LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G1100968-v10 |
Suspensions Controls Design Summary Table |
Jeffrey Kissel |
Final Design
Suspensions
|
02 Jul 2018 |
T1200264-v4 |
SUS HAM-A Coil Driver Design Study |
Rich Abbott et al. |
Input Optics
Final Design
Suspensions
|
17 Sep 2024 |
T1400030-v1 |
aLIGO HTTS Controls Design Description |
Mark Barton et al. |
Preliminary Design
Suspensions
|
19 Nov 2020 |
T1400029-v1 |
aLIGO HAUX Controls Design Description |
Mark Barton et al. |
Suspensions
Preliminary Design
|
19 Nov 2020 |
T1000388-v18 |
aLIGO SEI Actuators and Sensors Change of Basis (ISI, Transformation, Orientation, Matrix, Coordinates) |
Fabrice Matichard et al. |
Seismic Isolation
|
30 Aug 2024 |
D1002704-v7 |
Rack and Cable Tray Layout_LVEA_H1 |
Dennis Coyne et al. |
System Engineering
Observatory Facilities
|
28 Aug 2024 |
G1200071-v8 |
LIGO Seismic Isolation and Suspensions Cartoon |
Jeffrey Kissel |
Suspensions
Seismic Isolation
Final Design
|
22 Aug 2024 |
T1200015-v4 |
SUS Sensor/Actuator Sign Conventions |
Jeffrey Kissel |
Suspensions
Final Design
|
13 Nov 2017 |
G1400519-v3 |
Impressions of CARM/ALS |
Jeffrey Kissel |
Modelling
Commissioning
Suspensions
Sensing and Control
Installation
System Engineering
Laser Systems
Input Optics
|
12 Jul 2024 |
G2401313-v2 |
GWANW 2024 Welcome! |
Jeffrey Kissel |
Astrophysics / Multi-messenger
Collaboration
|
26 Jun 2024 |
G2401337-v1 |
NANOGrav Overview / Status, GWANW 2024 (Jerry Sun) |
Jeffrey Kissel |
External Collaboration
Astrophysics / Multi-messenger
|
25 Jun 2024 |
G2401332-v1 |
LISA Overview, GWANW 2024 (Tom Wagg) |
Jeffrey Kissel |
Astrophysics / Multi-messenger
External Collaboration
|
25 Jun 2024 |
G2401324-v1 |
LVK Alerts Tutorial, GWANW 2024 (Mervyn Chan) |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
24 Jun 2024 |
G2401325-v1 |
NANOGrav Tutorial, GWANW 2024 (Jerry Sun) |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
24 Jun 2024 |
T1100617-v4 |
Transformation (Projection) Matrices Between SEI/SUS Coordinates (ISI to SUS) |
Jeffrey Kissel et al. |
Commissioning
Sensing and Control
Seismic Isolation
|
17 Apr 2024 |
T1500467-v1 |
Actuation force of the ESD with charges and cage effects |
Leonid Prokhorov et al. |
Suspensions
|
28 Mar 2024 |
E030350-v5 |
Configuration Control & Drawing Requirements |
Calum Torrie et al. |
System Engineering
|
06 Mar 2024 |
G2400476-v1 |
Proposal for GWANW Conference Logo |
Jeffrey Kissel |
Astrophysics / Multi-messenger
Collaboration
|
04 Mar 2024 |
D1001575-v10 |
aLIGO SEI (Seismic) Sensor (Sensors) and Actuator (Actuators) Electronics Chains |
Jeffrey Kissel |
Assembly
Seismic Isolation
Commissioning
Final Design
|
20 Feb 2024 |
T0900450-v5 |
Sensor Noise Estimates for Advanced LIGO Seismic Isolation Systems (SEI_sensor_noise.m) |
Brian Lantz et al. |
Preliminary Design
Final Design
Requirements
Basic R&D
Seismic Isolation
|
03 Nov 2023 |
T2300137-v2 |
Report from the Heavy Suspension Workshop @ MIT |
Brian Lantz et al. |
Suspensions
A#
|
19 Oct 2023 |
E1200933-x0 |
aLIGO SUS General Documentation |
Jeffrey Kissel et al. |
Suspensions
|
06 Oct 2023 |
T080138-x0 |
MATLAB OMC SUS Model |
Norna Robertson |
Document Migration
|
03 Jun 2008 |
G1100431-v1 |
aLIGO Active Seismic Isolation |
Jeffrey Kissel |
Installation
Seismic Isolation
Subsystem Test
Commissioning
Final Design
|
15 Sep 2023 |
G2201909-v3 |
A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update |
Jeffrey Kissel et al. |
Incoming Inspection
Commissioning
Sensing and Control
Subsystem Test
|
05 Sep 2023 |
T1900248-v7 |
Record of Real-Time Calibration Pipeline Parameter Configuration Changes: O3 (and ER14) -- H1 |
Jeffrey Kissel |
Calibration
Change Control
|
24 Aug 2023 |
D1000599-v7 |
aLIGO SUS HAM 3-4 System Wiring Diagrams |
Jay Heefner et al. |
Suspensions
|
11 May 2022 |
G2301256-v2 |
GWANW 2023 Closeout & Pictures |
Jeffrey Kissel |
Collaboration
|
28 Jun 2023 |
G2301225-v1 |
GWANW 2023 Welcome! |
Jeffrey Kissel et al. |
Education, Outreach
Astrophysics / Multi-messenger
|
26 Jun 2023 |
G1500623-v6 |
aLIGO, CAL, Official Advanced LIGO Sensitivity Plots |
Jeffrey Kissel et al. |
Commissioning
Calibration
|
23 Jun 2023 |
E1600151-x0 |
aLIGO, PSL, Intensity Stabilization (ISS) Second Loop |
Jeffrey Kissel |
Integration
Input Optics
Laser Systems
Sensing and Control
|
23 Jun 2023 |
G1300621-v4 |
