G2201909-v3 |
A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update |
Jeffrey Kissel et al. |
Subsystem Test
Sensing and Control
Incoming Inspection
Commissioning
|
05 Sep 2023 |
G2300482-v2 |
Scatter Noise at LIGO Livingston |
Siddharth Soni et al. |
Detector Characterization
|
18 Aug 2023 |
G2101943-v1 |
September 2021 scattering mitigation and PEM update |
Robert Schofield et al. |
Auxiliary Optics
|
06 Sep 2021 |
C2100052-x0 |
LLO Commissioning Report |
Valery Frolov |
Commissioning
|
08 Mar 2021 |
E2000162-v1 |
Review Report Final ISC Design for the A+ Filter Cavity |
Daniel Sigg et al. |
Squeezer
|
30 Mar 2020 |
E1900373-v1 |
Review Report Preliminary ISC Design for the A+ Filter Cavity |
Daniel Sigg et al. |
Sensing and Control
|
09 Jan 2020 |
E1900223-v1 |
Review Report Design Requirements and Concept for the A+ ISC Filter Cavity and Relay Optics |
Daniel Sigg et al. |
Sensing and Control
A+
|
15 Nov 2019 |
T1800224-v1 |
Scattered Light in the LIGO Livingston Arm Cavities |
Wenxuan Jia et al. |
Commissioning
Detector Characterization
|
26 Oct 2018 |
T1600302-v2 |
aLIGO sensitivity projections for O2 |
Valery Frolov et al. |
Commissioning
|
17 Sep 2018 |
P1500260-v15 |
The Sensitivity of the Advanced LIGO Detectors at the Beginning of Gravitational Wave Astronomy |
Denis Martynov et al. |
Commissioning
|
10 Feb 2018 |
E1700072-v6 |
Timeline for the aLIGO squeezing upgrade at LLO |
Lisa Barsotti et al. |
Upgrades
|
26 Sep 2017 |
T1500012-v1 |
L1 OMC Controls |
Adam Mullavey et al. |
Sensing and Control
|
08 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Basic R&D
Sensing and Control
Integration
|
05 Mar 2015 |
T1400371-v2 |
Installation and Alignment procedure for the ISC components in HAM3 |
Valery Frolov et al. |
Installation
Sensing and Control
|
11 Feb 2015 |
P1400234-v3 |
In-situ Characterization of the Thermal State of Resonant Optical Interferometers via Tracking of their Higher Order Mode Resonances |
Chris Mueller et al. |
Commissioning
Sensing and Control
|
09 Feb 2015 |
T1200040-v3 |
L1 HAM3 Gouy Telescope Preparation |
Valery Frolov et al. |
Sensing and Control
Integration
Installation
Fabrication
Subsystem Test
|
21 Jan 2015 |
G1400531-v1 |
L1 TransMon IR QPD sleds tuning (both EX and EY) |
Valery Frolov et al. |
Sensing and Control
Installation
|
21 Jan 2015 |
G1400530-v1 |
L1 TransMon GREEN QPD sleds tuning (both EX and EY) |
Adam Mullavey et al. |
Sensing and Control
Installation
|
21 Jan 2015 |
T1400588-v1 |
HAM6 Alignment procedure |
Koji Arai et al. |
Installation
Sensing and Control
|
22 Dec 2014 |
P1400198-v2 |
Loss Dependence on Beam Position in the Arm Cavities of aLIGO |
Leo Tsukada et al. |
Core Optics
|
07 Nov 2014 |
L1400119-v1 |
Documentation of Two Hour Lock Milestone for L1 |
Peter Fritschel et al. |
Integration
|
30 Jul 2014 |
E1300803-x0 |
Changes Resulting from the L1 DRMI Testing |
Peter Fritschel et al. |
Commissioning
Integration
|
20 Jun 2014 |
E1300628-x0 |
aLIGO, Integration Testing, Input Mode Cleaner Test |
Daniel Sigg et al. |
Integration
|
19 Jun 2014 |
T1300126-v1 |
IMC Autolocker |
Adam Mullavey et al. |
Commissioning
Sensing and Control
|
18 Jun 2014 |
E1300495-v3 |
LLO DRMI In-air Check List |
Valery Frolov |
Integration
Commissioning
|
18 Jun 2014 |
T1300991-v1 |
PRMI Locking Procedure |
Ryan DeRosa et al. |
Integration
Commissioning
|
18 Jun 2014 |
T1100201-v4 |
Commissioning the Advanced LIGO L1 Input Mode Cleaner |
Peter Fritschel et al. |
