Document List by Topic

These documents on Requirements (subtopic of Activity) are available:

LIGO-Number Title Author(s) Topic(s) Last Updated
T0900174-v2 Advanced-LIGO Optical Levers Design Requirements Eric Black Requirements
Auxiliary Optics
10 May 2017
T1300162-v2 Photon Calibrator: Optical Follower Servo Design Requirements Gregorio Tellez et al. Requirements
Auxiliary Optics
07 Mar 2017
T0900450-v4 Sensor Noise Estimates for Advanced LIGO Seismic Isolation Systems Brian Lantz et al. Requirements
Basic R&D
Preliminary Design
Final Design
Seismic Isolation
06 Feb 2017
T1100068-v23 Photon Calibrator Preliminary/Final Design Document Jonathan Berliner et al. Conceptual Design
Assembly
Requirements
Laser Systems
Basic R&D
Detector Characterization
Upgrades
Preliminary Design
Auxiliary Optics
Calibration
14 Oct 2016
M1500263-v1 Guidelines for Advanced LIGO Detector Upgrade Development Review Dennis Coyne Conceptual Design
System Engineering
Requirements
Fabrication
Upgrades
Preliminary Design
Final Design
Policies
05 Oct 2016
P080073-v1 Requirements for a Ground Rotation Sensor to Improve Advanced LIGO Robert Schofield et al. Requirements
Basic R&D
Seismic Isolation
13 Jun 2016
G1501546-v3 aLIGO OFI Summary of the requirements, specifications, and test results Koji Arai System Test
Requirements
Fabrication
Installation
Auxiliary Optics
28 Jan 2016
T1000526-v3 HAM Auxiliary Suspensions Design Requirements Giacomo Ciani et al. Requirements
Input Optics
Suspensions
19 Jan 2016
T1100518-v2 Hartmann sensor noise to displacement noise coupling in aLIGO Aidan Brooks Requirements
Core Optics
Final Design
22 Sep 2015
T000092-v4 Auxiliary Optics Support System Design Requirements Document, Vol. 1: Thermal Compensation System Michael Smith et al. Requirements
Reviews
Auxiliary Optics
22 Sep 2015
T060075-v1 HAM Seismic Isolation Requirements Peter Fritschel Requirements
Modelling
Suspensions
Seismic Isolation
02 Aug 2015
G1500668-v1 Squeezing now and in the future: the road to 10 dB Katherine Dooley et al. Commissioning
Meeting
Requirements
Basic R&D
Integration
Squeezer
Sensing and Control
01 Jun 2015
E990303-v1 Seismic Isolation Subsystem Design Requirements Document Dennis Coyne et al. Conceptual Design
Requirements
Modelling
Seismic Isolation
31 Mar 2015
T1000216-v1 Revised HAM-ISI Performance Targets for Advanced LIGO SRM Chambers Brian Lantz Requirements
Sensing and Control
Suspensions
Seismic Isolation
25 Mar 2015
E1101087-v3 aLIGO OMC Mounting Prisms Sam Waldman et al. Requirements
Sensing and Control
08 Mar 2015
M1100192-v1 RODA: Accuracy of height of mirrors in HSTS and HLTS Guido Mueller Requirements
Suspensions
08 Mar 2015
G1200070-v2 Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning Jeffrey Kissel Assembly
System Test
Commissioning
Requirements
Subsystem Test
Integration
Installation
Suspensions
08 Mar 2015
T0900095-v2 Adv. LIGO Arm Length Stabilisation Requirements - OBSOLETE Bram Slagmolen Requirements
Basic R&D
Sensing and Control
03 Mar 2015
T1100570-v5 Thermal Compensation System (TCS): CO2 Laser Projection System (CO2P) Final Design Document Aidan Brooks et al. Vacuum
Requirements
Auxiliary Optics
Final Design
12 Feb 2015
T1100044-v19 Advanced LIGO Photon Calibrator Design Requirements Jonathan Berliner et al. Vacuum
System Engineering
Requirements