aLIGO TMTS "Level 2" Damping Loop Design |
Jeffrey Kissel |
Commissioning
Suspensions
|
10 May 2023 |
E1500442-x0 |
aLIGO, CAL, Publications |
Jeffrey Kissel |
Calibration
|
10 Feb 2023 |
G1601472-v4 |
Calibration Measurement / DARM Loop Time Delay (Timing) Diagrams |
Jeffrey Kissel et al. |
Sensing and Control
Calibration
Modelling
|
02 Feb 2023 |
G2102370-v1 |
Co-Designing the Post O5 Quadruple Suspension: Podcast Episode 1 -- Controlling the Top Mass |
Jeffrey Kissel et al. |
Basic R&D
Suspensions
|
17 Oct 2022 |
T1700106-v7 |
Update to Tracking Temporal Variations in DARM Loop Model Parameters |
Jeffrey Kissel et al. |
Sensing and Control
Commissioning
Calibration
|
04 Dec 2018 |
T1100232-x0 |
aLIGO Damping Loop Design and Performance (Level 2.0 Design) |
Jeffrey Kissel |
Integration
Commissioning
Subsystem Test
Suspensions
Requirements
|
19 Sep 2022 |
P2100207-v3 |
Characterization of systematic error in Advanced LIGO calibration in the second half of O3 (O3B) |
Joseph Betzwieser et al. |
Calibration
|
09 Sep 2022 |
P1900244-v12 |
Initial Results from the LIGO Newtonian Calibrator |
Michael Ross et al. |
A+
Sensing and Control
Calibration
Basic R&D
|
25 Aug 2022 |
E2000214-x0 |
aLIGO, CAL, NCAL, Essential Technical Notes |
Jeffrey Kissel |
Calibration
|
25 Aug 2022 |
G1501518-v21 |
aLIGO DARM Signal Chain (Calibration Subway Map) |
Sudarshan Karki et al. |
Calibration
|
22 Jun 2022 |
G2200585-v1 |
"Staring up at Space" Panelist: Gravitational Waves |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
24 Mar 2022 |
G2200527-v1 |
Science Show and Tell: Gravitational Astronomy |
Jeffrey Kissel |
Public relations
Astrophysics / Multi-messenger
|
16 Mar 2022 |
T1300645-v6 |
Re-assessing HAM-ISI Noise Budget Performance Model for aLIGO |
Jeffrey Kissel |
Seismic Isolation
Modelling
|
14 Mar 2022 |
G1300086-v2 |
HAM6 Coordinate System Definitions |
Jeffrey Kissel |
Modelling
Integration
Suspensions
Sensing and Control
System Engineering
Seismic Isolation
Commissioning
Final Design
|
08 Mar 2015 |
E1900133-x0 |
LIGO Calibration Pipeline Parameter Configurations: O3 |
Jeffrey Kissel et al. |
Change Control
Calibration
|
08 Dec 2021 |
T1900253-v6 |
Record of Real-Time Calibration Pipeline Parameter Configuration Changes: O3 (and ER14) -- L1 |
Joseph Betzwieser et al. |
Calibration
Change Control
|
08 Dec 2021 |
T040072-v1 |
Triple Model Pendulum Parameter Descriptions and Naming Convention |
Jeffrey Kissel et al. |
Document Migration
|
30 Nov 2021 |
P1700236-v12 |
Reconstructing the calibrated strain signal in the Advanced LIGO detectors |
Aaron Viets et al. |
Calibration
|
18 Nov 2021 |
G2102364-v3 |
Overview and Lessons of LIGO Calibration through the lens of LISA Calibration |
Jeffrey Kissel |
Astrophysics / Multi-messenger
Calibration
|
12 Nov 2021 |
P1900245-v7 |
Characterization of systematic error in Advanced LIGO calibration |
Ling Sun et al. |
Calibration
|
11 Nov 2021 |
P2000293-v5 |
physiCal: A physical approach to the marginalization of LIGO calibration uncertainties |
Salvatore Vitale et al. |
Calibration
Astrophysics / Multi-messenger
Data Analysis
Compact Binaries
|
11 Nov 2021 |
P2000294-v6 |
Gravitational-wave astronomy with a physical calibration model |
Ethan Payne et al. |
Calibration
Compact Binaries
|
11 Nov 2021 |
G2101393-v2 |
Group Projects: Western Washington University (Svenja Fleischer) |
Jeffrey Kissel |
Basic R&D
|
29 Jun 2021 |
G2101390-v1 |
Initial Results from the LIGO Newtonian Calibrator |
Colin Weller et al. |
Calibration
|
29 Jun 2021 |
G2101395-v1 |
Group Projects: Post-Merger Evolution of Compact Binaries (Matthew Duez, WSU Pullman) |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
29 Jun 2021 |
T2100221-v2 |
H1 NCAL Prototype: PEM Coupling |
Timesh Mistry et al. |
Detector Characterization
Commissioning
|
25 Jun 2021 |
T2100095-v2 |
NCal PUM Contribution Note |
Michael Ross et al. |
Calibration
Modelling
|
25 Jun 2021 |
T2100103-v1 |
NCal LSSA Force Extraction |
Michael Ross et al. |
Calibration
|
25 Jun 2021 |
T2000238-v9 |
Review of NCAL Analytic (Analytical) Force Estimates, Mathematical Details |
Laurence Datrier et al. |
Calibration
|
25 Jun 2021 |
T2000417-v7 |
NCAL Prototype H1 Surveying Distance Measurement |
Timesh Mistry et al. |
Integration
Basic R&D
|
25 Jun 2021 |
G2101334-v1 |
Welcome to GWANW 2021 Day 2! |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
