Document List by Author

Benjamin Abbott of LIGO - California Institute of Technology is listed as an author on the following documents:
(List events moderated by Benjamin Abbott)

LIGO-Number Title Author(s) Topic(s) Last Updated
E1500252-v1 TMDS - Basic Operation Procedure (Switch on and shutdown) Benjamin Abbott et al. Operations
Vacuum
System Engineering
06 Jun 2015
T1500282-v1 Needle samples from TMDS - Contamination Calum Torrie et al. System Engineering
04 Jun 2015
T1500269-v1 Comparing the TMDS system using a straight pipe nipple with an elbow. Benjamin Abbott Core Optics
29 May 2015
D1200614-v2 aLIGO TCS SLED Driver Chassis Benjamin Abbott Auxiliary Optics
11 May 2015
D1001752-v2 AdLIGO LLO Huddle Test Stand Schematics Benjamin Abbott Seismic Isolation
13 Jul 2010
D0901301-v10 BSC SEI System Schematic Benjamin Abbott Seismic Isolation
24 Oct 2013
D1000298-v6 aLIGO HAMs 4&5 ISI System schematics Benjamin Abbott Seismic Isolation
21 Feb 2013
D1101576-v10 aLIGO HAMs 2&3 ISI System Wiring Benjamin Abbott Seismic Isolation
31 Mar 2015
D1101584-v6 aLIGO HAMs 1&6 ISI System Wiring Benjamin Abbott Seismic Isolation
21 Feb 2013
E1200842-v1 HWS Cable Specifications Benjamin Abbott et al. Final Design
Auxiliary Optics
10 Mar 2015
E1400389-v1 Fast Shutter PSoC Test Code Rich Abbott et al. Sensing and Control
25 Feb 2015
T1300173-v1 SEI Electronics Document Hub Benjamin Abbott Seismic Isolation
29 Jan 2015
D020373-v2 8 Channel Valve Driver Board Benjamin Abbott Seismic Isolation
07 May 2009
D1100202-v1 aLIGO HEPI Anti-Image Chassis Adapter Board Benjamin Abbott Seismic Isolation
02 Feb 2011
D070527-x0 DC Power Filter Board Benjamin Abbott System Engineering
08 Dec 2008
D070041-x0 GS-13/L4C Emulator Benjamin Abbott Seismic Isolation
Document Migration
01 Jun 2010
D1000057-v1 aLIGO Capacitive Position Sensor Interface Board Benjamin Abbott Seismic Isolation
10 Feb 2010
D1000749-v2 Trillium 240 Interface Benjamin Abbott Seismic Isolation
28 Apr 2011
D1102165-v1 Pump Servo SBC Power Board Benjamin Abbott Seismic Isolation
07 Nov 2011
D1101839-v1 HEPI Pressure Preamp Benjamin Abbott Seismic Isolation
17 Jan 2012
D080521-v3 HEPI Pier Interface Module Benjamin Abbott Seismic Isolation
18 Aug 2009
D0901559-v1 AdL HEPI Pump Servo schematic Benjamin Abbott Seismic Isolation
09 Feb 2010
D1002739-v1 aLIGO L4C Interface Board Benjamin Abbott Seismic Isolation
01 Dec 2010
E1100730-v5 HAM and BSC SEI In-Vacuum Cabling Counts including payload cables as well as BSC SLC ACB and BSC TCS Calum Torrie et al. System Engineering
18 Jun 2014
D1200101-v5 Hartmann / ALS Table Panel Benjamin Abbott et al. Auxiliary Optics
04 Jun 2014
T1400267-v1 Fast Shutter State Diagram Rich Abbott et al. Sensing and Control
04 Apr 2014
D1000657-v5 TCS Hartmann Sensor Assembly Mindy Jacobson et al. Assembly
Auxiliary Optics
22 Nov 2013
E1100876-x0 aLIGO SEI Electronics Testing Reports and Procedures Benjamin Abbott et al. Seismic Isolation
Subsystem Test
18 Dec 2013
T1100503-v3 Trillium in-pod cable test procedure Benjamin Abbott Seismic Isolation
30 May 2013
T050260-x0 LSC Demodulator Linearity Measurements Benjamin Abbott et al. Document Migration
06 Dec 2005
D1201133-v1 Housing, aLIGO TCS CO2 Laser Photodiode Preamp Board Mindy Jacobson et al. Assembly
Preliminary Design
Laser Systems
Auxiliary Optics
17 Aug 2012
D1201141-v1 Cover, aLIGO TCS CO2 Laser PD Preamp Assembly Mindy Jacobson et al. Assembly
Preliminary Design
Auxiliary Optics
31 Aug 2012
