Document List by Topic

These documents on Integration (subtopic of Activity) are available:
(List events on Integration)

LIGO-Number Title Author(s) Topic(s) Last Updated
E1700390-v1 (OPOS) Optical Parametric Oscillator Suspension Controls Arrangement Poster Jeffrey Kissel Assembly
Subsystem Test
Sensing and Control
Final Design
Integration
Squeezer
Suspensions
13 Nov 2017
G1300086-v2 HAM6 Coordinate System Definitions Jeffrey Kissel System Engineering
Commissioning
Modelling
Sensing and Control
Final Design
Seismic Isolation
Integration
Suspensions
08 Mar 2015
T1700481-v3 Technical notes - Increased damping time on the ISI Brian Lantz Seismic Isolation
Integration
06 Nov 2017
D1101847-v2 aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMX, L1 Aidan Brooks et al. System Engineering
Fabrication
Final Design
Vacuum
Integration
Preliminary Design
Auxiliary Optics
20 Nov 2013
D1101846-v1 aLIGO TCS HWS Optics Assembly In Vacuum, L1 HAM4 Aidan Brooks et al. System Engineering
Fabrication
Final Design
Vacuum
Integration
Preliminary Design
Auxiliary Optics
24 May 2012
D1101848-v1 aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMY, L1 Aidan Brooks et al. System Engineering
Fabrication
Final Design
Vacuum
Integration
Preliminary Design
Auxiliary Optics
03 May 2012
D1300020-v3 ALIGO, SUS, HSTS STRUCTURE, FC SPRAY GUARD ASSY. Eduardo Sanchez System Engineering
Fabrication
Installation
Integration
04 Sep 2014
D1101775-v6 aLIGO, ELECTRICAL FEEDTHROUGH TYPES, TYPICAL SUBFLANGES, AND PORT CONFIGURATIONS Eduardo Sanchez System Engineering
Installation
Integration
12 May 2016
G1700809-v1 What Does Low Frequency Control Look Like in the 2G+ and 3G Era? Jeffrey Kissel System Engineering
State Control and Monitoring
Sensing and Control
Seismic Isolation
Conceptual Design
Basic R&D
Integration
Upgrades
Squeezer
Suspensions
12 Jun 2017
E1200031-x0 aLIGO Optical Levers Assembly and Installation Documents Eric James Integration
10 May 2017
D1101463-v7 CABLE HARNESS ROUTING CONFIGURATION, HAM 3 Eduardo Sanchez Installation
Conceptual Design
Integration
Preliminary Design
10 Apr 2017
G1501372-v1 O1 DARM Loop Design Comprisons and Critiques Jeffrey Kissel Modelling
Sensing and Control
Calibration
Incoming Inspection
Integration
07 Mar 2017
S1202300-x0 L1-SUS-R3 HAM4 Field Rack Anna Aitken System Engineering
Installation
Integration
08 Aug 2012
G1400001-v3 The Status of Advanced LIGO: Light at the End of the Tunnels! Jeffrey Kissel et al. System Engineering
Commissioning
Input Optics
Data Acquisition System
State Control and Monitoring
Sensing and Control
Public Talk / Colloquium
Seismic Isolation
Laser Systems
Core Optics
Integration
Auxiliary Optics
Suspensions
17 Aug 2016
G1601604-v1 Seismic Isolation and Alignment - the road ahead Brian Lantz Commissioning
Seismic Isolation
Integration
16 Aug 2016
E1600204-v1 ECR: PSL frontend should handle a binary output ON/OFF request as true binary, not a 16 bit integer Keita Kawabe Laser Systems
Integration
12 Jul 2016
D1400177-v8 ETM ESD SYSTEM WIRING DIAGRAM Rich Abbott et al. Installation
Integration
Suspensions
30 Jun 2016
D1101429-v4 ALIGO, BSC FLOORING ORIENTATION DETAILS Eduardo Sanchez Installation
Integration
14 Jun 2016
D1200111-v2 CABLE HARNESS ROUTING CONFIGURATION, LBSC5 / WBSC10 Eduardo Sanchez System Engineering
Integration
Preliminary Design
14 Jun 2016
G1401291-v3 aLIGO HSTS Damping Loop Design Comparison Jeffrey Kissel et al. Commissioning
Modelling
Sensing and Control
Integration
Suspensions
25 May 2016