Laser Systems
Input Optics
Basic R&D
Detector Characterization
Upgrades
Auxiliary Optics
Calibration
05 Feb 2015
T1500016-v2 Design overview for the new test mass electro-static driver Peter Fritschel et al. Requirements
Sensing and Control
Suspensions
23 Jan 2015
T1500001-v2 Noise requirement for the test mass electro-static driver Peter Fritschel Requirements
Sensing and Control
Suspensions
20 Jan 2015
T0900495-v4 HAM Auxiliary Suspensions Electronics Requirements Giacomo Ciani et al. Requirements
Input Optics
Suspensions
03 Dec 2014
T1100232-x0 aLIGO Damping Loop Design and Performance Jeffrey Kissel Commissioning
Requirements
Subsystem Test
Integration
Suspensions
05 Nov 2014
G1100693-v5 Ideal Order/Contents of aLIGO QUAD Testing / Commissioning Jeffrey Kissel Assembly
System Test
Commissioning
Requirements
Subsystem Test
Integration
Installation
Suspensions
22 Aug 2014
T050036-v4 Pre-Stabilized Laser Design Requirements Richard Savage et al. Requirements
Laser Systems
20 Aug 2014
E1201027-v1 ECR: Replacement of the coil-series resistors in the HAM-A coil drivers David Feldbaum Commissioning
Requirements
Input Optics
Upgrades
Sensing and Control
Final Design
Suspensions
19 Jun 2014
E1200930-v2 ECR, End Station EtherCAT Chassis Modification for TCS Aidan Brooks et al. Requirements
Data Acquisition System
Integration
Installation
Auxiliary Optics
19 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Assembly
Requirements
Subsystem Test
Seismic Isolation
18 Jun 2014
T080214-v1 Simple Calculations for Charge Noise for Advanced LIGO Brian Lantz Requirements
Core Optics
Basic R&D
Suspensions
Seismic Isolation
27 May 2014
T010007-v5 Cavity Optics Suspension Subsystem Design Requirements Mark Barton et al. Requirements
Suspensions
17 May 2014
T0900457-v1 LT1012 is the best op-amp for the GS13 preamp Brian Lantz Requirements
Final Design
Seismic Isolation
31 Mar 2014
E0900041-v6 Advanced LIGO Input Test Mass Coating Specification Gregg Harry Requirements
Core Optics
Final Design
05 Mar 2014
T1200306-v2 Suspension Hardware Watchdog Requirements Rolf Bork et al. Requirements
Suspensions
03 Mar 2014
T1400056-x0 3IFO Viewport Requirements by Chamber (LTS) Calum Torrie et al. Requirements
13 Feb 2014
T070189-v3 Design Specifications for the OMC Suspension Norna Robertson et al. Requirements
Suspensions
07 Feb 2014
T1300884-v3 Advanced LIGO Automation Requirements Jameson Graef Rollins Requirements
State Control and Monitoring
20 Jan 2014
E1300945-x0 aLIGO, System Requirements Dennis Coyne System Engineering
Requirements
12 Dec 2013
T020059-v3 Are Reaction Chains Needed for aLIGO HAM Optics? Norna Robertson et al. Document Migration
Requirements
Modelling
Sensing and Control
Suspensions
Seismic Isolation
11 Dec 2013
D1201420-v1 ZnSe Viewport Beam Block, Long, aLIGO TCS CO2P, H1-L1 Mindy Jacobson et al. Assembly
Vacuum
Requirements
Installation
Auxiliary Optics
20 Aug 2013
D1201421-v2 ZnSe Viewport Beam Block, Short, aLIGO TCS CO2P, H1-L1 Mindy Jacobson et al. Assembly
Vacuum
Requirements
Installation
Auxiliary Optics
20 Aug 2013
E1101086-v6 OMC Optical Prisms Sam Waldman et al. Requirements
Sensing and Control
03 May 2013
E1300293-x0 SLC & VP Requirements documentation Michael Smith Requirements
Auxiliary Optics
23 Apr 2013
G1200508-v2 LLO Power Monitoring Requirements David Kinzel Requirements