D1201142-v1 Base, aLIGO TCS CO2 Laser PD Preamp Assembly Mindy Jacobson et al. Assembly
Preliminary Design
Auxiliary Optics
17 Aug 2012
D1201065-v1 aLIGO CO2P HgCdTe photodetector mount/preamp assembly Benjamin Abbott et al. Final Design
Auxiliary Optics
20 Aug 2012
D1201148-v1 Pcal system schematics Benjamin Abbott Auxiliary Optics
11 Oct 2012
D1201343-v1 Capacitive Position Sensor Voltage Regulator Board Cables Benjamin Abbott Seismic Isolation
27 Sep 2012
D1200814-v2 H2 Single YArm TCS System Schematics Benjamin Abbott Auxiliary Optics
07 Sep 2012
D1201169-v1 Pin Insulator, aLIGO TCS CO2P PhotoDiode Mindy Jacobson et al. Assembly
Preliminary Design
Auxiliary Optics
17 Aug 2012
D1000225-v7 CUSTOM CABLE V25A-TBD (Various Lengths to be determined at manuf.) Benjamin Abbott et al. Sensing and Control
Fabrication
15 Aug 2012
T1200365-v3 aLIGO HEPI Pier Interface Chassis Test Procedure Benjamin Abbott Seismic Isolation
13 Aug 2012
T1200377-v1 aLIGO HEPI Pump Servo Startup Procedure Benjamin Abbott Seismic Isolation
30 Jul 2012
D1000227-v10 CUSTOM CABLE V25M Benjamin Abbott et al. Seismic Isolation
Fabrication
23 Jul 2012
D1100152-v8 CUSTOM CABLE SPECIFICATION - V25A-110 Benjamin Abbott et al. Seismic Isolation
Fabrication
23 Jul 2012
D1100150-v4 CUSTOM CABLE SPECIFICATION V3A-40 Benjamin Abbott et al. Seismic Isolation
Fabrication
23 Jul 2012
D1100151-v4 CUSTOM CABLE SPECIFICATION V3A-60 Emery Brown et al. Seismic Isolation
Fabrication
23 Jul 2012
D1100148-v4 CUSTOM CABLE SPECIFICATION V3B-80 Emery Brown et al. Seismic Isolation
Fabrication
23 Jul 2012
D1000918-v3 CUSTOM CABLE V3A-70 Benjamin Abbott et al. Fabrication
Suspensions
13 Jul 2012
D1000919-v2 CUSTOM CABLE V3A-95 Emery Brown et al. Seismic Isolation
Fabrication
13 Jul 2012
D1000920-v2 CUSTOM CABLE V3A-135 Emery Brown et al. Seismic Isolation
Fabrication
13 Jul 2012
D1000218-v6 CUSTOM CABLE V3A -25 Benjamin Abbott et al. Seismic Isolation
Fabrication
05 Jul 2012
D1000224-v5 CUSTOM CABLE V25D - v5 Rich Abbott et al. Sensing and Control
Fabrication
20 Jun 2012
D1200888-v1 LASTI HEPI DAC Interface Chassis Benjamin Abbott Seismic Isolation
11 Jun 2012
D1000222-v7 CUSTOM CABLE V25A-120 Benjamin Abbott et al. Seismic Isolation
Fabrication
31 May 2012
D1000226-v2 CUSTOM CABLE V25F Benjamin Abbott et al. Seismic Isolation
Fabrication
03 May 2012
D1000221-v7 CUSTOM CABLE V25A-100 Benjamin Abbott et al. Seismic Isolation
Fabrication
01 May 2012
D1000220-v7 CUSTOM CABLE V25A-40 Emery Brown et al. Sensing and Control
Seismic Isolation
Fabrication
01 May 2012
D1200192-v1 40m PSL Laser Enclosure Interlock Wiring Benjamin Abbott Laser Systems
02 Feb 2012
T1000168-v1 aLIGO GS-13 Pre-Amp Test Procedure Benjamin Abbott Seismic Isolation
30 Mar 2010
D1100155-v4 CUSTOM CABLE SPECIFICATION - V25Q-120 Emery Brown et al. Seismic Isolation
Fabrication
12 Oct 2011
D1100154-v4 CUSTOM CABLE SPECIFICATION - V25Q-48 Emery Brown et al. Seismic Isolation
Fabrication
12 Oct 2011
D1100153-v4 CUSTOM CABLE SPECIFICATION - V25A-80 Emery Brown et al. Seismic Isolation
Fabrication
12 Oct 2011
D1101850-v1 HEPI Valve Cable Drawing Benjamin Abbott Seismic Isolation
27 Sep 2011
C1105931-v4 SOW for SI-134g In-vacuum cables Alan Wilkins et al. Procurements
21 Sep 2011
S1105160-v1 LHO ISI Test Stand Results Benjamin Abbott Seismic Isolation
16 Sep 2011
T1100488-v1 aLIGO BSC Internal Seismic Isolation Test Plan Benjamin Abbott Seismic Isolation
16 Sep 2011
T1100453-v1 Ham 2&3 System Test Plan Benjamin Abbott Seismic Isolation
22 Aug 2011