G1401290-v1 aLIGO HSTS "Level 2" Damping Loop Design Betsy Weaver et al. Commissioning
Modelling
Sensing and Control
Seismic Isolation
Integration
Suspensions
25 May 2016
D1300031-v3 ALIGO, SUS, BS STRUCTURE, FC SPRAY GUARD ASSY. Eduardo Sanchez System Engineering
Fabrication
Final Design
Integration
02 May 2016
P1400074-v5 Self Amplified Lock of a Ultra-narrow Linewidth Optical Cavity Kiwamu Izumi et al. Commissioning
Modelling
Basic R&D
Integration
08 Jan 2016
D1200895-v1 DC Power Supply Rack VDC-C6 David Kinzel System Engineering
Installation
Integration
16 Nov 2015
D1200893-v1 DC Power Supply Rack VDC-C4 David Kinzel System Engineering
Installation
Integration
10 Nov 2015
D1200899-v1 DC Power Supply Rack L1-VDC-YC1 David Kinzel et al. System Engineering
Installation
Integration
28 Oct 2015
D1200897-v1 DC Power Supply Rack L1-VDC-XC1 David Kinzel et al. System Engineering
Installation
Integration
28 Oct 2015
E1500002-v2 MSR and END Station Fiber Patches Spreadsheet David Kinzel Integration
Observatory Facilities
28 Aug 2015
T1500406-v3 SEI watchdog update - saturation history update Hugo Paris et al. Seismic Isolation
Integration
12 Aug 2015
E1500325-v1 ECR - Update SEI watchdogs with better handling of saturation history Brian Lantz Seismic Isolation
Integration
30 Jul 2015
T1400012-v1 Jan 2014 ISI update Brian Lantz et al. Seismic Isolation
Integration
24 Jun 2015
G1500668-v1 Squeezing now and in the future: the road to 10 dB Katherine Dooley et al. Commissioning
Requirements
Sensing and Control
Meeting
Basic R&D
Integration
Squeezer
01 Jun 2015
G1500694-x0 Keeping a good lock Keita Kawabe Commissioning
Meeting
Integration
20 May 2015
D1200881-x0 Rack Dnumbers David Kinzel System Engineering
Installation
Integration
07 Apr 2015
G1200070-v2 Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning Jeffrey Kissel Assembly
Commissioning
Requirements
Subsystem Test
Installation
System Test
Integration
Suspensions
08 Mar 2015
G1301007-v1 Advanced LIGO OMC Operation and Characterization William Korth Sensing and Control
Integration
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Sensing and Control
Basic R&D
Integration
05 Mar 2015
L1500028-v1 Documentation of Two Hour Lock Milestone for H1 Peter Fritschel et al. Integration
02 Mar 2015
E1400335-x0 DCN, REVISED END STATION SYSTEM LAYOUT Eduardo Sanchez System Engineering
Installation
Integration
09 Feb 2015
E1400104-x0 ECR: Replacing the Cart-Bias custom ramp parts with cdsFiltCrtl2 blocks Brian Lantz et al. State Control and Monitoring
Seismic Isolation
Integration
29 Jan 2015
T1200040-v3 L1 HAM3 Gouy Telescope Preparation Valery Frolov et al. Fabrication
Subsystem Test
Sensing and Control
Installation
Integration
21 Jan 2015
G1100873-v4 aLIGO TCS HWS Reference Dimensions to ETM Telescope (H2 ETMY) Aidan Brooks et al. System Engineering
Fabrication
Installation
Final Design
Vacuum
Integration
Auxiliary Optics
19 Jan 2015
D1300075-v4 CABLE HARNESS ROUTING CONFIGURATION, HAM 1 Eduardo Sanchez System Engineering
Installation
Integration
19 Jan 2015
G1401362-v1 HEPI update, bias hold and watchdog Brian Lantz et al. Installation
Seismic Isolation
Integration
08 Dec 2014
E1300632-x0 aLIGO, Integration Testing, Full Interferometer Test Daniel Sigg Integration
06 Dec 2014
G1400397-v2 Advanced LIGO Integration: timeline scenario for 2014 Peter Fritschel Integration
12 Nov 2014
T1100232-x0 aLIGO Damping Loop Design and Performance Jeffrey Kissel Commissioning
Requirements
Subsystem Test
Integration