24 Jun 2021 |
T2100066-v4 |
NCal Ratio Analysis |
Michael Ross et al. |
Calibration
Basic R&D
|
18 Jun 2021 |
T2100088-v7 |
NCal Torque to Force Calculations |
Michael Ross et al. |
Modelling
Calibration
|
18 Jun 2021 |
T2000584-v3 |
Characterization of systematic error in Advanced LIGO calibration in the second half of O3 (O3B) |
Jeffrey Kissel et al. |
Calibration
|
01 Jun 2021 |
G2001293-v3 |
H1's OMC Whitening Systematic Error Impact on TDCF Optical Gain and Cavity Pole Estimate |
Jeffrey Kissel |
Calibration
|
01 Jun 2021 |
G2000527-v5 |
Understanding H1's O3 B Electronics Compensation Systematic Error |
Jeffrey Kissel |
Calibration
|
01 Jun 2021 |
G1500622-x0 |
Advanced LIGO Sensitivity Plots, H1 |
Jeffrey Kissel |
Calibration
Commissioning
|
23 Mar 2021 |
G1200524-v2 |
Magnetic Coupling to Suspension Magnets |
Jeffrey Kissel |
Modelling
Suspensions
Seismic Isolation
Commissioning
|
17 Mar 2021 |
G2100282-v1 |
Gravitational Wave Astronomy: History in the Making (CSEE Colloquium @ OSU, 2021-03-01) |
Jeffrey Kissel |
Public Talk / Colloquium
|
01 Mar 2021 |
G2000923-v2 |
GWTC-2: Fig. 1 |
LIGO Scientific Collaboration et al. |
Compact Binaries
|
28 Oct 2020 |
G2002026-v1 |
LIGO: New Window into the Universe |
Jeffrey Kissel |
Public Talk / Colloquium
|
23 Nov 2020 |
G1801321-v1 |
LIGO's New Role in Physics & Astronomy (2018 PNNL Colloquium) |
Jeffrey Kissel |
Compact Binaries
Education, Outreach
Astrophysics / Multi-messenger
|
20 Aug 2020 |
G1800094-v1 |
LIGO's New Role in Neutron Star Physics (Outreach Talk to Eastern WA ANS Chapter) |
Jeffrey Kissel |
Public Talk / Colloquium
|
20 Aug 2020 |
G2001006-v1 |
Welcome to GWANW 2020! |
Jeffrey Kissel |
Collaboration
Astrophysics / Multi-messenger
|
29 Jun 2020 |
P1800038-v4 |
Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation. |
Krishna Venkateswara et al. |
Basic R&D
Seismic Isolation
|
12 Mar 2020 |
G2000362-v1 |
The Search for Lumbering Giants (Talk by Jeff Hazboun) |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
12 Mar 2020 |
T1100602-v2 |
Beam Splitter BSFM Triple Suspension Actuator (Actuation) Control Range (Ranges) |
Norna Robertson et al. |
Final Design
Suspensions
|
20 Feb 2020 |
T1100595-v4 |
ETM/ITM Quad Suspension Actuator (Actuation) Control Range (Ranges) |
Norna Robertson et al. |
Suspensions
Final Design
|
20 Feb 2020 |
E1100397-x0 |
aLIGO GS-13 testing |
Jeffrey Kissel |
Subsystem Test
Seismic Isolation
|
07 Feb 2020 |
G1900379-v3 |
Status Update on Absolute Uncertainty in the GW Detector Network |
Jeffrey Kissel et al. |
Calibration
Basic R&D
Sensing and Control
|
27 Jan 2020 |
T1900768-v4 |
SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO |
Brian Lantz et al. |
Seismic Isolation
|
26 Dec 2019 |
G1902339-v1 |
LIGO Exploration Center (LExC) Workshop Diagrams |
Jeffrey Kissel |
Education, Outreach
|
12 Dec 2019 |
P1600063-v11 |
Improving LIGO calibration accuracy by tracking and compensating for slow temporal variations |
Darkhan Tuyenbayev et al. |
Calibration
|
21 Nov 2019 |
G1902196-v1 |
Third Time's a Charm! (2019-11-14 Outreach Talk @ Embry-Riddle) |
Jeffrey Kissel |
Commissioning
|
17 Nov 2019 |
E1200068-v18 |
aLIGO SEI STS and T240 Ground Seismometer Inventory |
Celine Ramet et al. |
Seismic Isolation
Installation
|
01 Aug 2016 |
P1500248-v15 |
Calibration of the Advanced LIGO detectors for the discovery of the binary black-hole merger GW150914 |
LIGO Scientific Collaboration et al. |
Calibration
|
13 Oct 2019 |
P1200040-v55 |
Seismic Isolation of Advanced LIGO: Review of Strategy, Instrumentation, and Performance (CQG 2015) |
Fabrice Matichard et al. |
Seismic Isolation
Basic R&D
|
03 Sep 2019 |
P1500249-v17 |
The Advanced LIGO Photon Calibrators |
Richard Savage et al. |
Auxiliary Optics
Calibration
|
23 Jul 2019 |
P1600139-v16 |
Calibration Uncertainty for Advanced LIGO’s First and Second Observing Runs |
Craig Cahillane et al. |
Calibration
|
23 Jul 2019 |
G1901201-v1 |
LISA Status [Robin 'Tuck' Stebbins] |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
24 Jun 2019 |
G1901193-v1 |
Pulsar Timing Arrays CHIME in on Gravitational Waves [Deborah Good] |
Jeffrey Kissel |
Astrophysics / Multi-messenger
|
24 Jun 2019 |
G1901176-v1 |
Numerical Relativity for Vacuum Binary Black Hole [Luisa T. Buchman] |
Jeffrey Kissel |
GW source predictions
|
23 Jun 2019 |
T1900321-v1 |