D1100920-v1 Trillium In-Pod Cable Assembly Benjamin Abbott Seismic Isolation
17 May 2011
T1100264-v1 Evaluation of Cable Crosstalk and Shielding Rich Abbott et al. Installation
System Engineering
12 May 2011
L0900118-v8 Advanced LIGO Preliminary Design Review of the BSC ISI system Fabrice Matichard et al. Seismic Isolation
Preliminary Design
Reviews
04 May 2011
D980454-x0 RF Photodiode Benjamin Abbott et al. Document Migration
10 Aug 2005
C1001777-v2 SI-263 SOW for ISI Coil Driver Assembly Benjamin Abbott Procurements
22 Oct 2010
C1001705-v3 SOW for SI-134d Fabrication of Vacuum Cables for aLIGO HAM-ISI, ISC and SUS Subsystems Benjamin Abbott Procurements
28 Sep 2010
T1000372-v2 Files for the fabrication of 80 ISI Coil Driver Chassis Samuel Abbott et al. Seismic Isolation
24 Sep 2010
D1001673-v2 ISI Coil Driver fabrication drawings and Images Samuel Abbott et al. Seismic Isolation
24 Sep 2010
D1001412-v5 aLIGO HAM ISI Test Stand System Schematics Benjamin Abbott Seismic Isolation
16 Aug 2010
T1000277-v1 aLIGO HAM ISI Test Stand Test Plan Benjamin Abbott Seismic Isolation
02 Jun 2010
C1000398-v3 Statement of Work - Fabrication of Custom In-Vacuum Cables V25M Alan Wilkins et al. Seismic Isolation
Procurements
19 May 2010
G1000411-v3 aLIGO BSC ISI Electronics FDR Talk Benjamin Abbott Seismic Isolation
29 Apr 2010
G1000412-v1 BSC Electronics review Calculation Slides Brian Lantz et al. Final Design
Seismic Isolation
29 Apr 2010
T1000182-v1 ECO for the GS-13 Socket Board Benjamin Abbott Seismic Isolation
07 Apr 2010
D1000473-v1 HEPI L4C Cable Benjamin Abbott Seismic Isolation
02 Mar 2010
D0901337-v1 8 Channel Valve driver Internal Wiring Harnesses Benjamin Abbott Seismic Isolation
09 Feb 2010
D1000296-v1 aLIGO HEPI System Schematics Benjamin Abbott Seismic Isolation
09 Feb 2010
D0902779-v1 HAM ISI GS-13 In-Pod cable. Benjamin Abbott Seismic Isolation
03 Dec 2009
T0900558-v1 Reading out a Trillium 240 With an STS-2 Interface Chassis Benjamin Abbott Seismic Isolation
02 Nov 2009
D080114-v1 HAM ISI Wiring System Benjamin Abbott Seismic Isolation
31 Jul 2009
D070164-v1 ISI Interface Chassis - Block Diagram Benjamin Abbott Seismic Isolation
31 Jul 2009
T0900346-v2 STS-2 Interface Chassis Test Procedure Benjamin Abbott Seismic Isolation
29 Jul 2009
D0901338-v1 8-Ch Valve Driver Manufacturing Drawings Benjamin Abbott Seismic Isolation
21 Jul 2009
T0900317-v1 8 Ch Valve Driver Manufacturing Documents Benjamin Abbott Seismic Isolation
21 Jul 2009
D0900316-v1 ELIGO ISI and OMC SUS Controls Block Diagram Jay Heefner et al. Final Design
Seismic Isolation
Suspensions
25 Feb 2009
D030452-x0 Intensity Servo Remote Photodiode Head Benjamin Abbott Document Migration
06 May 2008
G070904-x0 The HAM-SAS Seismic Isolation System for the Advanced LIGO Interferometers Benjamin Abbott et al. Document Migration
05 Mar 2008
G070695-x0 Optical bench Seismic Isolation System (SAS) Prototyped for the HAM chambers of the Advanced LIGO Interferometers - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany Benjamin Abbott et al. Document Migration
29 Oct 2007
D070102-x0 STS-2 Breakout Box Benjamin Abbott Document Migration
08 Oct 2007
D060511-x0 LVDT In-Vac Breakout Board Benjamin Abbott Document Migration
08 Oct 2007
D060509-x0 HAM-SAS LVDT Interface Board Benjamin Abbott Document Migration
08 Oct 2007
D070061-x0 GS-13/L4C Controller Board Benjamin Abbott Document Migration
08 Oct 2007
D060529-x0 LASTI HAM-SAS Wiring 1 Benjamin Abbott Document Migration
08 Oct 2007
D060507-x0 HAM-SAS Stepper motor Interface Benjamin Abbott Document Migration