Suspensions
05 Nov 2014
T1400672-x0 Report from the Commissioning Workshop on Suspensions at Virgo Jeffrey Kissel et al. Commissioning
Modelling
Installation
Seismic Isolation
Meeting
Basic R&D
Integration
Suspensions
21 Oct 2014
G1401237-v1 Advanced LIGO Commissioning Overview Daniel Sigg Integration
15 Oct 2014
E1300626-x0 aLIGO, Integration Testing Daniel Sigg Integration
06 Oct 2014
T1200418-v4 LLO MC2 Violin Mode Q Mark Barton et al. Modelling
Subsystem Test
Integration
Suspensions
09 Sep 2014
G1100693-v5 Ideal Order/Contents of aLIGO QUAD Testing / Commissioning Jeffrey Kissel Assembly
Commissioning
Requirements
Subsystem Test
Installation
System Test
Integration
Suspensions
22 Aug 2014
L1400119-v1 Documentation of Two Hour Lock Milestone for L1 Peter Fritschel et al. Integration
30 Jul 2014
E1400144-x0 aLIGO,DAQ,PEM Robert Schofield et al. Data Acquisition System
Integration
19 Jul 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. System Engineering
Data Acquisition System
Installation
Final Design
Seismic Isolation
System Test
Integration
Suspensions
10 Jul 2014
E1300630-x0 aLIGO, Integration Testing, HIFO-XY Test Daniel Sigg Integration
08 Jul 2014
L1400110-x0 Executive Summary of the LHO HIFO-XY Test Daniel Sigg et al. Integration
08 Jul 2014
E1300627-x0 aLIGO, Integration Testing, One Arm Test Daniel Sigg Integration
24 Jun 2014
E1400213-x0 DCN, Initial release of aLIGO, SUS, BS WIRE SHIELDING BAFFLE ASSY. AND ASSOCIATED DOCS. Eduardo Sanchez System Engineering
Fabrication
Installation
Integration
Suspensions
20 Jun 2014
E1300803-x0 Changes Resulting from the L1 DRMI Testing Peter Fritschel et al. Commissioning
Integration
20 Jun 2014
E1400300-x0 Changes Resulting from Input Mode Cleaner Testing Dennis Coyne Commissioning
Integration
19 Jun 2014
E1300628-x0 aLIGO, Integration Testing, Input Mode Cleaner Test Daniel Sigg et al. Integration
19 Jun 2014
E1200930-v2 ECR, End Station EtherCAT Chassis Modification for TCS Aidan Brooks et al. Requirements
Data Acquisition System
Installation
Integration
Auxiliary Optics
19 Jun 2014
E1300631-x0 aLIGO, Integration Testing, Dual Recycled Michelson Test Daniel Sigg Integration
19 Jun 2014
E1300809-v1 ECR - remove the IPC links in ISI which come from SUS Brian Lantz Seismic Isolation
Integration
Suspensions
19 Jun 2014
E1200225-v6 Coding Standard for TwinCAT Slow Controls Software Daniel Sigg State Control and Monitoring
19 Jun 2014
E1300495-v3 LLO DRMI In-air Check List Valery Frolov Commissioning
Integration
18 Jun 2014
T1400011-v1 Integration Testing: Systems meeting discussion, 15 Jan 2014 Peter Fritschel Commissioning
Integration
18 Jun 2014
G1300602-v2 LLO ISC Software Overview (for DRMI test) Anamaria Effler et al. Sensing and Control
Integration
18 Jun 2014
T1300991-v1 PRMI Locking Procedure Ryan DeRosa et al. Commissioning
Integration
18 Jun 2014
T1300174-v2 Commissioning Advanced LIGO’s HIFO-Y Daniel Sigg et al. System Engineering
Commissioning
Integration
18 Jun 2014
L1300176-v1 Executive Summary of the LHO HIFO-Y Test Daniel Sigg et al. Integration
18 Jun 2014
L1300219-v1 Summary of the H1 Input Mode Cleaner Testing Paul Fulda et al. Integration
18 Jun 2014
T1100201-v4 Commissioning the Advanced LIGO L1 Input Mode Cleaner Peter Fritschel et al. Input Optics
Integration
18 Jun 2014
E1400002-v1 ECR - Acquisition of FSS RFPD DC signal Kiwamu Izumi Commissioning
Integration
16 Jun 2014
D1301036-v1 aLIGO, SYS, 1" DIA WITNESS OPTIC Eduardo Sanchez System Engineering
Installation
