Savage et al. |
Policies
Operations
Observatory Facilities
|
01 Aug 2011 |
D1101362-v1 |
TMS Tooling Fixture Clamp |
Craig Conley |
Auxiliary Optics
Operations
|
27 Jul 2011 |
M1000328-x0 |
LLO TCS LVEA Alignment SOP |
David Kinzel et al. |
Laser Systems
Safety
Operations
|
14 Oct 2010 |
M1000331-x0 |
LLO 100W HPLF Laser Destructive Testing SOP |
Rupal Amin et al. |
Safety
Laser Systems
Operations
|
14 Oct 2010 |
M1000330-x0 |
LLO 100W HPLF High Power Alignment SOP |
David Kinzel et al. |
Operations
Laser Systems
Safety
|
14 Oct 2010 |
G0900674-v1 |
Gravity Waves: Next Window on the Universe |
Thomas Nash et al. |
Operations
Stochastic
Compact Binaries
Continuous Wave
Astrophysics / Multi-messenger
GW Bursts
Detector
|
25 Aug 2009 |