08 Oct 2007
D060506-x0 HAM-SAS Guralps Seismometer Interface Benjamin Abbott Document Migration
08 Oct 2007
D060505-x0 HAM-SAS Coil Driver Interface Benjamin Abbott Document Migration
08 Oct 2007
D060214-x0 QPD Whitening Interface Chassis Benjamin Abbott Document Migration
08 Oct 2007
G070628-x0 The SAS primary Seismic Attenuation System for Advanced LIGO’s Optical Benches Benjamin Abbott et al. Document Migration
21 Sep 2007
T070027-x0 GS-13_L4-C Emulation Module Design Document Benjamin Abbott Document Migration
18 Sep 2007
T060254-x0 QPD Whitening Board - Quick Start Guide Benjamin Abbott Document Migration
18 Sep 2007
G060419-x0 HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Benjamin Abbott et al. Document Migration
23 Aug 2006
G060402-x0 Caltech 40m Lab Update - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Benjamin Abbott et al. Document Migration
18 Aug 2006
G060127-x0 Results of 40m prototype - LSC Meeting, March 19-22, 2006, Hanford WA Benjamin Abbott et al. Document Migration
14 Apr 2006
T050268-x0 LSC Detection Chain Linearity Measurements Benjamin Abbott et al. Document Migration
28 Dec 2005
G050568-x0 Optical Spring and Optical Resonance in the 40m Detuned RSE Interferometer Benjamin Abbott et al. Document Migration
31 Oct 2005
G050324-x0 Plans for DC Readout Experiment at the 40m Lab Benjamin Abbott et al. Document Migration
08 Sep 2005
T050007-x0 LSC RFPD Rev D Test Plan Benjamin Abbott Document Migration
25 Aug 2005
E040288-x0 Installation of RFI Mitigated HEPI system at LLO Benjamin Abbott Document Migration
21 Oct 2004
T030245-x0 LIGO Caltech 40-Meter PSL Supplemental Report Benjamin Abbott et al. Document Migration
10 Aug 2004
G040081-x0 40m Laboratory Upgrade Progress Report - LSC Meeting, March 15 - 18th, Livingston, LA Benjamin Abbott et al. Document Migration
18 Mar 2004
D030318-x0 Optical Lever PD Stand and Box Benjamin Abbott Document Migration
13 Oct 2003
T030205-x0 Frequency Stability Servo Modifications Made at the 40M Laboratory Benjamin Abbott et al. Document Migration
15 Sep 2003
T030059-x0 Pentek Generic Input Board Test Plan Benjamin Abbott Document Migration
21 Mar 2003
T030003-x0 Intensity Servo DC Photodiode Test Plan Benjamin Abbott Document Migration
08 Jan 2003
T020147-x0 Characterizing the length sensing and control system of the mode cleaner in the LIGO 40m lab Benjamin Abbott et al. Document Migration
08 Oct 2002
T020145-x0 Characterization and commissioning of digital suspensions for the 40m Mode Cleaner Benjamin Abbott et al. Document Migration
08 Oct 2002
T010145-x0 LIGO Caltech 40-Meter PSL Commissioning Report Benjamin Abbott et al. Document Migration
05 Dec 2001
T010115-x0 Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer Benjamin Abbott et al. Document Migration
26 Nov 2001
E010052-x0 Intensity Servo DC Photodiode Preliminary Electronics Design Benjamin Abbott Document Migration
30 May 2001
E010017-x0 PSL RF Photodiode Test Procedure and Tuning Protocol Benjamin Abbott Document Migration
01 May 2001
D000340-x0 Pump Spool Box Dimensions Benjamin Abbott Document Migration
01 May 2001
D000339-x0 OSEM Scattered Noise Reducing S/H Circuit Benjamin Abbott Document Migration
01 May 2001
D000338-x0 40 Meter Upgrade Vacuum Controls Wiring Benjamin Abbott Document Migration
01 May 2001
D000345-x0 40m Rack Layout Benjamin Abbott Document Migration
01 May 2001

Number of documents found: 130

DCC Version 3.2.1, contact Document Database Administrators