Procurements
18 Mar 2013
E1300136-v1 aLigo TMS Telescope Mirrors & Packaging for Delivery to Local Coater Ken Mailand et al. Requirements
Auxiliary Optics
14 Feb 2013
T0810012-v2 High Reliability Electronics for LIGO Rich Abbott System Engineering
Requirements
Risk Management
30 Jan 2013
E080462-v1 Infrasonic Microphone and PEM++ Gabor Szeifert et al. Conceptual Design
System Test
Data and Computing
Other data analysis
Requirements
Data quality / vetoes
Data Acquisition System
Fabrication
Basic R&D
Computing/archiving
Integration
Upgrades
Sensing and Control
Preliminary Design
Observatory Facilities
Calibration
01 Apr 2012
T0900285-v2 L1 HAM6 ISI eLIGO Final Performance Measurements (March 24 2010) Jeffrey Kissel Commissioning
Requirements
Final Design
Seismic Isolation
12 Mar 2012
P1200020-x0 Design, Control, and Performance of a Prototype Advanced LIGO Single-Stage Seismic Isolation Platform Jeffrey Kissel et al. Commissioning
Requirements
Subsystem Test
Final Design
Seismic Isolation
27 Feb 2012
T1200082-v1 Beckhoff Breakout Box Stephen O'Connor Requirements
Fabrication
Auxiliary Optics
23 Feb 2012
T1200076-x0 ETM HWS EtherCAT breakout box Stephen O'Connor Requirements
Fabrication
Auxiliary Optics
09 Feb 2012
T1200072-v1 Test Proceedure ETM: Hartman Sensor Power Supply Stephen O'Connor Requirements
Fabrication
Auxiliary Optics
08 Feb 2012
E1100187-v4 Advanced LIGO Music Wire Specification for California Fine Wire Company Jeffrey Lewis Requirements
26 Jan 2012
E1101088-v4 aLIGO OMC Curved Optics Specification Sam Waldman et al. Requirements
Sensing and Control
06 Dec 2011
E1100216-v1 DCN -REVISED SLC ARM CAVITY BAFFLE Norris Kilpatrick et al. Requirements
Fabrication
Auxiliary Optics
26 Sep 2011
E1100159-v3 aLIGO Music Wire Specification Jeffrey Lewis Requirements
29 Mar 2011
T1000022-v4 Viewports Subsystem Requirements Document Michael Smith Requirements
Auxiliary Optics
21 Mar 2011
D1003029-v1 Work Platform Example Drawing Sam Barnum et al. Requirements
Observatory Facilities
17 Nov 2010
C1002079-v1 Specification for De-Installation LA LIGO Site LSC Requirements
Observatory Facilities
11 Nov 2010
F0900053-v2 S-Number E-Traveler Template Rich Abbott et al. Requirements
29 Sep 2010
T960127-v1 Physics Environment Monitoring Design Requirements Document David Shoemaker et al. Requirements
Detector
24 Aug 2010
G1000056-v1 Intro to LIGO and the role of cleanliness in LIGO vacuum fabrications Michael Zucker Vacuum
Requirements
Quality Assurance
28 Jan 2010
T0900079-v1 AdvLIGO OMC Suspension Electronics Requirements Jay Heefner Requirements
Suspensions
28 Sep 2009
E0900234-x0 Vacuum Flipper Mirror Specification Sam Waldman Requirements
06 Aug 2009
Q0900002-v1 ICS Load Management Workflows Mick Flanigan Requirements
Quality Assurance
Procurements
19 May 2009
G0900141-v3 Performance of eLIGO Prototype HAM ISIs and improvements for aLIGO HAM ISIs Jeffrey Kissel Commissioning
Requirements
Modelling
Upgrades
Final Design
Seismic Isolation
13 Apr 2009
L0900002-v1 VRB request: all SmCo magnets UHV compatible? Dennis Coyne System Engineering
Requirements
06 Mar 2009
G080321-v1 Another Satellite Amplifier Jay Heefner Requirements
Suspensions
25 Feb 2009

Number of documents found: 68

DCC Version 3.2.1, contact Document Database Administrators