Benefits of the trees around the LIGO Livingston Buildings |
Brian Lantz et al. |
Observatory Facilities
Seismic Isolation
|
30 May 2019 |
G1900641-v1 |
Labsphere: Advancing Technology of Light (Chris Durell) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900401-v2 |
UW NCal Poster |
Krishna Venkateswara et al. |
Sensing and Control
Calibration
Basic R&D
|
19 Mar 2019 |
G1900640-v1 |
Toward the Next Generation of Standards for Laser Power Measurements (Michelle Stephens) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900638-v1 |
Laser Power Meter Calibrations at NIST (Matt Spidell) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900639-v1 |
Laser Power Meter Calibrations at LNE (Jimmy Dubard) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900635-v1 |
Consensus Building: Statistical Treatment of Multiple Results of the Same Measurand (Amanda Koepke) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900634-v1 |
Laser Power Measurements at PTB (Stefan Kück) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900633-v1 |
EUROMET International Power Comparisons 2005-2007 (Stefan Kück) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
G1900632-v1 |
Welcome, The EUROMET 2010, Workshop Goals (John H. Lehman) |
Jeffrey Kissel |
Calibration
|
19 Mar 2019 |
P0900155-v6 |
Accurate calibration of test mass displacement in the LIGO interferometers |
Jeffrey Kissel et al. |
Calibration
Commissioning
Observatory Facilities
|
16 Mar 2019 |
P1000103-v1 |
[Thesis] Calibrating and Improving the Sensitivity of the LIGO Detectors |
Jeffrey Kissel |
Modelling
Final Design
Calibration
Commissioning
Upgrades
Seismic Isolation
|
16 Mar 2019 |
T1400256-v17 |
Time Domain Calibration in Advanced LIGO (circa O1, Now Outdated) |
Xavier Siemens et al. |
Calibration
|
16 Mar 2019 |
G1900466-v1 |
LIGO NCAL Status Update |
Jeffrey Kissel et al. |
Calibration
Sensing and Control
Preliminary Design
|
15 Mar 2019 |
G1900396-v3 |
Calibrating of the LIGO Interferometers: Third Time's a Charm (NIST Workshop) |
Jeffrey Kissel |
Calibration
Commissioning
Sensing and Control
|
15 Mar 2019 |
G1800953-v1 |
[GWADW] Absolute Calibration of a Galactic Gravitational Wave Detector Network |
Jeffrey Kissel |
GW source predictions
Preliminary Design
External Collaboration
Observatory Facilities
Integration
Modelling
Basic R&D
Calibration
Astrophysics / Multi-messenger
Sensing and Control
Upgrades
System Engineering
|
12 Mar 2019 |
G1700810-v1 |
[GWADW] Calibration Considerations for the 3G Detector Era |
Jeffrey Kissel |
Calibration
|
12 Mar 2019 |
T1300993-v3 |
Suggestions for modifications to future suspension designs |
Brian Lantz et al. |
Basic R&D
|
28 Feb 2019 |
G1800319-v1 |
O2 C02 Calibration Uncertainty Results Review / Update / Summary |
Jeffrey Kissel et al. |
Calibration
Sensing and Control
|
08 Feb 2019 |
T1800066-v2 |
typical motion of HAM Suspension points in O2 |
Brian Lantz et al. |
Installation
Seismic Isolation
|
17 Dec 2018 |
G1801952-v1 |
L1 Calibrated Sensitivity Spectra Aug 06 2017 (Representative Best of O2 -- C02, With Cleaning/Subtraction) |
Jeffrey Kissel |
Calibration
|
01 Dec 2018 |
G1701571-v1 |
L1 Calibrated Sensitivity Spectra Jul 20 2017 (Representative Best of O2 -- C01, No Subtraction) |
Jeffrey Kissel |
Calibration
|
29 Nov 2018 |
G1801951-v1 |
L1 Calibrated Sensitivity Spectra Aug 06 2017 (Representative Best of O2 -- C02, No Subtraction) |
Jeffrey Kissel |
Calibration
|
29 Nov 2018 |
G1701570-v1 |
H1 Calibrated Sensitivity Spectra Dec 08 2016 (Representative Best of O2 -- C01, No Subtraction) |
Jeffrey Kissel |
Calibration
|
29 Nov 2018 |
G1801950-v1 |
H1 Calibrated Sensitivity Spectra Jun 10 2017 (Representative Best of O2 -- C02, With Cleaning/Subtraction) |
Jeffrey Kissel |
Calibration
|
29 Nov 2018 |
G1801949-v1 |
H1 Calibrated Sensitivity Spectra Jun 10 2017 (Representative Best of O2 -- C02, No Subtraction) |
Jeffrey Kissel |
Calibration
|
29 Nov 2018 |
G1802165-v1 |
L1 Calibrated Sensitivity Spectra Oct 20 2018 (Representative for ER13) |
Jeffrey Kissel et al. |
Calibration
|
09 Nov 2018 |
G1802164-v1 |
H1 Calibrated Sensitivity Spectra Nov 08 2018 (Representative for ER13) |
Jeffrey Kissel et al. |
Calibration
|
09 Nov 2018 |
G1601003-v7 |
O1 C02 Uncertainty Estimation of Calibration: Review of Methods and Results |
Craig Cahillane et al. |
Commissioning
Calibration
|
09 Nov 2018 |
G1802078-v1 |