Integration
Input Optics
|
18 Jun 2014 |
T1400368-v1 |
Advanced LIGO Operations Commissioning Plan |
Peter Fritschel et al. |
Commissioning
|
11 Jun 2014 |
T1300161-v1 |
ALS/POP beam path alignment in WHAM3/1 |
Keita Kawabe et al. |
Sensing and Control
Input Optics
Installation
|
30 May 2014 |
T1400053-v2 |
Integration testing report for the L1 DRMI |
Peter Fritschel et al. |
Integration
|
19 May 2014 |
T1200437-v3 |
Advanced LIGO Interferometer Integration |
Peter Fritschel et al. |
Integration
Commissioning
|
11 Dec 2013 |
T1300558-v1 |
L1 DRMI Measurements: a checklist |
Peter Fritschel et al. |
System Test
Commissioning
|
18 Jun 2013 |
L1300018-v2 |
Summary of the L1 Input Mode Cleaner Testing |
Peter Fritschel et al. |
Integration
|
16 Feb 2013 |
T1000298-v2 |
Advanced LIGO Length Sensing and Control Final Design |
Guido Mueller et al. |
Sensing and Control
Final Design
|
09 Apr 2012 |
D1101223-v1 |
eLIGO PSL Diagram |
Joseph Iafrate et al. |
Detector
Data Analysis
Detector Characterization
|
28 Jun 2011 |
G1100445-v3 |
Plenary 5 Integration Planning - NSF 2011 |
Valery Frolov et al. |
Sensing and Control
|
05 May 2011 |
P070125-x0 |
dc readout experiment at the Caltech 40m prototype interferometer |
Robert Ward et al. |
Public relations
Document Migration
|
19 Oct 2009 |
P070044-x0 |
Effects of mode degeneracy in the LIGO Livingston Observatory recycling cavity |
Brian O'Reilly et al. |
Document Migration
Public relations
|
14 Oct 2009 |
T070247-v1 |
AdvLIGO Interferometer Sensing and Control Conceptual Design |
Peter Fritschel |
Sensing and Control
Conceptual Design
|
14 Sep 2009 |
T080100-x0 |
Report of the 40M TAC 17th April 2008 |
Valery Frolov |
Document Migration
|
07 May 2008 |
G060488-x0 |
Status of LIGO |
Valery Frolov |
Document Migration
|
06 Nov 2006 |
T060104-x0 |
Study of Nonparaxiality Using the LIGO Livingston Detector |
Erika D'ambrosio et al. |
Document Migration
|
22 May 2006 |
G060021-x0 |
Coil driver linearity measurements |
K Franzen et al. |
Document Migration
|
15 Mar 2006 |
T050251-x0 |
Measuring the Long-Term Drift of the Mode Cleaner Length |
Ian Duke et al. |
Document Migration
|
15 Nov 2005 |
T050064-x0 |
Thermal Compensation System Description |
Stefan Ballmer et al. |
Document Migration
|
10 May 2005 |
G050228-x0 |
The Search for a Stochastic Gravitational Wave Background |
Valery Frolov |
Document Migration
|
27 Apr 2005 |
G050106-x0 |
Commissioning Progress and Plans, Livingston Observatory - LSC Meeting, March 20-23, 2005, Livingston LA |
Valery Frolov |
Document Migration
|
22 Mar 2005 |
T050040-x0 |
Fields in the Recycling Cavity at LIGO Livingston Observatory |
Erika D'ambrosio et al. |
Document Migration
|
10 Mar 2005 |
G040381-x0 |
The LIGO Experiment: Status and First Results |
Valery Frolov |
Document Migration
|
03 Nov 2004 |
T040120-x0 |
Measurement of the Laser Intensity Noise Coupling to the Interferometer Output |
Rana Adhikari et al. |
Document Migration
|
03 Jun 2004 |
G040016-x0 |
Update on IFO Power Increase at Livingston |
Valery Frolov et al. |
Document Migration
|
29 Jan 2004 |
G030524-x0 |
Poster - LIGO Detector Commissioning |
Valery Frolov |
Document Migration
|
06 Nov 2003 |
T030236-x0 |
Modification of the IFO Input Laser Power Control |
Rich Abbott et al. |
Document Migration
|
07 Oct 2003 |
G030254-x0 |
Mode Cleaner Wavefront Servo: Feeding Back to Mode Cleaner Mirrors |
Valery Frolov et al. |
Document Migration
|
18 Sep 2003 |