Integration
13 Jun 2014
G1400193-v2 Initial alignment plan Sheila Dwyer et al. Meeting
Integration
12 Jun 2014
G1400551-v1 System Integration Status and Challenges, Post Project Commissioning Plans to Meet Science Goals Daniel Sigg Integration
27 May 2014
G1400529-v2 Commissioning of Advanced LIGO Kiwamu Izumi Commissioning
Integration
25 May 2014
G1400560-v2 Simulation Study for aLIGO lock acquisition Kiwamu Izumi et al. Modelling
Integration
24 May 2014
T1400053-v2 Integration testing report for the L1 DRMI Peter Fritschel et al. Integration
19 May 2014
T1400298-v1 Simulation study for aLIGO lock acquisition Kiwamu Izumi et al. Commissioning
Modelling
Meeting
Integration
03 May 2014
T1400284-v2 Glitches in the Blend Switch - Origin and Fix Brian Lantz State Control and Monitoring
Seismic Isolation
Integration
Suspensions
17 Apr 2014
T1300014-v5 Aligo, BSC Flooring + HAM ISI, Witness Sample Placement Requirements Eduardo Sanchez System Engineering
Installation
Integration
28 Mar 2014
E1200030-x0 aLIGO Optical Levers Final Design Documents Eric James Integration
25 Mar 2014
E1300939-v3 Procedure For Attachment Of The Pcal Periscope Alignment Target To ETM Quad Frame Craig Conley et al. Integration
Auxiliary Optics
31 Jan 2014
G1301210-v1 Software Watchdogs for SUS + ISI + HEPI Brian Lantz et al. Data and Computing
Seismic Isolation
Integration
Suspensions
29 Jan 2014
T1200437-v3 Advanced LIGO Interferometer Integration Peter Fritschel et al. Commissioning
Integration
11 Dec 2013
T1300936-v1 HEPI model updates Nov 2013 Brian Lantz et al. Installation
Seismic Isolation
Integration
09 Dec 2013
E1300872-v1 ECR - HEPI model updates Nov 2013 Brian Lantz et al. Seismic Isolation
Integration
09 Dec 2013
E1300906-v1 HEPI script updates Nov 2013 Brian Lantz Seismic Isolation
Integration
09 Dec 2013
E1300907-v1 update to SEI watchdog data rate in the science frames Brian Lantz Data Acquisition System
Seismic Isolation
Integration
09 Dec 2013
E1200639-v1 aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System Aidan Brooks et al. System Engineering
Subsystem Test
Installation
System Test
Integration
Auxiliary Optics
22 Nov 2013
D1300227-x0 aLIGO Pcal Development Layout Craig Conley Installation
Integration
Auxiliary Optics
11 Sep 2013
E1300629-x0 aLIGO, Integration Testing, HIFO-Y Test Daniel Sigg Integration
27 Aug 2013
D1000549-v6 aLIGO TMS UPPER INTERMEDIATE MASS TOP ASSEMBLY Craig Conley et al. Installation
Final Design
Integration
Auxiliary Optics
23 Aug 2013
L1200261-v2 Executive Summary of the One Arm Test Daniel Sigg et al. Integration
16 Aug 2013
G1300719-v3 Performance of the Advanced LIGO Input Optics Chris Mueller Commissioning
Input Optics
Subsystem Test
Public Talk / Colloquium
Integration
09 Jul 2013
E1300249-v2 ECR - Change Locating Dimensions of Oplev/Pcal Receiver Installations in all End VEAs Craig Conley Installation
Change Control
Integration
Auxiliary Optics
10 May 2013
G1300437-v1 aLIGO Installed A-1 Adapter Measurements, Oplev/Pcal Receiver Side (LHO, LLO) Craig Conley Installation
Integration
Auxiliary Optics
09 Apr 2013
D1300263-v1 ALIGO, AOS, VIEWPORT LEAK TEST FIXTURE, PROOF TEST CAP ASSY. FOR [H1/L1] CO2P V.P. Eduardo Sanchez Fabrication
Installation
Integration
28 Mar 2013
G1300258-v1 Arm Length Stabilization at LHO Daniel Sigg Integration
17 Mar 2013
T1100080-v3 Commissioning Advanced LIGO's First Arm Cavity Daniel Sigg et al. System Engineering
Commissioning
Integration
17 Mar 2013
L1300018-v2 Summary of the L1 Input Mode Cleaner Testing Peter Fritschel et al. Integration