What’s Next for Gravitational Wave Astronomy? |
Jeffrey Kissel |
Sensing and Control
Commissioning
|
26 Oct 2018 |
G1500456-v4 |
CARM / ALS Electro-Optical Controls Diagram |
Jeffrey Kissel |
Final Design
|
05 Sep 2018 |
P1200011-v6 |
Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement |
Fabrice Matichard et al. |
Seismic Isolation
Basic R&D
|
20 Jun 2018 |
M1500313-v2 |
Process Flow for Engineering Operations of the LIGO Detector Systems |
Dennis Coyne et al. |
Subsystem Test
Installation
System Engineering
Policies
Commissioning
Operations
Conceptual Design
Fabrication
Final Design
Requirements
System Test
Integration
Detector
|
07 Jun 2018 |
T020059-v3 |
Are Reaction Chains Needed for aLIGO HAM Optics? |
Norna Robertson et al. |
Requirements
Document Migration
Seismic Isolation
Sensing and Control
Suspensions
Modelling
|
13 Feb 2018 |
D020214-x0 |
Hydraulic External Pre-Isolation (HEPI): Piping and Instrumentation Diagram |
Dennis Coyne |
Document Migration
|
11 Apr 2003 |
T1100030-v1 |
Optical Paths Lengths Through a Wedged Optic at Non-normal Incidence: The aLIGO Mode Cleaner |
Jeffrey Kissel |
Sensing and Control
Input Optics
Modelling
|
23 Jan 2018 |
E1700352-v1 |
(OFIS) Output Faraday Isolator Suspension Controls Arrangement Poster |
Jeffrey Kissel |
Suspensions
Final Design
|
13 Nov 2017 |
E1200045-v3 |
(TMTS) Transmission Monitor & Telescope Suspension Controls Arrangement Poster |
Jeffrey Kissel |
Suspensions
Sensing and Control
Commissioning
Assembly
|
13 Nov 2017 |
E1700390-v1 |
(OPOS) Optical Parametric Oscillator Suspension Controls Arrangement Poster |
Jeffrey Kissel |
Suspensions
Subsystem Test
Sensing and Control
Final Design
Integration
Assembly
Squeezer
|
13 Nov 2017 |
T1100378-v12 |
aLIGO QUAD Controls Design Description |
Jay Heefner et al. |
Final Design
Suspensions
|
06 Sep 2017 |
P1700149-v7 |
Tilt Seismology |
Michael Ross et al. |
Seismic Isolation
|
11 Jul 2017 |
G1700809-v1 |
What Does Low Frequency Control Look Like in the 2G+ and 3G Era? |
Jeffrey Kissel |
Integration
Squeezer
Seismic Isolation
Sensing and Control
System Engineering
Upgrades
Suspensions
State Control and Monitoring
Basic R&D
Conceptual Design
|
12 Jun 2017 |
G1700316-v2 |
O2 DARM Loop Design Comparisons and Critiques |
Evan Goetz et al. |
Modelling
Sensing and Control
Calibration
|
05 Apr 2017 |
G1400135-v1 |
Hierarchical Control of Toy Double Pendulum for Practice (HIFO-XY) |
Jeffrey Kissel |
Sensing and Control
System Engineering
Suspensions
Commissioning
|
07 Mar 2017 |
G1501372-v1 |
O1 DARM Loop Design Comprisons and Critiques |
Jeffrey Kissel |
Calibration
Sensing and Control
Incoming Inspection
Integration
Modelling
|
07 Mar 2017 |
P1600285-v21 |
Validating gravitational-wave detections: The Advanced LIGO hardware injection system |
Christopher Biwer et al. |
Detector
|
20 Feb 2017 |
G1700086-v2 |
L1 Calibrated Sensitivity Spectra Dec 13 2016 (Representative for Early O2) |
Jeffrey Kissel |
Calibration
|
24 Jan 2017 |
G1700085-v2 |
H1 Calibrated Sensitivity Spectra Dec 13 2016 (Representative for Early O2) |
Jeffrey Kissel |
Commissioning
Sensing and Control
Calibration
Detector Characterization
|
24 Jan 2017 |
E1600022-x0 |
Long-Term Studies of Site Ground Motion |
Jeffrey Kissel |
Observatory Facilities
Modelling
Seismic Isolation
Basic R&D
|
23 Jan 2017 |
P1500278-v4 |
Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor |
Krishna Venkateswara et al. |
Basic R&D
Seismic Isolation
|
14 Dec 2016 |
G1600699-v1 |
Interaction of the ESD with electrical charges of the test masses in Advanced LIGO |
Jeffrey Kissel et al. |
Basic R&D
Calibration
Suspensions
Core Optics
|
28 Nov 2016 |
T1400349-v13 |
Documentation of the Advanced LIGO Hardware Injection Infrastructure |
Eric Thrane et al. |
Computing/archiving
Compact Binaries
Stochastic
GW Bursts
Data quality / vetoes
Continuous Wave
Data analysis software
|
26 Oct 2016 |
G1602009-v1 |
Gravitational Wave Astronomy Begins! (2016-09-28 Astronomy on Tap, Seattle) |
Jeffrey Kissel |
Astrophysics / Multi-messenger
Public Talk / Colloquium
|
28 Sep 2016 |
T1300950-v8 |
Calibration Uncertainty Budget Requirements for early aLIGO |
Xavier Siemens et al. |
Calibration
|
23 Sep 2016 |
T1500377-v8 |
Tracking temporal variations in the DARM calibration parameters. |
Darkhan Tuyenbayev et al. |
Calibration
|
12 Sep 2016 |
G1601529-v1 |