16 Feb 2013
G1201295-v2 Magnetic coupling to test mass suspensions. Peter Fritschel Subsystem Test
Integration
Suspensions
02 Jan 2013
D1201460-v1 aLIGO AOS Oplev & Pcal Installation Layout, Y-END Stations Craig Conley Commissioning
Installation
Integration
Auxiliary Optics
12 Nov 2012
D1201459-v1 aLIGO AOS Oplev & Pcal Installation Layout, X-END Stations Craig Conley Commissioning
Installation
Integration
Auxiliary Optics
12 Nov 2012
E1200908-v1 Electronics and Optics Change Request from the One Arm Test Daniel Sigg Integration
19 Oct 2012
S1202314-x0 L1-VDC-YC2 DC Power Supply Rack David Kinzel System Engineering
Installation
Integration
08 Aug 2012
S1202313-x0 L1-VDC-YC1 DC Power Supply Rack David Kinzel System Engineering
Installation
Integration
08 Aug 2012
S1202312-x0 L1-VDC-XC2 DC Power Supply Rack David Kinzel System Engineering
Installation
Integration
08 Aug 2012
S1202311-x0 L1-VDC-XC1 DC Power Supply Rack David Kinzel System Engineering
Installation
Integration
08 Aug 2012
G1200556-v1 On Seismic Isolation in 2nd Generation Detectors Jeffrey Kissel System Engineering
Commissioning
Sensing and Control
Seismic Isolation
Integration
Upgrades
Suspensions
15 Jun 2012
E1200621-x0 BOM and Formal Drawing Tree, aLIGO TCS HWS Table Assembly, HAM4 Mindy Jacobson Assembly
System Engineering
Fabrication
Installation
Integration
Auxiliary Optics
13 Jun 2012
D1200900-x0 DC Power Supply Rack VDC-YC2 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200898-x0 DC Power Supply Rack VDC-XC2 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200896-x0 DC Power Supply Rack VDC-C7 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200894-x0 DC Power Supply Rack VDC-C5 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200891-x0 DC Power Supply Rack VDC-C2 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200892-x0 DC Power Supply Rack VDC-C3 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
D1200890-x0 DC Power Supply Rack VDC-C1 David Kinzel System Engineering
Installation
Integration
12 Jun 2012
G1200588-v1 aLIGO Integration status for 23 May 2012 meeting Peter Fritschel Integration
23 May 2012
D1101849-v1 aLIGO TCS HWS OPTICS ASSY In Vac, L1 HAM5 Aidan Brooks et al. System Engineering
Fabrication
Final Design
Vacuum
Integration
Preliminary Design
Auxiliary Optics
04 May 2012
T1000075-v2 Advanced Interferometer Configurations White Paper Rana Adhikari et al. System Engineering
Sensing and Control
Basic R&D
Integration
Upgrades
26 Apr 2012
E080462-v1 Infrasonic Microphone and PEM++ Gabor Szeifert et al. Data and Computing
Other data analysis
Requirements
Data Acquisition System
Fabrication
Sensing and Control
Calibration
Conceptual Design
System Test
Data quality / vetoes
Basic R&D
Computing/archiving
Integration
Upgrades
Preliminary Design
Observatory Facilities
01 Apr 2012
C1105429-v3 SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay Richard Bagley et al. Fabrication
Cleaning
Vacuum
Procurements
Integration
17 Aug 2011
D0900928-v2 D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO John Worden et al. System Engineering
Vacuum
Integration
11 Jan 2010
T980044-v1 Determination of Global and Local Coordinate Axes for the LIGO Sites Albert Lazzarini System Engineering
Installation
Vacuum
Integration
11 May 2009
D950148-v2 LVEA and VEA Foundations Relative to the Beam Tube Center Line Dennis Coyne System Engineering
Installation
Vacuum
Integration
10 May 2009

Number of documents found: 129