Tilt- and Sensor-correction filter tuning at LHO |
Conor Mow-Lowry et al. |
Commissioning
Seismic Isolation
|
02 Sep 2016 |
G1400001-v3 |
The Status of Advanced LIGO: Light at the End of the Tunnels! |
Jeffrey Kissel et al. |
Core Optics
Integration
Data Acquisition System
Input Optics
State Control and Monitoring
Public Talk / Colloquium
Laser Systems
Auxiliary Optics
Suspensions
System Engineering
Sensing and Control
Seismic Isolation
Commissioning
|
17 Aug 2016 |
P0900120-v17 |
Calibration of the LIGO Gravitational Wave Detectors in the Fifth Science Run (S5 Calibration Paper) |
LIGO Scientific Collaboration et al. |
Sensing and Control
Calibration
|
04 Aug 2016 |
E1500291-x0 |
aLIGO, INJ |
Eric Thrane et al. |
GW Bursts
Detector Characterization
Stochastic
Compact Binaries
Continuous Wave
Calibration
|
27 Jul 2016 |
T1300503-v4 |
Redesign of quad UIM coil driver and magnet size to reduce magnetic coupling |
Norna Robertson et al. |
Suspensions
Final Design
|
14 Jun 2016 |
T1500120-v1 |
Suggested Improvements to SEI / SUS Designs for aLIGO Upgrades |
Jeffrey Kissel et al. |
Core Optics
System Engineering
Upgrades
Sensing and Control
Seismic Isolation
Suspensions
Commissioning
Conceptual Design
Auxiliary Optics
|
26 May 2016 |
G1401291-v3 |
aLIGO HSTS Damping Loop Design Comparison |
Jeffrey Kissel et al. |
Integration
Modelling
Commissioning
Suspensions
Sensing and Control
|
25 May 2016 |
G1401290-v1 |
aLIGO HSTS "Level 2" Damping Loop Design |
Betsy Weaver et al. |
Modelling
Integration
Sensing and Control
Seismic Isolation
Suspensions
Commissioning
|
25 May 2016 |
G1400151-x0 |
aLIGO HLTS "Level 2" Damping Loop Design |
Jeffrey Kissel |
Suspensions
Sensing and Control
Commissioning
Modelling
|
25 May 2016 |
E1200343-v96 |
OSEM Chart |
Stuart Aston et al. |
Suspensions
Subsystem Test
Assembly
|
22 Oct 2015 |
G1501223-v3 |
H1 Calibrated Sensitivity Spectra Oct 1 2015 (Representative for Start of O1) |
Jeffrey Kissel |
Commissioning
Sensing and Control
Calibration
Detector Characterization
|
19 Oct 2015 |
G1500823-v4 |
H1 Calibrated Sensitivity Spectra Jun 9 2015 (Best for ER7) |
Jeffrey Kissel |
Detector Characterization
Calibration
Commissioning
Sensing and Control
|
09 Jul 2015 |
G1401207-v4 |
Advanced LIGO Seismic Isolation and Control |
Brett Shapiro et al. |
Suspensions
Sensing and Control
Seismic Isolation
|
03 Apr 2015 |
E1000169-v20 |
SUS HAM Production Blades - Characterization Spreadsheet |
Janeen Romie et al. |
Fabrication
Suspensions
|
08 Mar 2015 |
D1101493-v2 |
HSTS / HLTS / OMCS OSEM Orientations |
Jeffrey Kissel |
Installation
Suspensions
|
08 Mar 2015 |
G1200070-v2 |
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning |
Jeffrey Kissel |
Requirements
Commissioning
Installation
Suspensions
Subsystem Test
Assembly
Integration
System Test
|
08 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Integration
Basic R&D
Sensing and Control
|
05 Mar 2015 |
G080570-x0 |
aLIGO HAM-ISI PDR: Part 2 - Preliminary Performance Review |
Jeffrey Kissel |
Document Migration
|
29 Jan 2015 |
E1300917-v1 |
L1 SUS ITMY Acceptance Document |
Stuart Aston et al. |
Suspensions
|
06 Nov 2014 |
E1100427-v4 |
aLIGO SEI Testing, HAM-ISI, Results Compilation |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
05 Nov 2014 |
E1400434-v2 |
ECR: Revision of SUS OpLev and OpLev damping channels to be stored in the data frames |
Stuart Aston et al. |
Suspensions
|
04 Nov 2014 |
T1400672-x0 |
Report from the Commissioning Workshop on Suspensions at Virgo |
Jeffrey Kissel et al. |
Meeting
Basic R&D
Commissioning
Seismic Isolation
Installation
Suspensions
Integration
Modelling
|
21 Oct 2014 |
G1401248-v1 |
Photos From Oct 2014 SEI & SUS Commissioning Workshop @ VIRGO |
Jeffrey Kissel et al. |
Vacuum
Seismic Isolation
Suspensions
Commissioning
|
21 Oct 2014 |
G1200692-v3 |
Hierarchical Control Notes – Blending Style |
Brett Shapiro et al. |
Basic R&D
|
16 Oct 2014 |
T1300130-v3 |
Longitudinal-to-Angle Coupling in Optical Levers |
Thomas Vo et al. |
Auxiliary Optics
Modelling
|
23 Sep 2014 |
E1300513-v1 |
L1 SUS PR2 Acceptance Document |
Stuart Aston et al. |
Suspensions
|
05 Sep 2014 |
E1201042-v2 |
L1 SUS MC2 Acceptance Document |
Jeffrey Kissel et al. |
Suspensions
|
05 Sep 2014 |
E1201038-v5 |
aLIGO SUS QUAD General Acceptance Documentation |
Jeffrey Kissel et al. |
Suspensions
|
05 Sep 2014 |
E1201040-v12 |
aLIGO SUS HSTS General Acceptance Documentation |
Norna Robertson |
Suspensions
|
05 Sep 2014 |
E1300497-x0 |
3rd IFO SUS PRM Acceptance Document |
Jeffrey Kissel |
Suspensions
Subsystem Test
|
05 Sep 2014 |
E1300514-x0 |
3rd IFO SUS MC1 Acceptance Document |
Jeffrey Kissel |
Suspensions
Subsystem Test
|
05 Sep 2014 |
G1100693-v5 |
Ideal Order/Contents of aLIGO QUAD Testing / Commissioning |
Jeffrey Kissel |
Requirements
Commissioning
Suspensions
Subsystem Test
Installation
Integration
System Test
Assembly
|
22 Aug 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Final Design
Suspensions
Seismic Isolation
System Engineering
Installation
Data Acquisition System
Integration
System Test
|
10 Jul 2014 |
T1400448-v1 |
Single Pendulum Parameter Descriptions and Naming Conventions |
Jeffrey Kissel et al. |
Suspensions
Modelling
|
07 Jul 2014 |
E1201048-x0 |
aLIGO SUS OMCS Individual Acceptance Reports |
Jeffrey Kissel |
Suspensions
|
21 Jun 2014 |
E1201047-x0 |
aLIGO SUS HSTS Individual Acceptance Reports |
Jeffrey Kissel |
Suspensions
|
21 Jun 2014 |
E1201046-x0 |
aLIGO SUS HLTS Individual Acceptance Reports |
Jeffrey Kissel |
Suspensions
|
21 Jun 2014 |
E1201045-x0 |
aLIGO SUS BSFM Individual Acceptance Reports |
Jeffrey Kissel |
Suspensions
|
21 Jun 2014 |
E1201044-x0 |
aLIGO SUS QUAD Individual Acceptance Reports |
Jeffrey Kissel |
Suspensions
|
21 Jun 2014 |
E1201043-v3 |
aLIGO SUS OMCS General Acceptance Documentation |
Jeffrey Kissel et al. |
Suspensions
|
21 Jun 2014 |
E1201041-v7 |
aLIGO SUS HLTS General Acceptance Documentation |
Jeffrey Kissel et al. |
Suspensions
|
21 Jun 2014 |
E1201039-v9 |
aLIGO SUS BSFM General Acceptance Documentation |
Jeffrey Kissel et al. |
Suspensions
|
21 Jun 2014 |
E1400078-v2 |
ECR for modification of SUS BS RCG model to allow damping of bounce and roll modes |
Nicolas Smith et al. |
Suspensions
|
20 Jun 2014 |
G1301192-v3 |
Simulink/Front Model & MEDM Screen Mods from ECR E1300578 |
Jeffrey Kissel |
Commissioning
Sensing and Control
Suspensions
|
19 Jun 2014 |
G1000125-v9 |
aLIGO BSC-ISI, HAM-ISI, and HEPI Basis and Naming Conventions |
Jeffrey Kissel et al. |
Vacuum
Installation
Seismic Isolation
Observatory Facilities
|
18 Jun 2014 |
F0900070-v6 |
GS-13 Inspection Checklist |
Joe Hanson et al. |
Incoming Inspection
Subsystem Test
Installation
Seismic Isolation
|
18 Jun 2014 |
E1100395-v1 |
aLIGO GS-13 Post Modification testing results |
Jeffrey Kissel et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100394-v1 |
aLIGO GS-13 prior shipping testing results |
Jeffrey Kissel |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1100393-v2 |
aLIGO GS-13 as received testing results |
Jeffrey Kissel et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
E1000058-v46 |
aLIGO GS-13 Status Chart |
Jeffrey Kissel et al. |
Installation
Seismic Isolation
|
18 Jun 2014 |
G1400636-v1 |
2014-06-10 H1 SUS ITMY Install |
Jeffrey Kissel |
Installation
Suspensions
|
10 Jun 2014 |
E070285-x0 |
Process Traveler - SEI HAM misc aluminum cleaning |
Jeffrey Kissel |
Document Migration
|
25 Mar 2014 |
E1400107-v2 |
ECR: store suspension mis/alignment values separately in EPICS database |
Jameson Graef Rollins et al. |
Change Control
Suspensions
|
15 Mar 2014 |
T0900060-v2 |
OMC Suspension Final Design Document |
Jay Heefner et al. |
Suspensions
Final Design
|
20 Feb 2014 |
G1301210-v1 |
Software Watchdogs for SUS + ISI + HEPI |
Brian Lantz et al. |
Seismic Isolation
Suspensions
Data and Computing
Integration
|
29 Jan 2014 |
T1300435-v1 |
Suspension Module Guardian Design |
Jeffrey Kissel et al. |
Preliminary Design
State Control and Monitoring
Commissioning
Suspensions
|
20 Jan 2014 |
T0900555-v6 |
Error Estimation of the LIGO Response Function |
Jeffrey Kissel |
Calibration
Sensing and Control
Modelling
|
18 Dec 2013 |
T1300998-v2 |
Reasons to Integrate Control System Design with Mechanical Design for Seismic Isolation and Alignment Systems |
Brett Shapiro et al. |
Conceptual Design
|
12 Dec 2013 |
G1200632-v3 |
Towards Applied Heirarchical Control |
Jeffrey Kissel |
Seismic Isolation
Sensing and Control
Suspensions
Commissioning
Preliminary Design
|
11 Dec 2013 |
G1300530-v2 |
The aLIGO Guardian |
Jeffrey Kissel |
Commissioning
State Control and Monitoring
Preliminary Design
|
11 Dec 2013 |
E1200844-v2 |
aLIGO SUS Acceptance Criteria and Deliverables |
Jeffrey Kissel et al. |
Suspensions
System Test
|
11 Dec 2013 |
G1300561-v1 |
aLIGO BSFM "Level 2" Damping Loop Design |
Jeffrey Kissel |
Suspensions
Commissioning
|
11 Dec 2013 |
G1300537-v3 |
aLIGO QUAD "Level 2" Damping Loop Design |
Jeffrey Kissel |
Commissioning
Suspensions
|
11 Dec 2013 |
T1300936-v1 |
HEPI model updates Nov 2013 |
Brian Lantz et al. |
Integration
Seismic Isolation
Installation
|
09 Dec 2013 |
T1000012-v6 |
HAM Large Triple Suspension (HLTS) Final Design Document |
Norna Robertson et al. |
Final Design
Suspensions
|
17 Oct 2013 |
G1300952-v1 |
aLIGO Output Mode Cleaner: Design, Fabrication, and Installation |
Rich Abbott et al. |
Sensing and Control
Installation
Final Design
Fabrication
|
20 Sep 2013 |
T0900435-v9 |
HAM Small Triple Suspension (HSTS) Final Design Document |
Norna Robertson et al. |
Suspensions
Final Design
|
10 Sep 2013 |
T1300563-v4 |
H1 AOS Optical Lever Commissioning and Testing |
Eric Black et al. |
Subsystem Test
|
03 Sep 2013 |
E1300578-v1 |
ECR: Topology Changes to SUS models as a result of ISC Informed Interaction |
Jeffrey Kissel |
Commissioning
Suspensions
Change Control
|
02 Jul 2013 |
G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
System Test
Core Optics
Subsystem Test
Suspensions
System Engineering
Commissioning
Basic R&D
Fabrication
Auxiliary Optics
|
25 Mar 2013 |
G1200753-v1 |
aLIGO H2 One Arm Test Update |
Keita Kawabe et al. |
Commissioning
Detector
|
03 Dec 2012 |
T1200400-x0 |
Magnetic Modeling in ANSYS Workbench (version 13.0) |
Jeffrey Kissel |
Modelling
Suspensions
|
20 Aug 2012 |
D1101489-v16 |
LASTI Wiring Diagram |
Sam Waldman et al. |
Installation
|
20 Jul 2012 |
T0900285-v2 |
L1 HAM6 ISI eLIGO Final Performance Measurements (March 24 2010) |
Jeffrey Kissel |
Seismic Isolation
Commissioning
Requirements
Final Design
|
12 Mar 2012 |
P1200020-x0 |
Design, Control, and Performance of a Prototype Advanced LIGO Single-Stage Seismic Isolation Platform |
Jeffrey Kissel et al. |
Subsystem Test
Seismic Isolation
Commissioning
Requirements
Final Design
|
27 Feb 2012 |
G1100481-v1 |
Advanced LIGO Interferometers: The Rubber Hits the Road! |
Jeffrey Kissel et al. |
System Engineering
Final Design
|
24 May 2011 |
P080016-x0 |
The LSC glitch group: monitoring noise transients during the fifth LIGO science run |
Robert Schofield et al. |
Public relations
Document Migration
|
22 Oct 2009 |
G0900349-v4 |
The Present and Near Future of LIGO |
Jeffrey Kissel |
Installation
Upgrades
Commissioning
Basic R&D
Meeting
Final Design
|
15 Jul 2009 |
G0900427-v2 |
Results from Prototype Advanced LIGO Seismic Isolation |
Jeffrey Kissel |
Seismic Isolation
|
29 May 2009 |
G0900141-v3 |
Performance of eLIGO Prototype HAM ISIs and improvements for aLIGO HAM ISIs |
Jeffrey Kissel |
Seismic Isolation
Upgrades
Commissioning
Requirements
Final Design
Modelling
|
13 Apr 2009 |
E0900075-v1 |
Response to HAM-ISI Watchdog Committee Recommendations |
Jeffrey Kissel et al. |
Seismic Isolation
Commissioning
|
09 Mar 2009 |
T0900011-v5 |
The HAM ISI Watchdog |
Jeffrey Kissel |
Seismic Isolation
|
30 Jan 2009 |
T080251-x0 |
Enhanced LIGO HAM ISI Prototype - Preliminary Performance Review |
Jeffrey Kissel et al. |
Document Migration
|
13 Oct 2008 |
T080254-x0 |
HAM ISI List of "Gotchas", Needs and Reminders |
Joe Hanson et al. |
Document Migration
|
07 Oct 2008 |
T080262-x0 |
Cleaning and Assembly Procedure for ISI Sensor Pods |
Joe Hanson et al. |
Document Migration
|
07 Oct 2008 |
T080125-x0 |
HAM ISI Damping Loop Turn On Procedure |
Jeffrey Kissel |
Document Migration
|
21 May 2008 |
E070287-x0 |
Process Traveler - SEI stage 0 plate |
Jeffrey Kissel |
Document Migration
|
24 Apr 2008 |
E070286-x0 |
Process Traveler - SEI HAM class B |
Jeffrey Kissel |
Document Migration
|
24 Apr 2008 |
G080246-x0 |
Activities of the LSC glitch group during S5 |
Lindy Blackburn et al. |
Document Migration
|
11 Apr 2008 |
G080182-x0 |
LIGO In-vacuum Sensors - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Jeffrey Kissel |
Document Migration
|
04 Apr 2008 |
G080216-x0 |
Investigation of Discrepancies Between Photon Calibrator, VCO and Official (Coil) Calibration Techniques - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Justin Garofoli et al. |
Document Migration
|
04 Apr 2008 |
E070283-x0 |
Process Traveler - SEI HAM misc stainless cleaning |
Jeffrey Kissel |
Document Migration
|
06 Feb 2008 |